HomeMy WebLinkAboutPacket, DIM PLANNER 3/15/2022DEVELOPMENT ISSUES MEETING FORM
APPLICANT: McKenzie Sew -On
MEETING DATE/TIME: Thursday, April 7, 20221:30 p.m.
PLACE: Virtual via Zoom
CONTACT PERSON: Andy Limbird 726-3784
Current Planning Staff: ❑L Miller, ❑A Limbird, ❑M Rust, ❑D Larson, ❑M Cadfio
Jeff Paschall, City Engineer, DPW
Kyle Greene, Managing Civil Engineer—DPW
Ken Vogeney, Emergency Manager (DPW)
Clayton McEachem, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
Kristi Krueger, Principal Engineer, Development & Public Works
Michael Liebler, Transportation Planning, Civil Engineer, Development @. Public Works
Gilbert Gordon, Deputy Fire Marshal 2, Fre & Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
Eric Adams, Planning, Willamalane Park and Recreation District
Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
Greg Miller, Springfield Utility Board (Water)
Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
Amy Chinitz, Springfield Utility Board (DWP)
Thomas Jeffreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Willamalane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2planngr@odot.smte.or. us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities &Operations; Springfield Public Schools
Safe Routes to School, Springfield Public Schools
Chris Carpenter, DPW Building Official
Andrew Shearer, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, Centuryl-ink
Tom Boyatt, Community Development Manager, DPW
Jeff Paschall, AIC DPW City Surveyor
Sunny Washburn, Program Coordinator, Environmental Services
Alycia Lenzen-Hammerel, Lane County Transportation (Steve Gallup, cc only)
Tom Boyatt, Interim Development and Public Works Director
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Water Resource Coordinator, ESD
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Niel Laudati, Assistant City Manager
Vahana Keene, Economic Development
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 06/08/2020
DEVELOPMENT ISSUES
MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITYHALL
225 FIFTH STREET
DPI117C,onfffenee Room 615,41
Zoom
Meeting Date: Thursday, ApH17, 2022 1.30-2.30
1. DEVELOPMENT ISSUES MTG #811 -22 -000071 -PRE 811-22-000073-PROJ McKenzie
SewOn
Assessors Map: 17-0334-44 TL 1402
Address: 4430 Franklin Blvd.
Existing Use: retail
Applicant has submitted proposal to occupy existing building with embroidery and screen print
shop
Planner: Andy Limbird
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserriche website: www.soringfeld-or.covtweblink8/browse.asox
VICINITY MAP
811 -22 -000071 -PRE Development Issues Meeting
17-03-34-44 TL 1402
4430 Franklin Blvd.
McKenzie SewOn
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
SPRINGFIELD
w 0
Required Project Information (Applicant:
Prospective
Applicant Name: 'set IJCCY+- 132crr del
complete this section)
Phone: 5-11 � 206- 938 1
company: NlckEnl'ZrE Sew 0 Q I
Fax:
Address: 1566 I—A-x ( 91- EPR(rJcf-'CLD. oR 1*4-
Prospective NEt�-+lam->,rtj
Applicant's Rep.: .:
Phone:I ' Sa S - OS4-'�
Company: Cit1+7'PC-LL Cort -c -yiu 9-E
Fax:
Address: L,tt S -T -x 3ac, ELLELE+sc do -
o -
Pro ert Owner: J&f-t 0 1 tiV'G,ST7-e"7:r (_ LC
Property
Phone:
Company:
Fax:
Address:
ASSESSOR'S MAP NO: 1--- o3 -34- 4L{
TAX LOT NO(S): 6 IL4 0 Z
Property Address: L/4 3 C) B (,J .
Size of Property: `L - SL /1z, 21, "J s f -F_ Acres ❑ Square Feet ❑
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal:
Existing Use:
# of Lots/Parcels: 1
Av . Lot/Parcel Size: 2 .S1 A -..gds
Density: du/acre
Prospective
Applicant: ` '3
Date: 22.
i ure
S Prirl C.Erc �R-�t..,r�
Print
Required Project Information (City Zntake Staff.
2j complete
Case No.: -22� isOODi I' PR -t Date: It �2aZ2 Reviewed b l!i
A lication Fee:
Technical Fee: $O
Postage Fee: $0
TOTAL FEES: $ 6�} 6' tTD
PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
DIM Meeting Questions
• How can we occupy the property without going through the change of use, site plan review, or
any other land use processes?
o Our intention is to occupy the property without changes to the exterior of the building
or site.
o What types of improvements would trigger these or other land use processes?
• How can we occupy the property without needing to annex into the City of Springfield?
o Our intention is to occupy the property without changes to the exterior of the building
or site.
o What improvements or uses would require annexation?
• Are there any known issues with the property that we will need to address upon purchasing the
building or occupancy?
o Please provide feedback from the building department, SUB, planning and the fire
marshall (and any other departments that would have oversight)
•
What specific updates would need to be made if we wanted to come up to current standards on
everything regarding the property?
• Could you please detail what opportunities may be available if the property is within an
enterprise zone, urban renewal district, opportunity zone, or any other special initiatives that
may be of benefit to keeping our business in Springfield?
Warehouse
1355195 1703344401402
GBA: 29700 sqft
YR Built: 1979
01
4430 Franklin Blvd, Eugene, OR
—_—. SE.IMS.E.IMSEC. MTI7S.R3WWM.
�:."°j lane County
17033
SPRINGFlELD
Duncan & Brown
SPRINGFlELD
1]033
Ornlid & Swinney Fire Protection and Security
610 30th Street, Springfield, OR 97478
(0th Street, Fez: Springfield,
, OR
Annual Fire Sprinkler Inspection Report
m wwa
OwnerfProperty Manager: Silva Management Occupant: Big B Tire
Sheet: 4430 Franklin Blvd Phone: 541-229-3203
city & Stale: Eugene, OR Date: 42812020
Owners Section (To be answered by owner or owner's representative)
A Have there been any changes in the occupancy classification, machinery or operations since Rhe last. inspection?
B. Have Men: been any changes or repairs to the fire protection systems since the last inspection?
C. If afire occurred since the last inspection, have all damaged sprinkler system components been replaced?
D. Name of the Owner or Ownets representative answering the above:
Inspector's Section (Ail responses reference current inspection)
Yes NIA No 1. GENERAL
✓ a. Is the building occupied?
V1 I 1b. Are all systems in service?
✓ c. Does Mere appear to be proper clearance between the top of all storage and the sprinkler deflector?
d. In building areas protected by a wat system, does it appear to be heated, including its blind attics
and perimeter areas, where accessible?
✓® e. Have the sprinkler systems been extended to all visible areas of the building?
if not, what areas are not spdnklemd?
✓ f. Does the fire hose on the sprinkler system appear to be in satisfactory condition?
✓ I g. Have fire hoses been tested? DATE: N/A
2. CONTROL VALVES
a. Are sprinkler system main control valves readily visible and in the appropriate open or closed Position?
✓ b. Are all control valves in good condition?
✓ it c. Are all the ocntrol valves locked, sealed or equipped with a tamper switch?
Control Valve Maintenance Table
Controlvaives
No. Type
Open Secured
Closed
Signs
Abnormal Conditions
Cly connection
1 Key
Yes No
No
No
None
Conlrel valves
fork trPive!Yer.
-.
_
Pump oon8d valor
Section =trd valves
System coned valves
1 OS&Y
Yes Yes
No
Yes
None
Othercontrdvalves
3A. TANKS AND PUMPS
✓ a. Do fire pumps, gravity, surface or pressure tanks appear to be in good external condition?
.11 b. Does it appear that gravity, surface and pressure tanks are at the proper pressure and/or water levels?
319, FIRE DEPARTMENT CONNECTION AND CHECK VALVES
✓� a. It appears that the fire department connections are in satisfactory condition, couplings free, ups or plugs
in place and check valves tight?
b. Are fire department connections visible and accessible?
✓I c. Is Mere a current record of a 5 year check valve inspection on the fire department
connection? DATE: 2019
✓® d. Is the fire department connection check valve accessible?
Page 1 of 3
Yes WA No 4A. WET SYSTEMS
✓ a. Are confrol valves in the appropriate open or dosed position?
✓ b. Is there a curtant record of a 5 year internal investigation and alarm check inspection? DATE: 2016
J c. Was a water flow test of main drain made at the sprinkler riser?
d. No. of systems: 1 Make & model: 4 -Star alarm valve with water motor gong
No. of systems: Make & model:
Wet System/Water Flow Test
Test Pipe
Test Pipe
size
Static Psi
Before
Flow
Pressure
Sialic Psi
After
Flow Switch
Timing
Riser
2.
94
60
70
WMG
OOD
PSI PSI PSI
Outlet
4B. ANTI -FREEZE SYSTEM
®✓ a. Have all known and readily apparent anti -freeze systems been tested?
K Date anti -freeze systems were tested. DATE: N/A
Anti -freeze Test
Anfimfireete Type Freeze Point Anti -Freeze Loop Location
S. DRY SYSTEMS (SEE ITEMS 13 TO 16)
✓ a. Is the dry valve in service?
✓ b. Do dry valves appear to be protected from freezing?
✓ c. When was the system piping last ck'd for blockage, corrosion, or foreign materials? DATE: WA
d. Were readily accessible and visible low points drained during this inspection?
✓ e. Did quick -opening devices operate satisfactorily? DATE: N/A
✓
I. Date dry -pipe valve trip tested - control valve partially open: DATE: WA
✓ g. Date dry -pipe valve trip tested - control valve fully open: DATE: N/A
✓ h. Did the heating equipment in the dry -pipe valve room operate at the time of inspection?
✓ 1. Did dry valve trip property?
✓ j. If supplying freezer, has ice plug check been performed? DATE: WA
Dry Systems No. of systems: Make & model:
No. of systems: _ Make & madel:
Dry System Trip Test
Make Modelme to Trip
WaterAlr np
Time arm
Make Thm Test
ressure Preswre Point
Water Operated
Pipe
Test
Reached
WithMlithcut
Pressure
Proper
OOD
PSI PSI PSI
Outlet
6. SPECIAL SYSTEMS
�✓ a. Did the deluge or pre -action valves operate property during testing? DATE: WA
7. ALARMS
✓ a. Did ureter motor(s) and gong(s) operate during testing?
✓ b. Did electric alarm(s) operate during testing?
✓ c. Did supervisory alarm service test satisfactorily?
✓ d. Does the system have more than 20 heads?
✓ e. Is the system monitored? By: Outside Bell Only
Page 2 M 3
Yes NIA No S. SPRINKLERS
✓ a. Do sprinklers appear to be free of corrosion or loading and visible obstructions?
✓ b. Are extra sprinklers available on the premises?
✓ c. Does the exterior condition of the fire spinkler system appear to be satisfactory?
✓ d. Have dry sprinklers older than 10 years been tested? DATE: N/A
✓ e. Have quick response sprinkler older than 20 years been tested? DATE: N/A
✓ f. Have sprinkler older than 50 years been tested: DATE: 1970
✓ g. Have high temp heads 325° and above been checked: DATE: WA
9. GAUGES
✓�a. Have gauges been tested or changed in the last 5 years? DATE: 2016
10. FIRE HYDRANTS
✓�a. Have hydrants been flow tested and inspected? DATE: N/A
11. STANDPIPE
F-77F]a. Has otandpipe been inspected and tested in the last 5 years? DATE: N/A
12. FORWARD FLOW
®J a. Has forward flow test be done? DATE: No record
Static Residual GPM
13. Explain arty "No" answers and comments:
None
14. Adjustments or corrections made during the inspection:
15. Although these comments are not the result of an engineering review, the following
desirable improvements are recommended:
16. SYSTEM DESIGN
a. Is there a backflow device on the water supply pipe? No
Brand and Model: N/A
b. Is there a system design nameplate permanently attached to the riser? Yes
c. Hydraulic calculation information:
17 heads /.1912000 / 41.201490
Signature of Inspector. E6411 A&IJ Data: 4.28-20
Page 3 of 3
AUTOMATIC PRESS
/I
HEATPRESS
FRONT OFFICE/
RECEPTION
MANUAL
PRESS
GAS DRYER
AUTOMATIC PRESS
i
PRINT STAGING
Dark Room/Bathrooms
RECEIVINGIPARTIALS
TAGGING STORAGE
SPECIAL FINISHING
FULFILLMENT PROCESSINGISHIPPING/SHIPPING SUPPLY STORAGE
EMB STAGING
6
12 SY TRIMMING/
OC
EPATCHESI
EAOI FULFILLMENT STORAGE
LIES 6
RECEIVING I
SHIPPING
Misc Storage