LOCATION OF PROPOSED WORK:
ASSESSOBS MAP:TAX LOT:2€4
€2q.>>ZIP2BSTATE:
PHON E:?q2 >a
CITY:
ADDRESS:
OWNER:
DESCRIPTION OF WORK;
NEW-- REMODEL VALUE:DADDITION LISH
-
OTHEB
MECHANICAL:
PHON EADDRESSr',s/2@e.a)@c42
EXPI RES PHONEADDRESSCONTRACTOB'S NAME
ARCHITECT:
ELECTRICAL:
CONST,
CONTRACTOR #
\ GENERAL'
PLUMBING
NO.FEE CHARG E
Single Fixture
Relocated Bldg
(new fix. addtl)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backflow Device
TOTAL PEBMIT
MECHANICAL
NO trtrtr CHA RG F
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
f rom AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
OCCY GROUP:
I OF STORIES:
QUAD AREA:
S OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
SQ, FT.$/SQ. FT.VALUE
EA%TOTAL VALUE OF PROJE
x
X
X
SQ. FTG MAIN
SO, FTG ACCESS
SQ. FTG OTHER
29a7 RCPT#PLAN CHECK FEE DATE BY
6.6<
BUILDING PERMIT 79.>a PLU M BI NG DEI\,4OLITION
5% State
Su rch aro e n .t'72 5% State
Surcharge
MECHANICAL FENCE
VALUE $
5% State
Surcharqe I SIDEWALK
FT.
SUBTOTAL
PERM ITS //-97
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PEHMIT FEES
EXCLUDING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your clty designated job number, job address, type of inspection requested and when you will .be readyforinspection Requestsreceivedbefore7:00a.m.wilbemadethesameworkingday,reqresi;;;;;;;;;;;,;'".-.wi,bemade
the following work day.
PAVTNG: RttJr gravet is inplace but prior to placing
asphalt or concrete.
S|TE |NSPECT|ON: To be
made after excavation, butprior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANTCAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, butprior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,piping, accessories and other
ancillary equipment items arein place but before any
concrete is placed.
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be madeprior to covering or f illing
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
f loor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installatlon of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prlor to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installlng
any roof covering.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to
facing materials and
framing inspection.
MBIN G,
L: No work is to
be covered until these
inspections have been made
and approved.
placing
before
SPECIAL INSPECTTONS: tn accordanceSection 306 of the State Specialty Codea special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. Acopy of the special testing reports shallbe furnished to the Building Division.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
X INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board Joints and
fasteners are taped and
fi ni shed.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
STRUCTURAL CONCRETE: In
excess of 2500 pS.t. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob, (2222 l)
HIGH STRENGTH BOLTING:
During all bolt installation andtightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.BC.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
Durlng earthwork. (306 a.1.1 &
Chapter 29)
GLU.LAM BEAMS: tnspection
Certif icate by an approved
agency, furnlshed to the City,s
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
STRUCTURAL MASONRy: (306
a.7)
'ln addition to the inspec-
tions specif ied, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signatur'e, I state and agree, that I have carefully examined the completed application and do hereby cerilfy that all information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
Signature Date 7 q
AMouNr RECETVED: 4.(i 7 rEzrzT-VALIDATION 7- )-z
RECEIPT S:228,2 RECEIVED BY:
DATE PAID:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot striping, etc. must be completed beforerequesting thls inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY D^rE 7*><
,r r
SII \GFIELO
owing Prc{ect
and does not
a.9
r6qulre
sub!'ntttsd
sp6citic land use
hasThe foll
apcroval o
225 FIFTE STREET
SPRINGFIELD, OREGON
INSPECTION REQTIEST:
OFPICE: 726-3759
1. LOCATTON OF
I^EGAL DESCRIPTION
97
EIJCTRTCAL PERHIT APPLICATTON
City Job Nr*b", ?&:??
COHPT^ETE FEE SCffiDTII.^E BEtOg3
A Nev Residential-Single or
Multi-Family per dvelling unit.
Service fncluded:
ftems Cost Sum
JOB DESCRIPTION
Permits are non-transferable and expireif vork is not started vithin 180 daysof issuance or if uork is suspended for
180 days.
2. COIITRACTOR INSTALI^ATION ONLY
Electrical Contractor
Address
Ci ty Phone
Supervisor License Number
Expiration Date
Constr Contr. Number
Expiration Date
Signature of Supervising Electrician
Ovners Name
Address
DATE:
Temporary Services or Feeders
Installation, Al-teration or Relocation
200 amps"or less S 40.00
201 amps to 400 amps
-
S 55.00
0ver 401 to 600 amps
-
S 80.00
Over 600 amps or 1000-voTTs see rrBrr a66tt
D. Branch Circuits
1000 sq.ft. or less
Each additionat 500sq. ft or portion
thereof
Each Manuf'd Home. or
-Modular Dvelling
Sertice or Feeder
Services or FeedersInstallation, Alterationsor Relocation:
200 amps or less
201 amps to 400 amps
-401 amps to 600 amps
-601 amps to l-000 amps-
Over 1000 amps/volts
-Reconnect Only
One Circuit /
Each Addi tional' Ci rcui t or vi th Servi. ce
or Feeder Permit
SUBTOTAL OF ABOVE
52 State Surcharge
32 Administrative Fee
TOTAL
B
s 8s.00
's 1s.00
s 40.00
.00
.00
.00
$300.00
$ 40.00
s 2.00
ss0
Soo
s100
s130 00
C
Nev, Alteration or Extension Per Panela
s 3s.oo zffcttv 7{4*rZ> ynone ?c/? -23%,
OI{NER INSTALTdTION
The installation is being made on
property f ovn vhich is not intended
for sa1e, lease or rent.
0wners Signature:
t4
E. Miscellaneous (Service/feeder not included)
-Each installation
Pump or i.rrigation
Sign/Outline Ligh ting-
Limi ted Energy/Res
-Limited Energy/Comm
5
s 40.00
s 40.00
s 20.00
$ 36.00