Loading...
HomeMy WebLinkAboutApplication APPLICANT 3/9/2022380 Q Street, Ste 200 4Lftl� Springfield, Oregon 97477 (541)302-9790 kylemorris@ao-engr.com A Et Stormwater Report project Thurston Estates r-ocauon 7399 Thurston Road, Springfield, OR Pmparea Br. Kyle Morris, PE _ Reviewed by: Scott Morris, PE Kyle Moms, PE°w� Dato 111212022 Type dproiact: Residential Subdivision F f Iras Project Overview The applicant is proposing to construct a 10 -lot single family residential subdivision south of Thurston Road on an approximate 2 -acre parcel. The subdivision will consist of publicly owned infrastructure including roadways, utilities and stomnwater infrastructure. To accommodate stomiwater runoff it is proposed to construct two stormwater ponds within publicly dedicated tracts to receive and process runoff from the new rights-of-way and impervious surfaces on each lot. The primary outlet for these ponds will be infiltration. The existing roadside ditch on the south side of Thurston Road will act as an emergency overflow for both ponds should a flood level storm event occur. Existing Conditions The existing site currently has some structures but mostly consists of grass cover and some scattered trees. The structures present are a single-family residence, a garage and some small sheds. The existing home and shed present on the future lot 1 is proposed to remain, other structures currently on- site are proposed to be removed. Web Soil Survey classifies on-site soils as Chapman -Urban Land Complex with a Hydrologic Soil Group rating of B. Per LIDAR elevation data the site has a very slight slope directed to the north towards Thurston Road. It is assumed existing runoff from the site sheet flows to the north during large storm events. Springfield requires post -construction peak flowrates be equal to or less than pre -construction peak flowrates. To analyze the pre -construction peak flowrate from the site the following data will be utilized: Land Type;Description: Grassland with HSG rating of B Curve Number: 79 In addition to the on-site existing conditions flow, the adjacent property to the south slopes towards the north. This creates the potential during large stone events for stormwaterflow off-site to flow across the subject property following the historic drainage pattern. Using Google Earth the contributing area of potential flow across the subject property was estimated to be 5.6 acres with a curve number of 79. To be conservative in design this flow was assumed to be routed into the proposed stonmwater system for the subject property. Full details for this offsite flow can be found in the HydroCAD report attached in the appendix. Infiltration Infiltration testing was performed by Branch Engineering on July 15" 2021 and a geotechnical report was prepared on July 16N 2021 which includes the details of the testing and the results. The rate measured during the testing was 16.5 inflow. To meet the 2014 Eugene Stommater Management Manual requirements a design infiltration rate of 6 inlhour for native soils will be utilized which provides a safety factor of 2.75 when compared with the measured rate. Since this test was performed during the summer, another infiltration test should be performed during the wet weather months (December, January or February) to verify the infiltration rate and check the groundwater depth. Branch Engineering's report is included with the appendix of this report. To be consistent with the requirements outlined in the 2014 Eugene Stomnwater Management Manual, a design infiltration rate of 2.5 in/hourwill be utilized for infiltration through imported soil growing mediums such as is proposed in the pond. Proposed Destination The primary destination for stormwater runoff will be infiliration during more normal stone events. For larger storm events the existing roadside ditch on the south side of Thurston Road will be utilized as an escape route. An emergency overflow from Pond B is proposed to allow stonmwater to flow over the new sidewalk in Thurston Road which then flows into the existing roadside ditch. Since Pond A and Pond B are connected via piping this overflow will serve Pond A as well. This existing ditch generally flows to the east to a natural drainage way approximately 400 feet away from the site. This drainage way flows under Thurston Road by culvert and eventually drains into South Cedar Creek. The City of Springfield basin map shows the entire site is to drain to the north as proposed. Post construction It is proposed to construct two publicly owned and maintained stonnwater ponds within tracts as shown on the plan. The ponds would collect stornwater runoff from the new impervious rights-of-way on the site and the impervious surfaces on lots including roofs. The impervious surface of each lot was assumed to be 2,640 SF per the City of Springfield EDSP section 4.11. In the table below physical characteristics of the proposed pond are summarized: • Page 2 Table 1: Pond Physical Characteristics The ponds vAll have 12" thick growing mediums and 12" thick rock chambers. The growing medium is proposed under the entire facility. Each pond also is proposed to have a landscape block retaining wall around the upper 2.5 feet providing more storage volume. The total storage area the proposed pond provides is summarized in the table below in units of cubic feet: Table 2: Total Pond Storage Open Bottom Depth Side Top Facility Area [SF] [FT] Slopes Area (35% Voids) Storage Tract A Pond 4,086 [H:V] [SF] Water Quality Tract B Pond 5,978 77 191 6,246 Detention Pond Tract 307 4 3:1 1,097 A Water Quality Detention Pond Tract 545 4 3:1 1,568 B The ponds vAll have 12" thick growing mediums and 12" thick rock chambers. The growing medium is proposed under the entire facility. Each pond also is proposed to have a landscape block retaining wall around the upper 2.5 feet providing more storage volume. The total storage area the proposed pond provides is summarized in the table below in units of cubic feet: Table 2: Total Pond Storage Open Growing Area: 1.99 acres Facility Storage Medium (10% Rock Chamber Total (100% Voids) Voids) (35% Voids) Storage Tract A Pond 4,086 47 232 4,365 Tract B Pond 5,978 77 191 6,246 Hydraulic Calculations HydroCAD software was utilized to perform all hydraulic calculations. Below are parameters utilized in calculating the existing conditions peak flowrates leaving the site from the development area: Runoff Method: Santa Barbara Urban Hydrograph (SBUH) Area: 1.99 acres Curve Number. 98 Unconnected roofs 98 Impervious ROW Time of Concentration: 61.9 minutes (Details for this included with HydroCAD node report) Storm Type: Type IA 24 -hr Storm Events: Water Quality -0.83 inches 2 -Year Storm — 3.30 inches 25 -Year Storm — 4.80 inches To show detention requirements are met, both pre -construction and post -construction peak gowrates leaving the site were calculated without the Offsite Flow included. Those values are summarized in the table below 0 Page 3 Table 3: Peak Fbwrates Summery Storm Existing Conditions Post Construction Event Peak Flowrate [cis] Peak Flowrate [cis] 2-Year0.29 0.00 T5Year 0.63 0.00 As shown above, detention requirements are met as the majority of stormwater runoff is proposed to infiltrate within the ponds. Along with peak flowrates, hydraulic grade lines were analyzed to ensure no flooding occurs within the subdivision. Below is a table summarizing the pond elevations and outflow structure elevations. Table 4. Pond Elevations fall numbers in units of Feet) Facility Pond FL. Overflow Pond Top Pond TractA 522.40 526.50 526.90 Pond Trac[ B 522.40 526.50 526.90 The overflow from Pond Tract A will be routed into Pond Tract B for further storage to allow for infiltration. The overflow from Pond Tract B is a small overflow weir with a rock channel directed towards the new sidewalk in Thurston Road as discussed in the Proposed Destination section of the report above. Below is a table summarizing the calculated HGLs within the pond in comparison to the above pond elevations: Table 5: Calcurated Pond HGLs Facility Water 2 -Year 25 -Year Pond Quality Top Pond Tract 522.55 526.61 526.86 526.90 Pond Tract B 520.40 526.60 526.77 526.90 As shown in the above table, all stormwater is contained within the ponds during the design 2 -year storm event. During the 25 -year flood event stormwater is allowed to surcharge into the roadway by approximately 3 inches for a short time -period and thus meets City of Springfield standards. The above HGL's assume the full calculated inflow from the adjacent property to the south flows into the ponds during each modeled storm event. Pollution Control As discussed, infiltration is proposed as the primary outflow during normal storm events. For the impervious roadways and lot surfaces stormwater runoff wilt be routed through the proposed water quality detention ponds. This pond will be vegetated to meet City of Springfield requirements. As shown in the tables above all stormwater is infiltrated during the Water Quality storm event as the peak HGL is below the overflow elevations. 0 Page 4 Conclusion The proposed stonnwater system will meet City of Springfield requirements. Detention requirements will be met and pollution control also knit be provided with the proposed infiltration and vegetation within the pond. During large stone events stormwater will be allowed to flowthrough the emergency overflow towards Thurston Road and not cause damage to habitable structures. The proposed system as modeled will not pose any public safety or health risks. Appendix • HydroCAD Report • Branch Engineering Site infiltration Test Results • Stomrwater Scoping Sheet 0 page 5