HomeMy WebLinkAboutPermit Signage 1993-09-01TAX LOT:
SIGN PERMIT APPLICATIOI
225 Filth Street
Springlield, OR 97 477
SITE ADDRESS
ASSESSORS MAP:
OWNER
SP'lINGFIELrl JOB I
Zfr,
lnspection Line: 726-3769
Office: 726-3759
PHONE:Gr>.f -qrlEt
ADDBESS
?1 q>o
CITY STATE:
BUSINESS NAME, FIRM ETC Fr
DEscRtpTloN oF pnoposED slcN(S): (please check and complete all appropriate informationl
a d,Square Footage:
Vertical Dimension of sign or enclosure:K,d,
_ Prolecting
_ Billboard
Electrical lnstallation: _- Yes X f'lo
(lf yes additional electrical permit is required)
-
Roof
-
Marquee
Other.'t-
Total Height above Grade:g'3"
Horizontal Width of sign or enclosure:4e it
q .SO
* Wall
_ Single Face
Dimension from Grade
to bottom of Sign Enclosure
JCx Freestanding
Double Face
O VALUE
OF SIGN
Acorrl.Material Sign is constructed of:
ALL existing signage and attach a photograph of each sign:
Sssn^4o//3 3e9
Type
Sq. Ftg.
Sq. Ftg.
CONTRACTOB/IN STALLER:?arfcE S+S . erga/s t rrtC . PHoNE: Sil.Blt?6( ?
(b) Type
(d) Type
Sq. Ftg.
Sq. Ftg.
ADDRESS
CITY:STATE:oRe.ZI?:
EXPIRES
q>voq
CONSTRUCTION CONTRACTORS REGISTRATION NUMBER:q
CITY BUSINESS LICENSE NUMBEB ?30
OFFICE USE
CQ
Sign Di
Zoning:
Sign Permit Fee:
BEOUIRED INSPECTIONS:
X t,,"
to be made prior
to sign placement
prior to placement
of concrete
Land Use:
Code Se
Approved By
Attachment
after lasteners are
installed/prior to cover
Ouad Area:
Electrical
prior to energtzlng
electrical installation
V rinrr
cdmUetion of sign
installation
DATE:
Additional Comments and/or Conditions
By signature, I state and agree, that I have carefully examined the completed application and do hereby certily that all information herein
is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City ol
springfield, and the Laws ol the state of oregon pertaining to the work described herein. I further certify that only contractors and
employees who aie in compliance with ORS 701.O55 will be used on this proiect'
I lurther agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that
the permit card is located at the f ront ol the property, and the approved set of plans will remain on the site at all times during the installation
of the sign(s)
Signature
Amount Received:'{o aa Date Paid
(o G
Validation
Receipt Number:Received By
zlP;
I
I
I
.l
SIGN PERMIT APPLICATION
The application on the reverse side needs to be completed entirely. lf you are the sign contractor/installer' or iI you are
hiring a contractor, you need to make sure that uotn ine city of Springfield Business License Number and the Registration
Number from the State of oregon Construction Contractors Board aie listed on the application along with the expiration
date of each.
lf the sign you are proposing to install is illuminated, an electrical permit application also needs to be completed and signed
by eithcr a supervising eleJtrician, limited sign electrical contractor, or if you are the busir.ress owner who also owns the
building in which you are occupying, and you will be performing the electrical installation yourself, you may sign the
electrical aPPlication.
lf there are existing wall and/or lreestanding signs, a photograph(s) ot each existing sign needs to bo attached to the
application. The size of each existing slgn aiso-needs to be listed on the application'
PLANS
To submit for a sign permit, you need to prepare two complete sets of drawings showing all dimensions' total height' and
a plot plan indicating where ihe proposed sign will be located. lI you are instilllng a freestancling sign which exceeds 20
leet in total height, the footing detail needs to be prepared and stamped by a registered enginecr or architect' Af ter the
plan review process is completed, and, if your sign(s) is approved, one set of plans will be returned to you' The approved
let of Orawings need to be at the site when an inspection is requested for the inspectors ref erence'
INSPECTION
Depending on your sign(s), you may be required to request one or all of the following inspections during the installation
To be requested after indicating on the lot where the proposed sign will bc located but prior to anY work
being performed for the install;tion of the sign. This inspection is requircd il there is a question on the
location of the ProPosed sign.
Footing: To be requested after excavation and the forms are installed, but prior to pouring concrete' lf there will be
electrical conduit placed in the footing, it must also be in place prior to requesting this inspection'
Attachment: To be requested when all fasteners are installed but prior to cover'
Electrical: To be requested after the electrical connection to the sign is made, but prior to energizing'
Final: After all required inspections are conducted and approved and the sign installation is complete'
The inspections that are required lor your sign installation will be indicated on the application during the 'plan review
process. Failure to request ANy of the requirei inspections could result in sign removal in order to inspect the sign at the
ol your sign
Site:
required intervals oI work.
To request an inspection, phone 7 26-g7 69. This is a 24 hour recording' on the recording you will need to leave your city
Designated Job Numuer, tlcation of where tne sign is being installed, ir,o typ" of inspection you are requesting' and when
you will be ready for the inspection. All inspectlons called in to the recorder prior to 7:OO a'm' will be made the same '
working day, all inspections phoned in alter 7:00 a.m. will be made the following work day'
lf you have any questions regarding the application, required plans or inspections' please leel free to phone the Building
Salety Division at 726-3759.
City of Springfield
Building SafctY Division
225 Fifth Strect
Springfield, OR 97477