Loading...
HomeMy WebLinkAboutPermit Building 1991-06-24COM M ERCIAL/ I N DUSTRlAL PERMIT APPLICATION 225 Fitth Street, Springfield, Oregon 97477 LOCATION OF PROPOS WORK: ASSESSORS MAP: SP'IINGFIELO \\+'n JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: \nOWNER: ADDRESS: CITY: PHON E ZIPSTATE: VALUEDEMOLISH OTHE DESCRIPTION OF WOR NEW - REMODEL ADDITI NAME ADDRESS PHONE ME EXPIRES PHON ERESS PLUMBING: ARCHITECT: MECHANICAL: ELECTRICAL: CONTRACTOR'S GENERAL: _ CONST. CONTRACTOR # PLUMBING NO FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft Sanitary Sewer aI Storm Sewer ft Backflow Device TOTAL PERMIT MECHANICAL NO trFF (:F{A EIGF Furnace/burner & vent <100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE - ZONING LAND USE HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER: * OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: I OF BLDGS: CONSTH. TYPE: HEAT SOURCE: SQ. FT,$/SQ. FT.VALUE @ TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE BYDATE BUILDING PERMIT ,NT tr)PLUMBI NG DEMOLITION 5% State Surcharqe rq3 5% State Su rcharqe MECHANICAL FENCE VALUE $ 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT BTOTAL PERMIT FEES EXCLUDING ELECTRICAL IA .V REQUIRED INSPECTIONS '- It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: tn accordance ELECTRICAL & and approved' Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following work. A FOOTTNGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division. excavated and forms are facing materials and before erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after ar insrab buirdins 3i::5 ::.']ff 3i3:::t"f,'.;;:r" Elly,T"',f3"t,Y5tT',rrr, ,, service equipment, conduit, and vents are complete andpiping, accessories and other ancirrary equipment items are :x? H::lfli""j[,1, jJ;[?::: Bl?lf],?E],?l*,?,o"tlH:"0in place but before any tighte-ning operations. (306concrete is placed. INSULAT|oN & vApoR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewei barriers are in place but FIREPROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43_g.drainage lines. To be made board interior wall covering is lrtJ::;:":"r"rins or fillins apptied. SpEctAL GRAD,NG, ,NDERFL.oR: p,umbins [ll:,S""=":"m'Jfl[g]"' EX:,lJt!ii-tii:,5Jb'i],"1 electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the City's POST & BEAM: To be made interior and exterior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 U'BC' insulation, decking or floor plastering is applied or before STDS' 25-10'11)' sheathing. " gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or f loor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specif ied, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE ENT Certificate of Occupancy has been issued by the Building Division the .eF \^)DDIT co By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with OFIS 701.055 will be used on this project. I furtheragree to ensure that all required inspections are requested at the propertime, that project address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all -zSi gnatu Date times durin co tructi VALIDATION AMOUNT RECEIVED RECEIPT *:RECEIVED BY: DATE PAID PLANS REVIEWED BY DATE 1r zg51 4