HomeMy WebLinkAboutApplication APPLICANT 3/9/2022City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
6 ILo
IL
Required Project Information (Applicant: complete this section)
At Carver 1Phone: 503-545-4121
Com an : Carver Family,LLC iFax•
Address: 112 Timson Drive, Folsom, CA 95630
Prospective
Applicant's Rep.: Andrew Strout
Phone: $41-746-0637
Com n : Branch Engineering, Inc.
Fax,
Address: 310 5th Street, Springfield, OR 97477 AoolzEw S P 9RAk)C9£AAmr,t)£E tt ING. LO
PropertV Owner: Scott Carver
Phone: 503-5454121
Com an : Carver Family, LLC
Fax'
Address: 112 Timson Drive. Folsom, CA 95630
ASSESSOR'S MAP NO: 17-02-30-43
ITAX LOT NOS : 6401
Property Address: 3654 Kathryn Avenue. Springfield, OR 97478
Size of Property: 3.13 Acres JZ Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: expansion of existing industrial development
Existing Use: Industrial
* of Lots/Parcels: 1
Av . Lot/Parcel Size: 3.13 acres Density: WA du/acre
Prospective
Applicant:A,10 Date:
1 ature - lN�'7�
Print
Required Project Information (City Intake Staff., complete this section)
Case No.: 7-Z--O00063-PRE Date: 19C&L q ZdZZ Reviewed by: uJ
Application Fee: 6 { �,_\O()
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: 64L, R) I PR03ECT NUMBER - - U
Revised 5/21/13 KL 1 of 3
Development Issues Meeting Process
The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss
his/her development proposal with the development review staff of the City. The discussion can
be general or specific, depending on the details provided with the application. A Development
Issues Meeting provides information to an applicant related to the current development
conditions and standards of the City. The Development Issues Meeting is not a land use decision
and does not confer any development rights, establish any conditions, or bind the applicant or
the. City to any course of action. The meeting conveys the status of known development
opportunities and constraints. The status may change over time as development conditions or
standards change.
1. Applicant Submits a Development Issues Meeting Application
• The application must conform to the Development Issues Meeting Submittal
Requirements Checklist on page 3 of this application packet.
• Development issues meetings are conducted every Thursday.
• We strive to conduct the development issues meetings within three to four weeks of
receiving the application.
• The applicant's proposal is circulated to the relevant staff in preparation for the
meeting.
2. Applicant and the City Conduct the Development Issues Meeting
• The applicant and any design team should attend the development issues meeting.
• The meeting is scheduled for one hour.
• Staff attending the meeting will be prepared to discuss the issues raised in the
submittal by the applicant. Other issues raised during the meeting may also be
discussed.
• The meeting is informal and the City will issue no staff report.
Revised 5/21/13 KL 2 of 3
Development Issues Meeting Submittal Requirements Checklist
II Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
V1 Development Issues Meeting Application Form
'V Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question may be fully evaluated, the list is limited to five
questions.
Four (4) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged to include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions &
Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review
Submittal Requirements.
yJ Drawn in ink on quality paper no smaller than 11" x 17"
scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100'
Irl North arrow -
'Z Date of preparation
{V Street address and assessor's map and tax lot number
Dimensions (in feet) and size (either square feet or acres) of the development area
Location and size of existing and proposed utilities, including connection points
On-site drainage collection system and flow patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
N/A ❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMS Related to Land Divisions
N/A ❑ Approximate location, number and dimensions of proposed lots
N/A ❑ How streets in the proposal area connect with existing streets
DIMs Related to Site Plan Review
'V Proposed and existing buildings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
'1 Parking and circulation plan
Revised 5/21/13 KL 3 of 3
(Branch
ElIG I N E E R IN G_
sraewn
March 8, 2022
DIM QUESTIONS
3645 KATHRYN AVENUE
Branch Engineering Inc. Project No. 21-749
The site is located at 3654 Kathryn Avenue (TM 17-02-30-43, TI. 6401). The
property configuration in this application reflects a Property Line Adjustment that has
yet to be submitted. The site lies within the Heavy Industrial zone. The existing
improvements were part of a Site Plan Review in 2008. The applicant is proposing to
expand the improvements westward to include a new 100' x 270' building and
approximately 28,000 square feet of additional impervious area for parking and
circulation. The building will be divided into up to five tenant spaces. The intention is
to market the spaces to tenants in the warehouse, wholesale and/or distribution
markets. Each tenant will have space for two loading docks capable of accommodating
53 -foot trailers (72 -foot trucks). Each tenant will also have 650 square feet of office space
and be configured to allow 24 -foot delivery trucks to pull through the building and exit
on the opposite side. Included with this application is a proposed development plan.
The questions below are to help guide the project design.
1. Regarding public infrastructure:
a. As part of this application, will any public improvements be required along
Kathryn Avenue?
b. According to the Stormwater Basin Master Plan, the basin the site is located
in (9_265) has no capacity issues. Besides treatment of non -roof
impervious area, are there any stormwater requirements that we should be
aware or
2. Regarding the impervious areas:
a. Since the new impervious area totals 63,000 square feet (27,000 square
foot building plus 36,000 square feet of paving), please confirm this
project will require a Site Plan Review application rather than an MDS.
b. The existing impervious area does not appear to be receiving treatment
and it appears difficult to convey the runoff through the new construction
without it entering a new treatment system. Please confirm that it is
acceptable to not treat portions of the water from the new impervious area
provided that an equal or greater area of existing impervious area gains
treatment.
EUGENE -SPRINGFIELD ALBANY
310 5'h Street, Springfield, OR 97477 1 p: 541.746.0637 1 �.branchengineering.cam
DIM Questions
March 8, 2022
3. Vehicular circulation:
a. Does the city have any design concerns regarding the pull through aspect
of the building design?
b. Does the city have any design concerns regarding the number of access
driveways?
4. Fire Service:
a. It is our understanding that a turnaround will not be necessary since one
full side of the new structure can be serviced by pulling in the middle
driveway and looping through to exit by the eastern driveway. Does the
fire department agree that a turnaround is not necessary?
b. Two hydrants are currently available to the site. Is this sufficient for fire
standards?
5. Are there any red flags that the city sees with this plan that weren't addressed as
part of the questions above?
Any other information items that staff feel would be beneficial to the development
would be greatly appreciated.
Branch Engineering, Inc.
Page 2 of 2