Loading...
HomeMy WebLinkAboutPermit Mechanical 1994-03-07QloJ)P l-l o3 3re'l BLOCK: 7f-//\) O LOCATION OF PROPOSED WORK: SUBDIVISION TAX LOT JOB NUMBER ASSESSORS MAP: LOT: RESIDENTIAL PERMIT APPLICATION f nspections: 726-3769 Office: 726-3759 225 Fifth Street Spri ngfield, Oregon 97 477 PHON E: l lr+v __cq ZIP:v J STATE: Oa^'^, Sa,-lr,rnorosw Aon' ,v-to,N,t ,l c.ICITY: ADDRESS: OWNER: NEW - REMODEL ADDITION DEMOLISH OTHEH DESCRIBE WORK: ELECTRICAL: ADDRESS EXPI RES PHONE 1 CONTRACTOR'S NAME MECHANICAL: CONST. CONTRACTOFI # GENERAL: PLUMBING * OF BDRMS: - OFFICE USE - LAND USE: WATER HEATER ZONING CODE:* OF UNITS: QUAD AREA: * OF BLDGST SECONDARY HEAT: SQUARE FOOTAGE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOUBCE: To request an inspection, you must call 726-3769. This ls a24hour recording. All inspections requested before 7:00 a.m. will be made the same working day, lnspectlons requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS f-l Temporary Electrlc Rough Mechanlcal - Prlor to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrlcal - Prior to Final Electrical - When all electrlcal work is complete.cover. Underslab Plumbing/ Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Flreplace - Prlor to faclng materlals and framlng lnsp. Final Building - When all required inspections have been approved and building is ' completed.Masonry - Steel location, bond beams, grouting.Framing - Prlor to cover.Ao^^ 4,.,g-OtherFoundation - After forms are erected but prior to concrete placement.Wall/Celling lnsulatlon - Prlor to cover. Underground Plumbing - Prior to filling trench.l--l Drywall - Prlor to taping MOBILE HOME INSPECTIONS Underlloor Plumblng/ Mechanical - Prior to lnsulation or decking.Wood Stove - After lnstallation Post and Beam - Prior to floor insulation or decklng.lnsert - After fireplace approval and lnstallation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulalion - Prlor to decki ng.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to water.and sewer. Sanitary Sewer - Prior to filling trench.Eleclrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to fllling trench. Sldewalk & Driveway - After excavation ls complete, forms and sub-base material in place. Water Line - Prlor to filling trench. FencE - When completed. Rough Plumbing - Prior to cover. Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. 3qr: '/-,, 141- te a Q'l r+-)-) Hn, n 1L :,.-,()_il, n u FLOOD PLAIN: RANGE: E E tf E E E E tl E E E n tl tl Lot faces Lot sq. ftg. Lot coverage TopograPhY Total height Lot Type v - lnterior - Corner - Panhandle - Cul-de-sac Se --d THE PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: P.L.HSE GAR ACC N S E BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Reviewed By Date Receipt Numbe Plan Check Fee: Date Paid: Received By: BUILDING PERMIT.' ITEM SO. FT. X $/SQ. FT.VALUE (A) Total Value Building Permit Fee State Surcharge Total Fee Main Garage Carport Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. SYSTEMS DEVELOPMENT CHARGE (SDC) (B) ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (c) N0 FT. FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/Fireplace Unit Dryer Vent l5 oo IO. OO "ls (D)a<'-?S: NoVent Fan Mechanlcal Permit lssuance State Surcharge Total Permit MECHANICAL PERMIT Furnace Exhaust Hood By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are ln compllance with ORS 701.055 will be used on this project, I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain at ali times duri ng construction.on the Signatu Date MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut - ft Demolition State Surcharge Total Miscellaneous Permits (E) TOTAL AMOUNT DUE (exctuding etectricat) eS ,? S (A, B, C, O and E Combined) 3)-r lq.t na <""rDATE PAID AMOUNT RECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER