HomeMy WebLinkAboutPermit Mechanical 1984-10-24r
!
ru/a,1w N
Date:
Constmtetiotl Lender
.. REslE,_ 'lTlAL..
. APPLICATIOfr/PERTLIT
225 North Sth Street
Springfield, )regon 97477
Building Di,uision
726-37 53
SPEINGFTELD
Tca Iot #
Job Loeaticn:
Aesessoz,s Map #
svbdiuision:
I b.
Pl",one:Addtess
)umer:
'7
7//
Date of
llork:x Ned 0*/'1
t-t
CJ Value s?s: ot
Additicn
RemoCel
Lisc. ICont?actoIF - t- Addzess .n
' ce,,etol(!r744,*{.Vfi4 . /dr,*.{ (J*n /- )Nq{ /{fi; .5,"/l,l [fr -/
Page 1 of 2
It ie the responsibility of tle peririt holden to aee that aLL inspectiotts ate nade at the prope! tine, that eaeh address is t,eaC,b'te
fiorn*Bui the sttee
lding D,)ui
uou
be made the sane day, requests mcde
t, and that the
sion appro"*ed p
at the front
'LdLng SLte
of _p"ope?tAL tlm€s.
the
ata
r yout, Citg desigrnted job nwnbet,, job aCdtess, type of inspeczi-cn
or Oumers nane cnd p?nne ntonbe.z,. P.equests receited befcre 7:00 an
on vLLL be nla.de the neat aorking day.
stateALL 726-3769
r
e.ccauation, but pt"tor tc set up of
fomne.
UNDERSLAB PLUMBING, ELECTRICAL &
MEC\{4-\|ICAL: To be made before any
uork is cotset,ed.
PO)TING & F)UNDATICN: ?o be nta.Ce
@A tz,encnes a"e escaated and
fonns ote erected, but prior topotrtng ccncreta.
UNDERGPAUND PLUMBING. SEWER, W.ATER,
DRAillAGE: To be made y,iot, to fil-lirq trenches.
AIIDERFLOOR PLUI,ETNG & MECIIANTCAL:
Io be made prior to installation of
fLoor insulation or decking.
POST ANP BEAI4: To be made priot, toffiiiTTffi}ilof floor insuT;tion o1,
decking.
ROUGH PLANBII'IG. ELECTRTCAL & MECH:
ANICAL: No uotk is to be cotset:ed
-.-
w:tiL these inspections haue been
nad.e and. approoeC.
EIPEPITACE: Pztioz, to plaeirq facingma.terials and before froning inspeb-
ti,on.
FRALIfNG: l,tust be requested after
approual of rough plwr;bing, electri-cal & mec?nnical. ALL roofing
braclng & chinmeys, etc. rntst be
. contpleted. llo ucrk is to be eon-
. cealed until this inspection lne'been made anC approoed.
SITE INSPEC?I)N: ?o be aftez,
FIIIAL PLUUAING
FTNAL MECHANTCAL
FINAL ELECTRICAL
your CitA Desigzated Job Nutnber fs:
INSULATTON/VAPOR BARRTER IIISPECTTON
To be made after aLL insulaticn and.
required oapor baviers @e in pl,ace
but before any Lath, Wpslln bcard oy
unLL couerdng is applied, ard. before
oty insulation is concealed.
DRYWALL INSPECTT)N: Tc be made
aftet, aLL dtyuall is in place,
but prior to anA taping.
MASONRY: Steel Loeation, bond
beans, grouting or oerticals in
accotdorce tith U,B.C. Section
2415.
OR !,IOWD BUTLDI\ICS
Sanitarg seuer capped et Wope?Lr- Lire
Septic tank p"tnped and filled tri,th gz,a:;eL
linal - h4ten abcue itens ote ectnoleted
and uhen dqnolition is complete Zr stuue-
tu.ye maued and. prenrLses cleaneC up.
Hcmes
Bloeking and, Set-up
Plunbing connectians -- sa)e? od uateyW
C!88_4 4ry!449!_APW: After fonnsd,e erect;AffiVfiA tu pourtits
concrete.
SIDE\IALK & DRf',EWAI: Por aLL con-
After installation is
crete paoing uithin street right-
of-ucy, to be maCe after aLL e*ea-
oating cornpLete & forn tsotk & sub-
base mater.ial in place.
Electrical Conneetion - BloekLng, set-up
and plutnbing connecti.ons nr*st be apprc"-ed
before requesting eLeclrical inspectiott
Accessory Buildnrq
FiruL - After
etc. ote coitp
' pcrches, skdnting, deeks,
Leted.
ALL project conditions, such as the i.nstallation of street trees, conoletion of therequired T.andscaping, etc.' tmtst be satisfied before the BUILDLN? FII\AL ean be z,equested.
?INAL BUTLDLNG: The ?inal Buildirry fnspection rnust be requested after the Final PlwnbingElectrical, qd Meehanical Inspections hque been nade and-appnoueC
*ALL I4ANHILES AND :LEANIUTS uusr BE A11ESSTBLE, ADJUSTIIENy ro BE I,LADE A? No clsr ?o cny
| (v /
l
tr
VENCE: h4ten conplete -- ProoiCe
gates or nouable sectians through J_lP.u.E. I I
Lot Faces -Energlt Sout cbs TVoe
Ileatpr.House Cayaqe Access.Water lleatet,NoPth
tost FirepLace
South l,loodstoxe
7 cJOB NO.SOLAR AACESS REQ.-L-CO
becroonsL
Topographg
Panhand.Le
CUL-de-sac
Lot Sq. Ftg
% of Lct Cooetage_
# of Stories
Total Height
LCT TT?E
_ fnterior
Corner
West
-- Fees --
This pennr.t is granted on the enp?ess condition tltat the said eonettuction
sLnLL, in all nespects, eonform to the Crdinance adopted fuiy the City ofSptingfield, including the Zoning Cldinance, negalatittg the ccnsttucticn
and use of buildin4s, attd may be suspend.ed or reuokeC at cnA time upon oic-
Lation of dtA prcuisions of said 1rdir,ances.
TOTAL VALUE
ruEM tlu Value
j+
*
Building Volue & Permit
S.D.C. 1.5 c
Building PennLt
?otal Changes
State
Signed:
Reeeipt #:
Plumbing Perrnit
N9 person sln|L construct, instal?., alter or cTnnge anA nea cz, eristing
plutnbin4 or drainage syste,-n in uhole or in patt, unless sueh person is the
Legal possessoz, of a oalid plwnber's License, eceept tlnt a pe?son mag do
plwnbing uork to prope?tA uhich is oumed, Leased or operated bg the appli.-
cant.
N0.FEE CEARGE
*
Fictt*es
Resi.d.ential (1 bath)
Saner
Plunbing Perrrit
State Swchange
Electricql Permit
Were State Las nequires that the electrical uork be done by an Electz,ieal
Contractot,, the electtical portion of this permit sltall not be oalid until
the Label lns been signed by the Electrical Conttactor.
bhanet Hood
u
NC.FgE L}lMAL
I
*
Mechqnicol Permit
Na,t,/Extend Circuits
Ser"uice
State
?otaL
Vent Fat
llcodstoise
PermLt rsauffiee
Meclnnical Perrrit
-- ENCROACHMENT --
SecarLtg Depqsit
Stotage
llaintenance
Permit
C'uz,bcat
Sida,salk
lenee
Electrical Label
Mobile Home
TotaL *
Plart Eroniner uate
I HAW CAREFULLI EXAI4INED the cornpleted application for penit, and do
herebg cettifg that aLL infornation hereon is ttue and correct, cmC f
furtket' cettifg that any ard aLL uork perforned elnll be done in accoy-
dance rrtth the Oydinances of the City of Springfield, and the La;s of the
State of )tegon pertaining to tke uotk Cescribed herein, and tlnt N0 )CCU-
PANCY UnLLL be mad.e of any structure uithout perrnission of the Building Di-uision. I further eet'tifg thet only eontractot,s and etnplcgees uho are in
eanpliance uith 1RS 70L.055 uiLL be used on this project
TO?AL AMOUN? DUE: */-r., bo Signed
x
t4ain
fuace
eo?nort
Aceessoru