HomeMy WebLinkAboutItem 11 Capital Improvement ProgramAGENDA ITEM SUMMARY Meeting Date: 1/18/2022 Meeting Type: Regular Meeting Staff Contact/Dept.: Jeff Paschall, DPW -CMD Staff Phone No: 541-726-1674 Estimated Time: 10 Minutes SPRINGFIELD Council Goals: Maintain and Improve CITY COUNCIL Infrastructure and Facilities ITEM TITLE: 2023-2027 CAPITAL IMPROVEMENT PROGRAM, A COMMUNITY REINVESTMENT PLAN ACTION Conduct a Public Hearing on the Capital Improvement Program (CIP). REQUESTED: After Public Input, by Motion Adopt or Reject the 2023-2027 CAPITAL IMPROVEMENT PROGRAM, A COMMUNITY REINVESTMENT PLAN. ISSUE The City of Springfield's 2023-2027 CIP — A Community Reinvestment Plan has STATEMENT: been drafted by staff, reviewed by the Planning Commission (September 21, 2021 and October 5, 2021), and reviewed by the City Council in work session (January 3, 2022). It is now ready for public hearing and adoption. ATTACHMENTS: 1. Communication Memorandum from 1/3/2022 work session 2. 2023-2027 Capital Improvement Program— A Community Reinvestment DISCUSSION/ The City of Springfield's Capital Improvement Program (CIP) is a five-year FINANCIAL Community Reinvestment Plan that describes the near-term program for funding, IMPACT: evaluation, and construction of City owned and operated public facilities. A fundamental purpose of the CIP is to facilitate the efficient use of capital resources to maintain, improve, and expand City assets. The underlying concept is to strategically prioritize and program these resources to extend the useful life of existing assets, replace assets before failure, and to support growth with timely expansion of key infrastructure. The first year of the adopted CIP will be used to program new projects in the FY23 Capital Budget. As a reference, the Council Briefing Memorandum from the January 3, 2022 work session is included as Attachment 1. After hearing public comments, Council is requested to adopt the 2023 — 2027 Capital Improvement Program by motion. MEMORANDUM City of Springfield Date: 1/3/2022 To: Nancy Newton COUNCIL From: Jeff Paschall, City Engineer BRIEFING Tom Boyatt, Community Development Director Subject: 2023-2027 CAPITAL IMPROVEMENT MEMORANDUM PROGRAM, A COMMUNITY REINVESTMENT PLAN ISSUE: Draft project lists have been prepared for the City of Springfield's 2023-2027 CIP — A Community Reinvestment Plan. The lists have been reviewed by the Planning Commission and are now being brought to the City Council for review and comment prior to a Public Hearing scheduled for January 18, 2022 COUNCIL GOALS/ MANDATE: Maintain and Improve Infrastructure and Facilities Maintaining and adopting an annual CIP is integral to implementing several Council Goals, but it is critical to maintaining and improving City owned infrastructure and facilities, or identifying new infrastructure needs as the City grows. DISCUSSION: The City of Springfield's Capital Improvement Program (CIP) is a five-year Community Reinvestment Plan that describes the near-term program for funding, evaluation, and construction of City owned and operated public facilities. A fundamental purpose of the CIP is to facilitate the efficient use of capital resources to maintain, improve, and expand City assets. The underlying concept is to strategically prioritize and program these resources to extend the useful life of existing assets, replace assets before failure, and to support growth with timely expansion of key infrastructure. The CIP is typically updated on a biennial schedule, however due to the many unforeseen events over the last year, the update did not follow the traditional schedule and process. In addition, the traditional CIP update schedule was not well aligned with the City's budget calendar, with the draft Capital Budget completed before adoption of the CIP. Council agreed to update the schedule so that the CIP can be adopted in the fall/winter prior to preparation of the draft Capital Budget during the winter/spring. The CIP is an intermediate step in a process that originates with long term planning activities that anticipate the need for public facilities at least 20 years into the future and concludes with the adoption of the annual Capital Budget to appropriate funds to construction projects. Operation and maintenance cost is separately included in the City's budget. As an interim step in the process, the CIP identifies the facilities concepts that may reasonably be expected to be required in the next five years, refines those concepts, and provides a priority list of projects. Priority projects are selected from the long list of needed capital improvements identified in the various master plans, refinement plans, or other asset management reports and tools. The draft project lists are then presented to both the Planning Commission and the City Council for public review and comment prior to adoption by the City Council. Attachment 1, Page 1 of 3 MEMORANDUM Page 2 Over the last decade, the City has seen the wastewater and stormwater funds stabilize. This supported completion of nearly all the rehabilitation and upgrade work identified in the 2008 Wastewater Master Plan. In addition, some large stormwater projects such as the Mill Race restoration and Mill Race Stormwater Treatment Facility were completed. Street and Transportation funds have not seen growth to keep pace with operating costs and do not provide for robust capital spending on those systems. Voters approved a general obligation bond in 2018 dedicated to preservation of several collector and arterial street segments, otherwise the City relies on federal and state funding sources to support a majority of street and transportation projects with a majority share of street capital transfers and systems development charges dedicated to providing required local match to those outside funding sources. The project section of the 2023-2027 CIP is organized by asset system with three sections for each system. The first section is a table that has details for the projects that are either in the current capital budget or have been completed since the last CIP update. The next section is the project detail sheets for those projects proposed to be programmed over the next five-year cycle. The last section is another table detailing the list of currently unfunded or partially funded projects. As appropriate resources become available or potential grant opportunities are identified these lists will be used to match projects with those opportunities. Stormwater — In review of the current capital budget and the previous CIP, a majority of the projects have been placed into a hold status. This is due to focusing limited capital delivery staffing resources to delivery of the 2018 GO Bond street preservation projects, as well as federal aid funded projects such as Mill Street Reconstruction. However, water quality initiatives are being advanced as many of the street projects incorporate improvements to treat runoff from street surfaces. Street and Transportation — Currently all but one of the street segments scheduled for preservation through the voter approved five-year general obligation bond are either completed or in active construction. The final segment (Centennial Boulevard from Aspen St. to Prescott St.) is anticipated to be under construction in the spring of 2022. Several safety and pedestrian projects were also completed over the past three years, and many others are in the design phase with construction anticipated in 2022 or 2023. Wastewater — Several unplanned sewer projects have been completed over the last couple of years as issues have been identified through routine inspection by operations staff, or through other project work. The most recent example is the repair of a broken pipe as part of the Mohawk Boulevard preservation project. Several other projects are currently in the design phase with anticipated construction in either 2022 or 2023. There are two pipeline rehabilitation projects proposed in the 2023-2027 CIP, that have been identified through the Flow Monitoring Analysis project. Additionally, with the completion of the hydraulic model update, staff is planning to have a consultant under contract in early 2022 to complete an update of the Wastewater Master Plan. Buildings and Facilities — Available funding for building and facilities projects is very limited so there is a long list of identified unfunded projects or programs. However, upgrades to the fuel facility storm system and a building assessment at the Booth Kelly site were completed in 2021. FINANCIAL IMPACT: The CIP does not carry budget authority. It is, however, a valuable planning tool used to guide staff, the Budget Committee, and the City Council in creating the annual budget to fund priority projects. Attachment 1, Page 2 of 3 MEMORANDUM Page 3 RECOMMENDED ACTION: The Council is requested to review and provide consensus for the recommended five-year CIP. The CIP, as modified by any Council input, will be brought back to the Council for public comment and adoption at their January 18, 2022, regular meeting. Attachment 1, Page 3 of 3 SPRINGFIELD ii970! EGON 1 � ; - 4 Ilk A. A Community Reinvestment Plan 2023-2027 N eei.. n l7 Nar oW Rd v = M -1a Rd H+Y taA u, m OlymPicgr ¢'�a V � nyyV Blvd Centennial Blvd S� Pioneer Parkway West y N kgSpringfield 5'a�gye Main St m S n n ragye•w Attachment 2, Page 1 of 67 58th St Thurston Re Main St CITY OF SPRINGFIELD, OREGON FY 2023-2026 Capital Improvement Program (CIP) A Community Reinvestment Plan Sean VanGordon, Mayor City Council Damien Pitts Ward 1 Steve Moe Ward 2 Kori Rodley Ward 3 Leonard Stoehr Ward4 Marilee Woodrow Ward 5 Joe Pishioneri Ward 6 Nancy Newton, City Manager Niel Laudati, Assistant City Manager Attachment 2, Page 2 of 67 TABLE OF CONTENTS EXECUTIVESUMMARY................................................................................................................... 1 SECTION I CAPITAL IMPROVEMENT PROGRAM CIPGoals........................................................................................................................... 5 CIP Project Development and Review Process................................................................. 5 Typesof Capital Needs...................................................................................................... 6 Project Selection Resources.............................................................................................. 6 Facilities Plans Wastewater Master Plan..................................................................................... 6 Stormwater Facilities Master Plan....................................................................... 7 Building and Facilities Preservation and Maintenance Work .............................. 8 UrbanRenewal Plans........................................................................................................ 9 Land Use Plans Public Facilities and Services Plan........................................................................ 9 Springfield Transportation System Plan............................................................ 10 RefinementPlans............................................................................................... 10 SECTION II FUNDING Capital Project Funding.............................................................................. Systems Development Charges................................................................. External Revenue Sources.......................................................................... OtherRevenues......................................................................................... City Accounting Funds Used for Capital Resources ................................... SECTION III FINANCIAL SUMMARIES Financial Summaries—All Programs SECTION IV PROJECTS Projects Table of Contents 12 12 13 13 .. 14 .......................................................................... 18 ................................................. 19 Attachment 2, Page 3 of 67 EXECUTIVE SUMMARY INTRODUCTION The City of Springfield's Capital Improvement Program (CIP) is a five-year Community Reinvestment Plan that identifies capital investments necessary in the next five-year horizon to sustain, improve, and grow City assets and infrastructure systems. A fundamental purpose of the CIP is to prioritize and balance capital needs with capital funding resources. The underlying concept is to program all reasonably available sources of revenue for future expenditures. Since projected revenue sources may produce significantly less than the needs identified in the City's infrastructure facilities plans and asset management system, the CIP is used as the vehicle to balance priorities and funding while maintaining good stewardship over City assets. The CIP is updated on a biennial schedule and is an intermediate step in a process that originates with long term planning activities that anticipate the need for public facilities at least 20 years into the future and concludes with the adoption of the annual Capital Budget. Based on available information during each update cycle, projects are selected and prioritized from the long list of needed capital improvements identified through the City's asset management program and from the various master plans and refinement plans adopted by the City Council. Traditionally, the principal constraints in developing the CIP are the realistic availability of staff and financial resources to support the timely completion of each cycle's project portfolio. The first two years of the CIP will be the basis for developing the City's Capital Budget for FY23 and FY24 with such modifications as are necessary or prudent to respond to immediate concerns and the often - fluid nature of funding opportunities. In preparation of the capital budget, it is important to consider not only the immediate availability of financial resources, but also the availability of resources to manage design and construction. This may mean staff resources to conduct those activities in house, or to manage consultants who take on responsibility for design and construction management. A successful capital budget must be mindful of budgeting only those projects or project phases that the City has the capacity to deliver. The Development and Public Works Department maintains two capital project delivery groups, one for the delivery of local projects presented in this document, and the second for delivery of regional projects for the Metropolitan Wastewater Management Commission capital improvement program. Projects that are currently in Capital Budget and in various stages of planning, design, and construction are shown in a table at the beginning of each specific infrastructure program section. At the end of each program section the CIP includes a list of projects that have been identified through various facilities planning efforts but are currently unfunded or not programmed due to staff resource limitations. These projects are aimed at improving neighborhoods, providing for economic growth, improving traffic safety, mobility, and access, complying with environmental standards, and maintaining the existing city infrastructure. FY At1%tM6f0t2 Ir 6r*r6f®'Oram Page 1 CAPITAL IMPROVEMENT PROGRAM DEVELOPMENT AND REVIEW The public input process for the CIP typically begins every other year in August when citizens, organizations, and City staff are asked to suggest projects for consideration in the CIP. The Planning Commission and the City Council then review the draft CIP and a public hearing is held prior to Council adoption. o August: CIP project review process starts o September: Capital project requests go to Public and City Departments o September: publish Internal draft CIP o September/October: Planning Commission reviews Draft CIP o November/December: City Council work session review and Public Hearing on Draft CIP o January/February: Draft Capital Budget Prepared o April/May: Capital Budget presented to Budget Committee The City's final commitment to spend public funds occurs through the annual City budget process. Although the CIP is the starting point for the annual Capital Budget, the projects budgeted each year can vary somewhat from those proposed in the CIP. PROJECT CATEGORIZATION Projects in the CIP are grouped by relevant infrastructure program areas (stormwater, streets and transportation, wastewater, and buildings and facilities). The first list of projects in each program area are those that have been funded in previous CIPS and are in the current capital budget. The next set of projects are those that are proposed for programming over the next five-year period and are described in detailed projects sheets. The final list of projects in each program area are high priority needs that are not scheduled to be programmed over the next five-year period due to lack of funding or staffing resources. Should available resources be identified, these projects may be budgeted before the next CIP update. The following are descriptions of the City's most significant projects in the CIP: Franklin Boulevard Phase 2 —The Franklin Boulevard Reconstruction Project will construct modern urban standards improvements on the old Hwy 99 alignment in Glenwood called Franklin Boulevard between the Franklin/Glenwood intersection and the Franklin/McVay intersection to support Glenwood redevelopment and regional safety and mobility for transit, bicycles/pedestrians, and autos. Phase 1 has been completed with the construction of the roundabouts at the Franklin/McVay intersection and improvements extending just west of Concord Street. Design of improvements from Mississippi Avenue to Henderson Avenue is currently underway with funds received in 2020. In November 2021 that City learned that a U.S. Department of Transportation Rebuilding America, Infrastructure with Sustainability and Equity (RAISE) Grant was awarded to the project in a joint application with Eugene. This grant award will fund the construction of the roundabout at Mississippi Avenue. The City continues to seek funding opportunities to continue advancing the future vision and improvements for Franklin Boulevard. Sanitary Sewer Rehabilitation Projects — One of the key goals of the Capacity, Management, Operations, and Maintenance Program is to eliminate inflow and infiltration (1/1) of groundwater into the sanitary FY At1%tM6f0t2 Ir 6r>ar6 f®'Oram Page 2 sewer system. Utilizing the recently updated and calibrated hydraulic model, sanitary sewer basins with potential high levels of 1/1 were identified. Two micro -basins (70th Street and 72nd Street) have been programmed for rehabilitation in the CIP. 42nd Street Operational, Safety, and Mobility Improvements — Upgrade to address safety and operations, in particular for freight accessing the OR 126 Expressway -Freight Route and OR 12613 -Main St. Upgrade the UP rail crossing serving the International Paper industrial center, upgrade intersection control at the westbound OR 126 ramp terminal, add urban level lighting, add ADA -accessible connections from Olympic St. and Industrial Ave. to the McKenzie Levee Path, add left turn bay on 42nd St. at Industrial Ave and improve traffic signals at the eastbound OR 126 ramp terminal, Olympic Street and the International Paper driveways Irving Slough Improvements —The project begins near 42nd Street and OR 126 and runs north to the Urban Growth Boundary. The project consists of open channel improvements in multiple locations for flood control and the construction of a stormwater storage facility. Water quality improvements and upgrades will be incorporated into the project where applicable to meet regulatory requirements. This project is identified as a priority in the adopted Stormwater Facilities Master Plan. FINANCING There are limited sources of funding for capital activity. The principal sources include revenues derived from user fees or those taxes (such as fuel taxes) which function like user fees. By Council direction, these are preferentially devoted to preservation of existing infrastructure. The second major source is Systems Development Charges (SDC), which are designed to recover, from development, the cost impact that development has on infrastructure, both existing and needed to meet the future demands of development. A large portion of these revenues must, by law, be devoted to capacity increasing capital activity. Only that portion of SDC revenue which is derived from a reimbursement fee may be spent on preservation or rehabilitation of existing infrastructure. A third major source of capital funding is external contributions, in the form of intergovernmental grants or loans, payments by developers for specific improvements, and assessments of benefitted property owners, also for specific improvements. Other sources such as revenue leveraged by tax increment financing in the City's two urban renewal districts (Glenwood and Downtown), and revenue from internally generated charges also play a role. In addition to funding direct project construction, Local Wastewater and Drainage SDC revenues fund debt service payments for bonds sold to fund prior projects. These projects include both those that increased capacity and wastewater rehabilitation projects as part of program to reduce inflow and infiltration and meet permit requirements. The City sold local wastewater revenue bonds in 2009 and storm drainage revenue bonds in 2010. Wastewater Bond proceeds were dedicated to completing required rehabilitation projects as well as expanding sanitary sewer service into unserved areas within the Urban Growth Boundary to promote future growth. Stormwater revenue bonds have been used to complete several major stormwater initiatives, and several capital projects related to the City's obligation to address stormwater quality, permitting and threatened fish impacts.' ' For bonding purposes, the local wastewater and stormwater utilities are combined into a single sewer utility. FY At1%tM6f0t2 Ir 6r&r6f®'Oram Page 3 In 2018 voters passed a 5 -year general obligation bond dedicated to street preservation of several arterial and collector streets across the City. The last of these projects is scheduled for completion during the 2022 construction season. In addition, a portion of increased revenue to the street fund from the 2017 State Transportation Bill (HB 2017) was directed to the slurry seal program allowing for several local residential streets to be crack sealed and an asphalt slurry to be applied to reseal and preserve the existing surface. Current revenue projections will allow for small annual program to preserve and maintain local and residential streets to be funded in the CIP for the next 5 -year cycle. Additionally, the ADA transition program will see a small increase in funding as well as an annual allocation to continue to advance upgrades to bring City facilities into compliance with current standards improving access to all users. However, it must be noted that current revenue projections do not support an effective street preservation program. System Development Charge (SDC) revenue has remained stable with improvement SDCs the majority of funds received. Improvement SDC revenue may only be programmed in support of projects that expand capacity and are on the adopted SDC projects lists. SDC reserves are not sufficient to support all projects on the list and are typically utilized to leverage external funding sources such as federal and state grants. External sources, such as intergovernmental grants, or developer or benefitted property owner contributions, are an important, but highly volatile funding source. Generally, they do not form the basis for concluding a project can be funded, but rather when such funding sources develop, can be a trigger to increase the priority of a project. Recently, the City has had some success in developing external funding for isolated projects, such as the Mill Street Reconstruction, Franklin Boulevard, and the South 28th Street paving project. Future success is highly dependent upon the fiscal and monetary policies of other levels of government. CONCLUSION The Capital Improvement Program serves as a guide for the City's needed infrastructure improvements. It is shaped by citizen input, the best professional judgment of staff and outside experts, and estimates of the City's projected financial resources. The CIP is subject to biennial review and revision. The direction provided by this document helps the City of Springfield target its resources to capital improvements which best serve the needs of the citizens of Springfield. FY At1MtM6f0t2 Ir erfpr6f®dram Page 4 SECTION I CAPITAL IMPROVEMENT PROGRAM CIP GOALS The goals of the CIP include: 1) Providing a balanced program for capital improvements given reasonably anticipated funding and staff resources over a five-year or greater planning period and identifying the extent to which resources can meet capital needs; 2) Improving neighborhoods; 3) Providing for economic and community growth; 4) Improving safety, access, and mobility across all transportation modes; 5) Complying with environmental standards and improving environmental quality; 6) Maintaining the existing City infrastructure; and 7) Protecting public health and safety. CIP PROJECT DEVELOPMENT AND REVIEW PROCESS Capital improvements must be consistent with the Metropolitan Area General Comprehensive Plan, the Public Facilities and Services Plan (PFSP), the Springfield 2030 Comprehensive Plan, The Springfield Transportation System Plan, and all other Council adopted plans and policies. The relevant plans are listed in a subsequent section of this report. In general, all Capital Projects included in the CIP meet one or more of the following criteria: 1) Project addresses State or Federal laws or regulations to eliminate or reduce the potential for environmental degradation or health hazards or to address issues that affect the safety and general welfare of the community. 2) Project maintains existing assets, extends the useful life of assets, or improves or expands infrastructure to facilitate community development and/or improve operations. 3) Project responds to requests from citizens, neighborhood groups, advisory committees, or government bodies, and provides a public benefit. 4) Project is included in local and/or regional infrastructure plans. In the adopted CIP only those capital improvements which are funded within the current projections for the appropriate revenue streams are considered. Projects for which the funding is not identified or programmed are shown in the unfunded priority project list strictly for informational purposes. Historically, the CIP has not attempted to consider whether or not the City has the operating resources (either staff or funding for consultants to manage projects), necessary to advance a particular project. FY At1%tM6f0t2 Ir 6r&r6f®'Oram Page 5 TYPES OF CAPITAL NEED Rehabilitation & Preservation of Existing Capital Assets The CIP reflects the broad direction of the City Council to preserve existing capital assets before they fall into disrepair and require expensive rehabilitation or replacement. Preservation is an important tool used to protect or extend the asset's useful life. If preservation is not completed on a regular and timely basis, the asset will deteriorate prematurely and its benefit to the community will be lost. In that event reconstruction may be required. Reconstruction costs are frequently multiple times the cost of preservation and maintenance, particularly for street surfaces. All capital assets require preservation or rehabilitation activities during their useful life and the City must demonstrate fiscal responsibility by planning for this need. Inclusion of these projects in the CIP is a necessary step to plan for that preservation and rehabilitation. New Capital Facilities and Capacity Enhancements As the City reaches outward into the Urban Growth Boundary or anticipates infill or increased density of development in the city limits, the need to plan for expansion of capital assets and provide safe and efficient capital facilities increases. New streets are necessary to provide for the movement of goods and people and access to property in developing areas. In addition, wastewater and stormwater systems are necessary to protect water quality, people and the environment in order to preserve the health, welfare, and safety of the community. PROJECT SELECTION RESOURCES The following is a list of various plans with descriptive summaries that guide the decisions made about CIP project choice. The City draws a distinction between facilities plans, which focus on facility needs and how systems function, and land use plans, which provide more general guidance. General guidance can inform the development of facilities plans and can constrain facility development to conform to the policy set of the land use planning document. (The Springfield Transportation System Plan is somewhat of an exception to these distinctions, since it is a land use plan that also serves as a facilities plan and does contain specific project guidance.) FACILITIES PLANS Wastewater Master Plan (2008) The City of Springfield provides wastewater collection and conveyance services by way of a system of pipelines and pump stations that it owns and operates. Along with the City of Eugene, Springfield discharges to a regional collection and treatment system owned by the Metropolitan Wastewater Management Commission (MWMC). Springfield's Wastewater Master Plan provides an assessment of existing and future needs for the City's collection system. Because the City's system connects to the regional system, the Master Plan must consider and reflect results of the MWMC's Since completion of the Wet Weather Flow Management Plan (WWFMP) in 2010, The City along with its regional partners (Eugene and MWMC) have written and implemented a Capacity, Management, Operations and FY At1%tM6f0t2 Ir 6r9ar6 f®'Oram Page 6 Maintenance program. One of the key elements was to conduct a gap analysis across all aspects of the operation and management of the City's wastewater collection system. For the CIP, a key gap, was a developing and implementing a comprehensive flow monitoring plan that included data collection and analysis of data to identify necessary projects. The initial phases of this work have completed and will now inform an update to the Wastewater Master Plan which currently underway. The Current Master Plan is intended to identify existing and future capacity constraints, determine capacity requirements and identify system improvements necessary to meet the City's projected population and employment growth through the 2025 planning year. The Department of Environmental Quality has issued a National Pollutant Discharge Elimination System (NPDES) permit (#102486) for Springfield, Eugene and MWMC, which includes conditions under which treated wastewater can be discharged to the Willamette River. Included in those conditions is a requirement that Springfield, Eugene and MWMC fully implement a wet weather flow management strategy to comply with the State's Bacteria Standard, which prohibits storm related overflows. The standard states that no untreated wastewater can be discharged to the waters of the State or US, except under the following conditions: for flows greater than those occurring for the 24-hour duration, 1 in 5 -year winter and 1 in 10 -year summer storms. Subsequent to the development and completion of the WWFMP, the Oregon Department of Environmental Quality, in response to an objection from the Environmental Protection Agency (EPA), is no longer permitted to include the exceptions for untreated wastewater discharges as provided by the State's Bacteria Standard. DEQ is currently placing a prohibition on all overflows from wastewater conveyance systems and associated pump stations. This regulatory change places additional burden on the conveyance system operation and maintenance to eliminate all wet weather-related overflows. The NPDES permit for the regional wastewater treatment plant is scheduled for renewal in the first quarter of 2022 and will contain the prohibition of all overflows absent a change of policy from EPA. Stormwater Facilities Master Plan (2008) In 2008, the City Council adopted a comprehensive Stormwater Facilities Master Plan (SWFMP). The purpose of this document is to provide a guide to plan for more comprehensive, efficient, and multi - objective management of the City's stormwater system. The majority of the City's stormwater runoff drains through an integrated network of pipes and open channels, discharging either directly to the main stem Willamette or McKenzie Rivers or through outfalls to a tributary of either of those rivers. Prior to the SWFMP, the City typically designed and constructed facilities for treating and conveying stormwater runoff on an individual development or site -by -site basis. In addition, as is typical for nearly all cities, most of the City's stormwater collection and conveyance system was historically designed and built with the sole objective of addressing flooding issues. Most of the major portions of the City's stormwater drainage system infrastructure were built during the 1960s and as development increased, the system was retrofitted with extensions and additions. Most of the main conveyance system was not upsized to facilitate the increased flows associated with full City build out. FYAR1edYW i_%1 PSgWrP@itRrEWam Page 7 The City also has a Council -adopted Stormwater Management Plan which establishes goals, policies and implementation actions to address water quality and management of the stormwater system, including open waterways within the City's jurisdiction. This plan is required and approved by the Department of Environmental Quality (DEQ) as part of its issuance and management of the City's stormwater discharge permit. In June of 2021, after a several year process, DEQ issued the City an updated Phase II National Pollution Discharge Elimination System (NPDES) General Stormwater Permit. This revised permit contains more stringent regulatory requirements and standards that the City will be expected to meet by the end of 2024. Additionally, the Willamette River and McKenzie River (a tributary to the Willamette River) are listed on the State's 303(d) list indicating that water quality standards for specific pollutants in these streams are currently not being met. The City must address Total Maximum Daily Load (TMDL) limitations on the level of certain pollutants (temperature, bacteria, and mercury) through implementation of the Stormwater Management Plan and the TMDL Implementation Plan. These plans and requirements impact the nature and design of capital projects that are constructed to manage stormwater. Building & Facilities Preservation and Maintenance Work Plan This plan identifies and addresses capital improvement needs at City owned buildings, including: City Hall, Springfield Justice Center, Springfield Museum, Booth Kelly Center, fire stations, Development and Public Works operations buildings, and the Depot. The plan tracks and provides a snapshot of repairs and asset preservation improvements that are immediately evident, and which have been deferred for various reasons, together with ongoing maintenance needs and necessary replacement of building systems expected to reach the end of their useful life. The City continues to face several critical building/facilities operations, maintenance, and preservation issues. In preparation of the FY21 Capital budget, a $59 million list of deferred/backlog facilities repairs were identified, along with a $300k annual need for routine maintenance. needs as well as ongoing annual maintenance/preservation needs. In FY09, the City implemented an Internal Building Preservation Charge with intent to program $300k annually for ongoing preservation. Since inception, the Internal Building Preservation Charge on average has generated just over $260k per year dedicated to projects, through FY19. Staff has developed the City Buildings/Facilities Work Plan inclusive of all City Fire Stations, City Hall, Springfield Justice Center, Development and Public Works operations facilities, Springfield Depot, and the Carter Building. For example, the Buildings and Facilities unfunded project list included in this CIP an unfunded project to replace the City Hall HVAC System at an estimated cost of $1.8 million. The last major update or replacement to the system was nearly 20 years ago and the current units are nearing the end of the serviceable life. Additionally, there are other project management responsibilities related to public buildings and facilities maintenance and preservations that have been identified through previously adopted CIP documents, such as preservation projects at the Depot and Booth Kelly and demolition of the Carpenter shed and gun range at Booth Kelly. Any future building needs such as new fire station construction or potential demolition of the Carter Building will be addressed through the CIP process. FYAR1ed W i_%1 PSgWrP JntRrO7am Page 8 URBAN RENEWAL PLANS Downtown Urban Renewal Plan (2007) The primary goal of the Downtown Urban Renewal Plan is to assist in the revitalization of business and elimination of blight in the downtown area. The Downtown Urban Renewal Plan has projects listed to obtain these goals. Glenwood Urban Renewal Plan (1999, updated 2004) The primary goal of the Glenwood Urban Renewal Plan is to eliminate blighting influences found in the Renewal Area. The Glenwood Urban Renewal Plan project list includes: o Promote private development and redevelopment; o Rehabilitate building stock; C) Improvements to streets, sidewalks, bikeways, pathways, streetscapes, parks, and open spaces; o Utility improvements; o Parking; o Public facilities; C) Housing; o Public signage and community gateway entrance improvements. LAND USE PLANS Metro Plan The Metro Plan serves as the sole official long-range comprehensive plan (public policy document) of metropolitan Lane County and the cities of Eugene and Springfield. As Springfield and Eugene carry out their obligations under ORS 197.304 which required establishing separate urban growth boundaries, more comprehensive planning is taking place on a city -specific basis, through city -specific plans adopted by each jurisdiction. The Metro Plan continues to include some of the regional land use planning that is collaboratively addressed by Lane County, Eugene and Springfield. The Metro Plan provides the overall framework for planning functions, including establishing the policy basis for a general, coordinated, long-range approach among affected agencies for the provision of the facilities and services needed in the metropolitan area. Springfield Comprehensive Plan The Springfield Comprehensive Plan establishes the Springfield urban growth boundary and sets policy direction in Springfield -specific elements, including Economic Development, Residential Land Use & Housing, and Urbanization. The Recreation Element is the Willamalane Park and Recreation Comprehensive Plan, and the Transportation Element is the Springfield Transportation System Plan. Springfield will continue to further add to and revise the Springfield Comprehensive Plan and come to rely less on the Metro Plan for city -specific policy. Public Facilities and Services Plan FYA4t1ed(W i_%1 PSgWrP9ntRrO7am Page 9 The Public Facilities and Services Plan (PFSP) is an element of the Eugene -Springfield Metropolitan Area General Plan (Metro Plan). It is the Metro Plan Element which identifies significant facilities in general terms and confirms that those facilities are consistent with the planning policies set out in the Metro Plan. The projects identified in the PFSP are generally a subset of the projects contained in the various facilities plans. The PFSP does not identify transportation projects, which are covered in the Springfield Transportation System Plan, but does identify wastewater and stormwater projects, among others. The PFSP does not, nor should it, identify every project; it includes only those projects identified as significant on the basis of definitions set forth in the PFSP. Springfield Transportation System Plan (2014) The Springfield 2035 Transportation System Plan (TSP) provides a 20 -year blueprint for how the City should maintain and improve the transportation network to meet growth demands within Springfield's Urban Growth Boundary (UGB). The 2035 TSP ensures the City's vision for the transportation system meets community needs, communicates the City's aspirations, and conforms to state and regional policies. Refinement Plans Downtown Refinement Plan (1986, updated 2005) The primary goal of the Springfield Downtown Refinement Plan is to provide goals and policies through which downtown Springfield may become a more vital and attractive place to shop, conduct business, and recreate. Goals include creating a pedestrian friendly downtown, new opportunities for a variety of land uses, adequate parking, and a positive identity for Downtown. See *link East Kelly Butte Neighborhood Plan (1992) o The primary goal of the East Kelly Butte Neighborhood Plan is to address the concerns of the citizens living within the East Kelly Butte Neighborhood such as land use, housing, transportation, public facilities and neighborhood character. East Main Refinement Plan (1988) The primary goal of the East Main Refinement Plan is to address the concerns of the citizens living within the East Main Refinement Plan Neighborhood such as providing housing options, a mix of land uses, commercial centers, compatible industrial development, a safe and efficient street system including bicycle facilities. See *link Gateway Refinement Plan (1992) The primary goal of the Gateway Refinement Plan is to refine and augment the Eugene -Springfield Metropolitan Area General Plan to provide specificity for site-specific land use decisions, and to identify the near and long-term public facilities needs to support development and livability of the area. This plan incorporates goals and policies, controls, and design standards for elements such as land FYAR1edYW i_%1 PSgWrP9itRrO7am Page 10 development, economic development, natural assets and open space, transportation systems, and public facilities. See *link. Glenwood Refinement Plan (1999, updated 2012) The primary goal of the Phase I Glenwood Refinement Plan Update was to facilitate redevelopment in the Glenwood Riverfront District based on the successful implementation of the Plan's vision, policies, and standards. The plan identifies the density, mix, type, and location of housing, employment land, and public open space and the required level of public facilities to support projected demand. See *link Mid -Springfield Refinement Plan (1986) The primary goal of the Mid -Springfield Refinement Plan is to assign site-specific plan designations in areas designated "Mixed -Use" on the Metro Plan Diagram and to recognize the needs of industrial and commercial land uses and to resolve conflicts with residential neighbors. Goals were set to address these concerns. See *link Q Street Refinement Plan (1987) The primary goal of the Q Street Refinement Plan is to guide land use decisions in the Q Street area. Land use decisions will be made to, among other things, provide for commercial development, enhance existing neighborhoods, attract medium and high-density residential development, discourage through truck traffic. See *link FYARIedYFWi_%1 PagwrWtRro7am Page 11 SECTION II FUNDING CAPITAL PROJECT FUNDING There are limited sources of funding for capital activity. The principal sources include 1) revenues derived from user fees or those taxes (such as fuel taxes or voter approved general obligation bonds) which function like user fees; 2) Systems Development Charges (SDCs), which are designed to recover from development the cost impact that development has on public infrastructure; 3) external contributions, in the form of intergovernmental grants or loans, payments by developers for specific improvements, and assessments of benefitted property owners, also for specific improvements; and 4) other sources such as revenue leveraged by tax increment financing in the City's two urban renewal districts, and revenue from internally generated charges, which at present play a minor role in capital project funding. USER FEES Each of the three public infrastructure systems (streets, sanitary sewers, and storm drainage) is funded by fees paid by those who use the system. In the case of the local wastewater and storm drainage systems those fees are directly billed to users. In the case of the transportation system those fees are collected in the form of taxes on motor fuel at both the state and local level, by state fees for licensing and registration of drivers and vehicles, as well as weight mile taxes imposed on the trucking industry, and via temporary property tax increases that result from approved general obligation bonds. The City issued revenue bonds in 2009 and 2010 to fund local wastewater and storm drainage capital projects. Revenue bonds are typically paid for with fees collected. In 2018 the voters approved a 5 -year general obligation bond to repair specific arterial and collector streets to avoid more costly and disruptive future roadway reconstruction. SYSTEMS DEVELOPMENT CHARGES The second major source of capital funding is Systems Development Charges (SDCs). These are charges imposed on development to provide funding to assure that the City can fund the cost of the infrastructure needed to serve that level of development. The City currently has SDCs for transportation, wastewater, and stormwater. SDCs are calculated based on a methodology which must be adopted by the Council and which must conform to State law. The process involves two separate components. The first is an improvement fee which is based on a determination of which capital projects are needed to accommodate growth and the amount of additional capacity that is created by those projects to meet growth demands. The second component is a reimbursement fee, which is based on new development's use of the existing system and the amount of capacity available in that system. If the system has existing capacity, then development can be charged a fee based upon the units of existing capacity development will require. These charges are increased annually based on documented increase in the Cost of Construction Index. FYAR1edYW i—%1 PSg erpfftRro7am Page 12 EXTERNAL REVENUE SOURCES These sources include both intergovernmental grants and loans as well as contributions by private individuals to the cost of infrastructure either through assessments imposed by the City or voluntarily as part of a proposal to develop property in the City. In many cases these sources of revenue, however derived, are accompanied by restrictions on their use. The City regularly receives allocations of transportation funding from Federal programs. The Central Lane Metropolitan Planning Organization (CLMPO) acting through its Metropolitan Policy Committee (MPC) allocates Federal formula funds to its member jurisdictions for planning, preservation and construction projects on portions of the transportation system that are regionally significant. In addition, the City regularly seeks Federal funding directly through efforts focused on the Oregon congressional delegation. In the past, the local wastewater system has benefitted from a variety of Federal programs, most notably the Clean Water State Revolving Fund (CWSRF), a program funded by Federal dollars. In recent years, however, little to no Federal aid has been available for local wastewater activity. This may change in the future with the recent passage of the Federal infrastructure bill, but the extent to which additional federal dollars will be available remains to be seen. Private contributions toward capital funding also are available, but generally in restricted circumstances. In order to facilitate provision of services to a new development, a developer can make a significant contribution to a particular project when it is needed for the development in question when the City does not have the financial resources to construct the project in circumstances which fit with the developer's timetable. Lastly, individual citizens sometimes contribute in the form of assessments for specific projects which benefit their properties. This is done through the creation of a local improvement district (LID), including all of the benefitted properties. The cost of the project is then assessed against those properties on a proportionate basis. OTHER REVENUES There are two other alternative revenue sources available for capital project funding. The first is tax increment financing through the two urban renewal districts created by the City — one in Glenwood and one in Downtown. In an urban renewal district additional taxes resulting from increases in assessed value are sequestered and made available to the district, which then uses those revenues to support debt service on urban renewal bonds used to finance projects within the district. The second alternative revenue source is an internal charge which is assessed against City departments' operating Budgets to provide funding for preservation and rehabilitation of City buildings and structures. FYAR1edYW i-%1 PSgWrP@itRr07am Page 13 CITY ACCOUNTING FUNDS USED FOR CAPITAL RESOURCES USER FEE/TAX FUNDS Street Capital Fund Purpose: To account for operation, maintenance, and construction of the City's streets and transportation system. This includes the City's pavement preservation program, signal operations, bicycle and pedestrian facilities, and street light replacement and maintenance. Revenues are generated from a three -cent local motor vehicle fuel tax and a State fuel tax. Restrictions: Use of these funds is restricted to activities within public rights of way by the Oregon Constitution. Wastewater Capital Bond Purpose: To account for the construction of capital facilities which are identified in the Wastewater Master Plan as requiring rehabilitation of the existing system or expansion to support growth and development. Revenue bond proceeds provide the financing for the expenditures of this fund. Restrictions: Funding provided by bond proceeds, including interest earnings, are restricted by the terms of the bond contract developed at the time of the bond sale. Wastewater Capital Fund Purpose: To account for the operation, construction, and maintenance of the City's wastewater collection system. Wastewater user fee collections provide the financing for the expenditures of this fund. Restrictions: As allowed under state statute, the proceeds of the user fees are retained in the fund for planning, constructing, maintaining and operating the wastewater collection system. Stormwater Capital Fund Purpose: To account for the operation, construction, and maintenance of the City's stormwater collection and treatment system. Stormwater user fee collections provide the financing for the expenditures of this fund. Restrictions: As allowed under state statute, the proceeds of the user fees are retained in the fund for planning, constructing, maintaining, and operating the stormwater collection and treatment system. SYSTEMS DEVELOPMENT CHARGE (SDCs) FUNDS ORS 223.297-223.314 provides the statewide framework guiding systems development charges. Expenditures of improvement SDCs are restricted by state law to capacity -enhancing projects for the system for which the fee is imposed. The reimbursement portion of SDCs may be used for capital projects related to the system for which the fee was collected, including rehabilitation of existing systems. FyAR1ed (W i_%1 PSg erp7htRro7am Page 14 Local Wastewater Systems Development Charge Reimbursement Capital Projects Fund Purpose: To account for available capacity within the existing wastewater collection system that is attributable to growth. Financing is provided by a SDC levied against developing properties. Restrictions: Wastewater Reimbursement SDCs are restricted for use capital maintenance or construction on the wastewater collection system. Local Wastewater Systems Development Charge Improvement Capital Projects Fund Purpose: To account for construction of the growth -related portion of capacity -enhancing capital projects. Financing is provided by a SDC levied against developing properties. Restrictions: Expenditures of Wastewater Improvement SDCs are restricted by state law to capacity - enhancing projects for the wastewater system. Stormwater Systems Development Reimbursement Capital Projects Fund Purpose: To account for available capacity within the existing stormwater system that is attributable to growth. Financing is provided by a SDC levied against developing properties. Restrictions: Stormwater Reimbursement SDCs are restricted for use on capital maintenance or construction on the stormwater collection system. Stormwater Systems Development Improvement Capital Projects Fund Purpose: To account for construction of the growth -related portion of capacity -enhancing capital projects. Financing is provided by a SDC levied against developing properties. Restrictions: Expenditures of Stormwater Improvement SDCs are restricted by state law to capacity - enhancing projects for the stormwater system. Transportation Systems Development Reimbursement Capital Projects Fund Purpose: To account for available capacity within the existing transportation system that is attributable to growth. Financing is provided by a SDC levied against developing properties. Restrictions: Transportation Reimbursement SDCs are restricted for use on capital maintenance or construction on the transportation system. Transportation Systems Development Improvement Capital Projects Fund Purpose: To account for construction of the growth -related portion of capacity -enhancing capital projects. Financing is provided by a SDC levied against developing properties. Restrictions: Expenditures of Transportation Improvement SDCs are restricted by state law to capacity - enhancing projects for the transportation systems. FYAR1edYW i_%1 PSgWrP@itRrO7am Page 15 EXTERNAL CONTRIBUTION FUNDS Community Development Block Grant (CDBG) Fund Purpose: To account for Federal grant revenues received for the primary purpose of advancing capital projects that primarily benefit low-income persons. Restrictions: CDBG funds, including interest earnings, must meet the Federal government criteria of benefiting low to moderate income individual's needs, eliminating slums and blight, and addressing urgent needs. Development Projects Fund Purpose: This fund accounts for funds donated by developers toward the construction of capital projects directly affected by the particular development. Restrictions: Funding is usually project specific and must only be spent towards those capital projects for which they were collected. Special Assessments Capital Project Fund Purpose: To account for the interim financing and related costs of construction for public improvements which primarily benefit adjacent property owners of the subject capital project. Revenues are generated through special assessments being levied against the benefiting properties. Restrictions: State law restricts assessments to the specific improvement constructed. Federal and State Aid Project Funds Purpose: To account for State and Federal grants awarded to the City for the purpose of preserving or enhancing City facilities. These funds are typically directed towards projects that preserve or enhance the City's transportation infrastructure. Following is a list of the typical sources: • STBG Funds — Surface Transportation Block Grant Funds • TA Funds—Transportation Alternatives Funds • CMAQ Funds — Congestion Mitigation Air Quality Funds • SRTS Funds — Safe Routes To Schools Funds • ARTS Funds — All Roads Transportation Safety Funds Restrictions: Funding is usually project specific and must only be spent towards those capital projects that meet the requirements of the specific grant. OTHER FUNDS Springfield Economic Development Agency (SEDA) Funds Purpose: To account for funds collected and set aside within Urban Renewal Districts as defined and adopted by the City Council. FYAR1edYW i_%1 PSgWrP9itRr07am Page 16 Restrictions: Funds collected within the specified Urban Renewal District and set aside for capital projects are restricted for use on capital projects benefiting the Urban Renewal District. Booth Kelly Fund Purpose: To account for revenues received from rents and leases at the Booth Kelly Center. These funds are set aside for Capital Improvement projects that improve the Booth Kelly Center. Building Preservation Fund Purpose: To account for funds collected and set aside for maintenance and improvements to City owned buildings and facilities. FYAR1edYW i-%1 PSgW2qitRrEWam Page 17 SECTION III FINANCIAL SUMMARIES 2023 TO 2027 SUMMARY OF PROPOSED REVENUES AND EXPENDITURES ($000s) REVENUE SOURCE FUND # BEGINNING BALANCE 20232024 REVENUE EXPEND REVENUE EXPEND 2025 REVENUE EXPEND 2026 REVENUE EXPEND 2027 REVENUE EXPEND TOTAL REVENUE EXPEND BALANCE CURRENT REVENUES BUILDING PRES. RESERVE 420 0 300 270 300 270 300 270 300 270 300 270 1,500 1,350 150 SDC (TRANS IMPROV) 434 2,303 600 295 600 295 600 295 600 295 600 295 5,303 1,475 3,828 SDC (TRANS REIMBUR) 434 144 30 150 30 50 30 110 30 50 30 50 294 410 -116 SDC (WASTEWATER IMPROV) 611 2,076 250 0 250 0 250 1,000 250 0 250 0 3,326 1,000 2,326 SDC (WASTEWATER REIMBUR) 611 4,609 600 250 600 250 600 250 600 500 600 0 7,609 1,250 6,359 SDC (STORM IMPROVEMENT) 617 1,533 200 30 200 0 200 0 200 42 200 433 2,533 505 2,028 SDC (STORM REIMBURSEMENT)6434 1,533 125 103 125 103 125 103 125 103 125 103 2,158 515 1,643 STORM CAPITAL 9,687 1,200 570 1,250 790 1,350 1,100 1,400 758 1,450 1,900 16,337 5,118 11,219 WASTEWATER CAPITAL 9,741 2,200 3,000 2,300 2,000 2,450 1,750 2,600 1,750 2,750 1,750 22,041 10,250 11,791 STREET CAPITAL Sub -totals: 1,447 33,073 150 5,6551 615 5,283 150 5,8051 200 3,958 150 6,055 551 5,429 150 6,255 200 3,968 150 6,455 200 5,001 2,197 63,298 1,766 23,639 431 39,659 GRANTS & DONATIONS ODOT* 420 0 12,000 12,000 0 0 0 0 12,000 12,000 0 FEDERAL GRANT* Sub -totals: 420 0 0 877 8771 3,589 3,589 0 0 0 or 4,466 4,466 0 12,877 12,877 0 0 3,589 3,589 0 0 0 0 16,466 16,466 0 Grand Totals 33,073 18,532 18,160 5,805 3,958 9,644 9,018 6,255 3,968 6,455 5,001 79,764 40,105 39,659 *These funds may not pass through the City's budget. **Proposed CDBG Capital Projects are identified in March. Therefore, Community Development Block Grant projects are not included. FYAR1ed FW i_%1 PSg e2gnbTro7am Page 18 SECTION IV PROJECTS SYSTEM PAGE UNDERSTANDING THE PROJECT PAGES.................................................................................. 20 STORMWATER Overview..................................................................................................................................... 21 FY20-FY22 Capital Project Update..............................................................................................22 FY23-FY27 Ongoing Programs.....................................................................................................24 FY23-FY27 Capital Projects..........................................................................................................28 Unfunded Priority Project List.....................................................................................................36 TRANSPORTATION Overview......................................................................... FY20-FY22 Capital Project Update .................................. FY23-FY27 Ongoing Programs ......................................... FY23-FY27 Capital Projects .............................................. Unfunded Priority Project List ......................................... WASTEWATER Overview...................................... FY20-FY22 Capital Project Update FY23-FY27 Ongoing Programs...... FY23-FY27 Capital Projects........... Unfunded Priority Project List...... BUILDINGS AND PROPERTY ................................................. 37 ................................................. 38 ................................................. 40 ................................................. 45 ................................................. 50 .........................................................................................52 .........................................................................................53 ......................................................................................... 54 ......................................................................................... 57 ......................................................................................... 60 Overview.....................................................................................................................................61 FY20-FY22 Capital Project Update..............................................................................................62 FY23-FY27 Ongoing Programs.....................................................................................................63 Unfunded Priority Project List.....................................................................................................64 FyAR1ed (W i—%1 PSgW2gntRr07am Page 19 UNDERSTANDING THE PROJECT PAGES Once projects are identified and selected for inclusion in the Capital Improvement Program, a project page is created for the project. The project page includes important information about a project such as: project description, relation to plans and policies, and status. This information is important for conveying and tracking details as each project moves from concept to construction. The following is a list and description of these elements: Prosect Description — This is a description or early scope for a project. Many times this description will be very broad as it may be taken from a master plan or refinement plan and most likely in conceptual form. The actual scope of a project is generally refined through the various phases of project planning, design and delivery. Project Status — Status describes the current stage of the Project, e.g. Planning, design, or construction. Specific Plans/Policies related to this Prosect — This is a list of the various Council Goals, master plans, refinement plans, adopted policies, and/or reports that relate to a project. Expenditure Schedule — Lists various project activities and estimates the timing and cost to accomplish the project activity. Funding Source — Describes how and when a project will/needs to be funded and the source of that funding (e.g., bonds, capital funds, SDCs, grants). FYAR1edYW i-%1 PSgW2qitRr07am Page 20 STORMWATER Overview Stormwater projects fall into several categories: Stormwater Studies — These projects typically fund the study of an area or basin to review current conditions and model future conditions to determine capital investment needs such as water quality facilities, repairs and upgrades, or system expansion. Stormwater Rehab/Improvements — These projects typically provide upgrades to the City's existing stormwater system or the removal of inactive or potentially unsafe storm lines. Projects may include the repair and upsizing of storm lines, or the addition of storm lines to reduce localized flooding and enhance system performance. Capacity Enhancement — These projects typically provide additional capacity to an existing stormwater system that is currently undersized or address capacity needs that have been identified to support future growth. These types of improvements may include an additional detention pond, detention facilities, offline water quality treatment facilities, or increased pipe capacity. Restoration and enhancement — These projects typically involve restoring or enhancing streams and waterways. Projects may include repairing channel deterioration, providing access for fish passage, removal of invasive plant species and enhancing native species, or improving flow capacity. New Facilities - These projects typically add new capacity to the system by constructing new stormwater facilities because of or in anticipation of new development, or permit requirements to expand treatment capacity. Projects may include storm lines or water quality facilities built as part of a new subdivision or identified in the Stormwater Master Plan. Projects may also include the extension of stormwater pipelines to support growth. FYAR1edYW i—%1 PagwNntRro7am Page 21 FY20-FY22 Capital Project Status Update - Stormwater FYAR1.qd(W i_%1 Pag e2iolblfro7am Page 22 In Project Previous Project FY22 Budget Total Cost to Project Title Number CIP Project Category Status ($ in Thousands) Complete Notes 5th St./EWEB Path Pipe Upgrade P21124 X Upgrades On -Hold $112 Booth Kelly Stormwater Drainage P50234 X Upgrades Not Started $150 Plan Implementation Irving Slough Improvements P21138 X Water Quality Not Started $785 2021 Maintenance Hole Rehab P21168 Repair and Design $75 Preservation Construction planned for FY22 Channel 6 Master Plan P41020 X Upgrades On -Hold $799 Implementation Stormwater Master Plan Update P41021 X Studies Not Started $0 Glenwood Stormwater Master Plan P41042 X Studies Planning $100 42nd Street Levee Study P41044 X Flood Control Planning $534 Receiving a State grant ($40,000) in FY22 Glenwood Park Blocks P41045 X Studies Not Started $50 Stormwater Repair P61002 X Repair and Ongoing $500 Preservation Program Channel Improvement P61004 X Water Quality Ongoing $1,092 Program MS4 Permit Implementation P61005 X Water Quality Ongoing $40 Program Riparian Land Management P61006 X Water Quality Ongoing $500 Program HOA Water Quality Facilities P61013 X Water Quality Ongoing $85 Program 2016 Manhole Surface Repair P21131 Repair and Completed $38,824 Preservation Constructed in FY20 Over -Under Emergency Repair P21163 Repair and Completed $121,243 Preservation Constructed in FY20 FYAR1.qd(W i_%1 Pag e2iolblfro7am Page 22 Stormwater Repair and Preservation Drainage Repair Department Development and Public Works Project Description: This program involves the rehabilitation of Springfield drainage systems; to repair or replace older pipe in the system and solve flooding problems and reduce street surface failures due to poor drainage. This program also includes rehabilitation of catch basins and culverts to prevent flooding, and the contractual cleaning of large storm sewer pipe. Potential projects include: Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Asset Management Program Natural Hazard Mitigation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $150 $150 $150 $150 $150 $750 Stormwater Reimbursement SDC $50 $50 $50 $50 $50 $250 Total $200 $200 $200 $200 $200 $1,000 FYARIedYW i-%1 PSgW2@itRr07am Page 23 Stormwater Water Quality Channel Improvement Department Development and Public Works Project Description: This project is intended to provide improvements to key drainage ways to address barriers to fish passage, and to correct previous channel modifications that have caused deterioration of flow capacity, water quality, and fish habitat functions. These improvements include culvert replacements or retrofits, road crossing and outfall modifications, and channel restoration. The adoption of the Springfield Total Maximum Daily Load Implementation Plan identifies an additional temperature benefit from channel restoration and shading. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Asset Management Program Natural Hazard Mitigation Plan Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $80 $80 $80 $80 $80 $400 Stormwater Reimbursement SDC $20 $20 $20 $20 $20 $100 Total $100 $100 $100 $100 $100 $500 FYAR1edYW i-%1 PSgW27htRr07am Page 24 Stormwater Water Quality MS4 Permit Requirements Department Development and Public Works Project Description: Develop and implement programs and projects to comply with the National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) Discharge requirements. In 2003, the City applied for an MS4 permit from the Oregon Department of Environmental Quality (DEQ), which authorizes the City to lawfully discharge stormwater to the McKenzie and Willamette Rivers and their tributaries. The Permit was renewed in 2021 and requires the City to implement programs and capital projects that improve stormwater quality. Data show that stormwater in Springfield waterways routinely violates water quality standards established to protect human health anc aquatic life. This project provides for minor capital improvements and/or capital equipment purchases necessary and appropriate to address high priority water quality problem areas. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $20 $20 $20 $20 $20 $100 Stormwater Reimbursement SDC $20 $20 $20 $20 $20 $100 Total $40 $40 $40 $40 $40 $200 FYAR1edYW i-%1 PSgW2@itRr07am Page 25 Stormwater Water Quality Riparian Land Management Department Development and Public Works Project Description: This project provides funding to purchase riparian area lands from private property owners where needed to meet City and regulatory objectives for water quality, stormwater management, flood control and habitat protection. It also provides funding for consultant services to evaluate riparian buffer areas, City and other activities affecting them. Property acquisitions will typically result in increased operational spending to maintain city owned property. Projects developed on property acquired may, however, produce savings through reduced spending for flood control, water quality improvement, and wetland mitigation activities. Project funding levels have been reduced to conform to eligibility levels for improvement SDCs. Council adoption and implementation of a reimbursement SDC may permit restoration of prior funding levels. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $15 $15 $15 $15 $15 $75 Stormwater Reimbursement SDC $13 $13 $13 $13 $13 $65 Total $28 $28 $28 $28 $28 $140 FYAR1edYW i-%1 PSgW29itRr07am Page 26 Stormwater Water Quality HOA Water Quality Facilities (WQF) Department Development and Public Works Project Description: There are approximately 40 WQFs in subdivisions that were built between 1993 and 2010 that are privately owned by HOAs or another private entity (individual residents, the original developer, etc.). The City has taken a progressively more active role in maintaining these facilities over the past five years. With the approval of Council in 2013, the City's Operations Division hires a temporary work crew each summer to manage vegetation in the facilities and ensure they are functioning properly. This capital program will begin setting aside funds to take over and bring into compliance selected privately owned water quality facilities. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $85 $85 $85 $85 $85 $425 Stormwater Reimbursement SDC Total $85 $85 $85 $85 $85 $425 FYAR1edYW i -%I PSgWf3@itRrEWam Page 27 Stormwater Expansion Glenwood Stormwater Planning/Implementation Department Development and Public Works Project Description: To improve the stormwater system including pipe and open channel improvements, for flood control and water quality improvements at various locations within Glenwood as identified in the Stormwater Facilities Master Plan (SWFMP), and to support implementation of the existing refinement plan for Glenwood. This project has involved evaluation of the Glenwood area and identification of new stormwater outfall locations and construction/enhancement of existing outfall structures to the Willamette River. Specific projects will be implemented as development occurs, consistent with the Public Facilities and Services Plan (PFSP). This project is moving into the next phase which involves preliminary design and initiating permitting activities to advance development. Project Status: Planning Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Total Maximum Daily Load (TMDL) Implementation Plan Glenwood Refinement Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $220 $220 Sormwater Improvement SDC $30 $30 Total $250 $0 $0 $0 $0 $250 FYAR1ed W i—%1 PSgWf3 JntRrO7am Page 28 Stormwater Repair and Preservation High Banks Road (42nd Street) Levee Department Development and Public Works Project Description: Conduct a study of the condition of the High Banks Road (42nd Street) Dike to identify any structural or non-structural deficiencies and to evaluate the potential for obtaining federal accreditation of this Dike as a flood control facility under the National Flood Insurance Program and for compliance with the National Levee Safety Program. FEMA conducted an initial study in 2018, and the City now needs to begin implementing the recommended upgrades and repairs, as well as conduct further investigation. The City will receive one State grant in FY22 to managed through Lane County for further study, and a second grant through the State in FY23. The second grant will be through American Recovery Plan Act (ARPA) funds. Project Status: Planning Specific Plans/Policies Related to this Project: National Levee Safety Program National Flood Insurance Program High Bank Road Dike Operation and Maintenance Agreement Natural Hazard Mitigation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total State Grant $100 $100 Total $100 $0 $0 $0 $0 $100 FYAR1edYW i_%I PSgWr3gntRr07am Page 29 Stormwater Repair and Preservation Irving Slough Headgate to Outfalls Department Development and Public Works Project Description: The project consists of open channel improvements in multiple locations for flood control and the construction of a stormwater storage facility. Water quality improvements will be incorporated into the project where applicable to meet regulatory requirements. The Stormceptor at Olympic Street will also be replaced. This project will be constructed as part of the N. 42nd Street Improvements Project Project Status: Not Started Specific Plans/Policies Related to this Project: Springfield Stormwater Management Plan Stormwater Master Plan DEQ Stormwater Discharge Permit Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $440 $750 $1,190 Sormwater Improvement SDC $0 Total $0 $440 $750 $0 $0 $1,190 FYAR1edYW i—%1 PSg ef39itRro7am Page 30 Stormwater Flood Control S. 67th Street Stormwater Improvements Department Development and Public Works Project Description: Pipe improvements for flood control. Currently, during heavy rainfall the storm system surcharges at 67th and Main Street flooding private property. Project Status: Not Started Specific Plans/Policies Related to this Project: Stormwater Master Plan DEQ Stormwater Discharge Permit Natural Hazard Mitigation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $408 $408 Sormwater Improvement SDC $42 $42 Total $0 $0 $0 $450 $0 $450 FYAR1edYW i-%1 Pagwf34tRrO7am Page 31 Stormwater Expansion Jasper-Natron Department Development and Public Works Project Description: The Jasper-Natron area requires comprehensive evaluation for future stormwater infrastructure needs to support future growth and meet the City's DEQ Stormwater Discharge Permit requirements. The first phase of the project will completing the analysis to develop a master plan for the basin, followed by implementation either by private developments, or City sponsored initiatives. The funding identified is for study and plan development. Project Status: Not Started Specific Plans/Policies Related to this Project: Stormwater Master Plan DEQ Stormwater Discharge Permit Natural Hazard Mitigation Plan Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $350 $350 Sormwater Improvement SDC $350 $350 Total $0 $0 $0 $0 $700 $700 FYAR1edYW i-%1 PSgWf3fftRrO7am Page 32 Stormwater Lower Mill Race Department Development and Public Works Water Quality Project Description: Design and construct a daylight or diversion pretreatment structure, an offline water quality treatment facility, and a green pipe open channel improvement. Additional detail for this multi -faceted project are in WQ-12 project of the Stormwater Facilities Master Plan. Project Status: Not Started Specific Plans/Policies Related to this Project: Stormwater Master Plan DEQ Stormwater Discharge Permit Natural Hazard Mitigation Plan Total Maximum Daily Load (TMDL) Implementation Plan Capital Costs ($ in thousands) Booth Kelly Stormwater Plan Stormwater Management Plan Mill Race Ecosystem Plan Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $500 $500 Sormwater Improvement SDC $73 $73 Total $0 $0 $0 $0 $573 $573 FYAR1edYW i_%1 PSgWf3@itRrO7am Page 33 Stormwater Studies Mill Race Firm Update Department Development and Public Works Project Description: Using consulting services, prepare a scope document for a new flood plain study to update the Flood Insurance Rate Map (FIRM) for the Springfield Mill Race from the inlet at Clearwater Park to the outlet at Island Park to incorporate construction changes. Project Status: Not Started Specific Plans/Policies Related to this Project: Natural Hazard Mitigation Plan Continued Participation in the National Flood Insurance Program Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $200 $200 Total $0 $0 $0 $0 $200 $200 FYAR1edYW i-%1 PSgW!37htRrO7am Page 34 Stormwater Studies Over -Under Channel Phase 2 Department Development and Public Works Project Description: The Over -Under Channel system has approximately 2,200 linear feet of woodstave pipe, and 1,000 linear feet of corrugated metal pipe (CMP) remaining under the existing channel. Phase 2 is intended to replace the existing woodstave and remaining CMP with a new pipe, as well as provide a parallel pipe for additional capacity as recommended in the 2008 Stormwater Facility Master Plan and the Over -Under Channel investigative report. The remaining pipe to be replaced runs from 10th Street east to 14th Street across Springfield School District property and Willamalane Park property. Project Status: Not Started Specific Plans/Policies Related to this Project: Stormwater Master Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Stormwater Capital $500 $500 Sormwater Improvement SDC $10 $10 Total $0 $0 $0 $0 $510 $510 FYAR1edYW i_%1 PSgWf3@itRr07am Page 35 Unfunded Projects List - Stormwater FYAR1ed (W i_%1 Pag e!391blfro7am Page 36 Project Estimated Funding Project Title Project Category Status Need Notes Gray Creek/72nd Street Expansion Not Programmed -Pending Funding $6,000,000 Construction of new channels and other improvements to accommodate runoff from future development Corporate Way Pond Studies Not Programmed -Pending Funding $250,000 Develop a vegatation management plan SWMP Project 43-WQ Cedar Creek Intake Reconstruction Water Quality Not Programmed -Pending Funding $1,000,000 Restoration work to improve and manage year round flow volumes North Willamette Heights Studies Not Programmed -Pending Funding $100,000 Develop a basin specific master plan to guied development and redevelopment Jasper Slough Restoration Not Programmed -Pending Funding $100,000 Culvert and open channel improvements along with riparian vegetation restoration This pipeline is located south of S. A Street and is complicated by the fact Woodstave Removal Upgrades Not Programmed -Pending Funding $750,000 portions of the line are under existing buildings and lack public access easements S and T Streets Drainage Upgrades Not Programmed -Pending Funding $750,000 Upgrade project to improve inadequate storm system and alleviate localized flooding. Reference Channel 6 Study and Master Plan -5 N. Gateway/Sports Way Channel Water Quality Not Programmed -Pending Funding $750,000 Construct a combination flood control/water quality facility adjacent to the Gateway Natural Resource area. Q Street Channel Water Quality Not Programmed -Pending Funding $750,000 Channel Repair, riparian enhancement and shading to address temperature issues in the TMDL. Maple Island Slough Studies Not Programmed -Pending Funding $650,000 Evaluate capacity needs to support developments and develop a vegetation management plan. FYAR1ed (W i_%1 Pag e!391blfro7am Page 36 TRANSPORTATION Overview Transportation projects fall into the categories noted below: Planning and Project Development — These projects range from larger facility planning, to concept project planning, to specific project development. Funding for these projects relies heavily on Federal and State funds, with City funds used to supplement project budgets and, in some cases, provide required match funding to external resources. Current examples of this in the CIP are Mill Street Reconstruction and Franklin Boulevard Phase 2 Improvements. Maintenance and Operations — These projects are typically programmatic and can provide funding for a range of activities within each project. Street Light Infill and Pole Replacement, Traffic Control Projects, and Intelligent Transportation System investments fall in to this category. Pavement Preservation — These projects are identified by the Operations Division through the Infrastructure Management System. Funding for these projects relies heavily on local and State fuel tax revenues and are supplemented with Transportation Reimbursements SDCs, and federal dollars programmed at the discretion of the Central Lane Metropolitan Planning organization (MPO). Examples of pavement preservation projects is the Street Seal and Overlay program identified in this CIP and the Street Bond preservation projects identified in the previous CIP and current Capital Budget. System Improvement, Existing — These projects typically either bring existing infrastructure up to the adopted urban standards, or make capacity and safety improvements to existing facilities. Funding for these projects rely on all available resources. A current example of these types of projects in the CIP is the Filling the Gaps — Safe Routes to Schools project. System Improvement, New Facilities — These projects typically add new infrastructure to the City's transportation system and are identified within the various planning documents. The trigger for these projects is driven mostly by growth and an identified future need to relieve stress on the system. Project funding relies on all available sources. FYAR1edYW i-%1 PSgW14@itRrEWam Page 37 FY20-FY22 Capital Project Status Update - Streets and Transportation FYAR1.gd W i_%1 PSgW144nbTro7am Page 38 In Total Cost to Project Previous Project FY22 Budget Complete Project Title Number CIP Project Category Status ($ in Thousands) ($ in Thousands) Notes Virginia/Daisy Bicycle Blvd. Construction of Phase 1 (42nd PI. to 51st PI.) P21114 X Safety Completed $1,406 Phase 1 improvements completed in FY21 Main St. Pedestrian Crossings Phase P21142 X Safety Completed $316 Final crossing location constructed in FY20 3 Filling the Gaps - Sidewalk Infill P21147 X Safety Design $225 Majority of funding received through State Project gants 14th St. and Commercial St. Overlays P21150 X Repair and Completed $335 Constructed in FY20 Preservation Centennial Blvd Overlay P21151 X Repair and Design $719 Construction planned for FY22 Preservation High Banks Rd./58th St./ Repair and P21152 X Construction $999 Active Construction with completion in FY22 Thurston Rd. Overlay Preservation S. 28th Street Paving P21155 X Upgrades Design $1,272 30% design review complete Mill Street Reconstruction P21156 x Repair and Planning $40 Consultant contract executed in FY22 Preservation Mohawk blvd./Olympic St. Overlay P21157 x Repair and Construction $0 Active Construction with completion in FY22 Preservation Virginia/Daisy Bicycle Blvd. P21159 X Safety On -Hold $604 Design is scheduled to begin in late FY22 Phase 2 - S. 42nd St. Roundabout G Street, 21st St., and 5th & M St. School crossing and ADA P21161 Safety Completed $335 Project was funded with federal CDBG funds and completed in FY21 Improvements 42nd St. Overlay P21162 X Repair and Completed $400 Constructed in FY22 Preservation Gateway/Kruse Improvements P21165 x Safety Design $0 Jasper Rd./Dondea RRFB P21167 Safety Design $0 Funded with Safe Routes To Schools (SRTS) and MPO grant funds City of Springfield Signal Funded with State All Roads Transportation P21173 Upgrades Design Enhancements Safety (ARTS) grant funds Jasper/Filbert RRFB Crossing P21174 Safety Design $0 Funded with Safe Routes To Schools (SRTS)grant funds Slurry Seal 2021 P21175 X Repair and Completed $350 Completed in FY22 in through and IGA with Preservation Lane County FYAR1.gd W i_%1 PSgW144nbTro7am Page 38 FY20-FY22 Capital Project Status Update - Streets and Transportation FYAR1.qd(W i_%1 Pagw149_nbTr07am Page 39 In Total Cost to Project Previous Project FY22 Budget Complete Project Title Number CIP Project Category Status ($ in Thousands) ($ in Thousands) Notes Virginia/Daisy Bicycle Blvd. P21114 X Safety Completed $1,406 Construction of Phase 1 (42nd PI. to 51st PI.) Phase 1 improvements completed in FY21 Franklin OR 225 P21176 Upgrades Planning $60 Recently funded through reallocation of MPO funds West D Street Improvements P41049 x Safety Design $39 Project identified and funded though the Walking -Biking Safety grant application Franklin Phase 2 Design P41058 x Upgrades Design $0 ADA Transition Projects P61003 X Upgrades Ongoing $50 Program Funds set aside to advance projects to Transportation Demand Ongoing P61007 X enhance non -auto travel links thoughout the Management Program City. Funds set aside to advance intersection Traffic Control Projects P61008 X Ongoing improvement projects. Example: S. 42nd Program St.\Daisy Intersection. Ongoing Funds set aside to advance project in the Gateway Area Traffic Improvements P61009 X Program Gateway area to increase capacity. FYAR1.qd(W i_%1 Pagw149_nbTr07am Page 39 Streets and Transportation Upgrades ADA Transition Projects Department Development and Public Works Project Description: The Americans with Disabilities Act of 1990 requires the City to maintain a "Transition Plan" that details how it will bring facilities that were not in compliance at the adoption of the act, up to the newly adopted standards. Currently, the City policy is to correct defects as projects occur and to make improvements as requests are received from citizens who make their need known. This project will set aside funds to be used for high priority locations that are identified, and will allow the City to respond in a timely manner to those requests. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield TSP Regulatory Requirements Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Street Capital $50 $50 $50 $50 $50 $250 Transportation Reimbursement SDC $50 $50 $50 $50 $50 $250 Total $100 $100 $100 $100 $100 $500 FYARIedYW i-%1 PSgWI49itRr07am Page 40 Streets and Transportation Upgrades Transportation Demand Management Department Development and Public Works Project Description: The project includes match funding for other transportation options projects to enhance non -auto travel links in the community such as Street multi -use paths, bike lane striping, enhancements to pedestrian facilities, and other activities that promote non -single auto travel choices. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield TSP TDM Goals State Legislation Regional Transportation Plan Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Transportation Improvement SDC $10 $10 $10 $10 $10 $50 Total $10 $10 $10 $10 $10 $50 FYAR1edYW i_%1 Pag a,44tRro7am Page 41 Streets and Transportation Upgrades Traffic Control Projects Department Development and Public Works Project Description: This project is for installation of new traffic signals and modification of existing signals or installation of roundabouts at various City intersections. Example intersections include: Thurston Rd. & 66th St., 42nd St. & Marcola Road, South 42nd & Daisy St., South 40th & Daisy St., 19th St. and Marcola Rd., and 28th St. & Centennial Blvd. Signal modifications may include changing phase order, adding overlaps, and other enhancements to safety or efficiency like improved pedestrian crossings. Various striping and signing improvements may also be implemented under the Traffic Control Projects. Funding is set aside in this program and as projects are identified that fit into this category they are given an individual account and at that time another source of funding will be identified to match the allowable SDC funds. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield TSP Regional Transportation Plan Council Policy Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Transportation Improvement SDC $35 $35 $35 $35 $35 $175 Total $35 $35 $35 $35 $35 $175 FYAR1edYW i-%1 PSrgel4fftRro7am Page 42 Streets and Transportation Upgrades Gateway Area Traffic Improvements Department Development and Public Works Project Description: Transportation improvements at various locations in the Gateway area to increase capacity, relieve congestion, and improve safety. Funding is set aside in this program and as projects are identified that fit into this category they are given an individual account and at that time another source of funding is identified to match the allowable SDC funds. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Springfield TSP Gateway Traffic Capacity Analysis Council Goals 1-5/Beltline Environmental Assessment Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Transportation Improvement SDC $225 $225 $225 $225 $225 $1,125 Total $225 $225 $225 $225 $225 $1,125 FYAR1edYW i-%1 PSrgW14@itRr07am Page 43 Streets and Transportation Upgrades Intelligent Transportation Systems (ITS) Department Development and Public Works Project Description: ITS projects in various locations to increase communications, capacity, safety and traveler information. Funding is set aside in this program and as projects are identified that fit into this category they are given an individual account and at that time another source of funding will be identified to match the allowable SDC funds. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Regional ITS Operations & Implementation Plan for Eugene -Springfield Metropolitan Area Springfield TSP Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Transportation Improvement SDC $25 $25 $25 $25 $25 $125 Total $25 $25 $25 $25 $25 $125 FYAR1edYW i_%1 PSrgW147htRr07am Page 44 Streets and Transportation Repair and Preservation Local/Residential Street Preservation and Maintenenace Department Development and Public Works Project Description: A continuing street maintenance preservation effort by slurry and crack sealing of Local/Residential Street System performed by contract. In order to maintain the City's local street system approximately 5 to 8 miles should be crack sealed and slurry sealed annually. Funds prgrammed fund an annual slurry seal project. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Infrastructure Management System Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Street Capital $150 $150 $150 $150 $150 $750 Total $150 $150 $150 $150 $150 $750 FYAR1edYW i-%1 PSgW14@itRr07am Page 45 Streets and Transportation Upgrades 42nd Street Operational, Safety, and Mobility Improvements Department Development and Public Works Project Description: Upgrade to address safety and operations, in particular for freight accessing the OR 126 Expressway -Freight Route and OR 1266 -Main St. Upgrade the UP rail crossing serving the International Paper, Sierra Pine, and Weyerhaeuser industrial center, upgrade intersection control at the westbound OR 126 ramp terminal, add urban level lighting, add ADA -accessible connections from Olympic St. and Industrial Ave. to the McKenzie Levee Path, add left turn bay on 42nd St. at Industrial Ave and improve traffic signals at the eastbound OR 126 ramp terminal, Olympic Street and the International Paper driveways. Project Status: Not Started Specific Plans/Policies Related to this Project: Springfield 2030 Infrastructure Management System Springfield TSP Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total State Funds Transfer $12,000 $12,000 Total $12,000 $0 $0 $0 $0 $12,000 FYAR1edYW i_%1 PSrgW14qitRr07am Page 46 Streets and Transportation Repair and Preservation Q Street Reconstruct - 5th to Pioneer Parkway East Department Development and Public Works Project Description: According to the most recent City of Springfield pavement condition index data, o Street between 5th and Pioneer Parkway East is in poor condition and requires reconstruction curb to curb. As part of the project all facilities such as ADA feature will be brought into compliance. Project Status: Not Started Specific Plans/Policies Related to this Project: Infrastructure Management System Springfield TSP Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Federal Aid Grant $637 $3,589 $4,226 Transportation Reimbursement SDC $73 $60 $133 Street Capital $351 $351 Total $710 $0 $4,000 $0 $0 $4,710 FYAR1edYW i-%1 PSgW!9@itRrEWam Page 47 Streets and Transportation Safety Virginia- Daisy Bikeway -- 32nd Street RRFB Department Development and Public Works Project Description: Design and construct a rapid rectangular flashing beacon (RRFB) crossing at the intersection of 32nd St and Virginia. This was a key safety element identified in the Virginia -Daisy Bikeway plan. Funding for this element was recently secured through reallocation of federal funds from another Springfield project. Project Status: Not Started Specific Plans/Policies Related to this Project: Springfield TSP Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Federal Aid Grant $240 $240 Transportation Reimbursement SDC $27 $27 Total $267 $0 $0 $0 $0 $267 FYARIed W i_%1 PSgW!q JntRrO7am Page 48 Streets and Transportation Repair and Preservation Aspen Street Improvements Department Development and Public Works Project Description: The City has negotiated jurisdictional os Aspen St. and Menlo Lp. Between Centennial Blvd. and Tamarack St. As part of the transfer agreement, the County is giving the City $415,000 to facilitate pavement improvments as well as facilities upgrades (e.g., sidewalks). Project Status: Not Started Specific Plans/Policies Related to this Project: Infrastructure Management System Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Street Capital $415 $415 $0 Total $415 $0 $0 $0 $0 $415 FYAR1edYW i—%1 PSgW!qgntRrO7am Page 49 Unfunded/Partial Funded Projects List - Streets and Transportation FYAR1.qd(FWi_%1 Pagw!9@1bTrO7am Page 50 Project Estimated Funding Project Title Project Category Status Need Notes Construction of Bicycle, pedestrian, and ADA improvements between S. Virginia -Daisy Bikeway Phase 3 Upgrades Not Programmed -Pending Funding $1,400,000 32nd Street and S. 42nd Street. Currently scoping for potential ARTS grant funding. Gateway-Beltline Intersection Upgrades Not Programmed -Pending Funding $20,000,000 Phase 2 improvements currently outlined in the Revised Environmental Improvements Assessment (REA) include construction of a couplet. $55,000 on an Signal System Mondernization Upgrades Not Programmed -Pending Funding annual basis Upgrade program to keep City traffic signals up to date on technology S. 48th Street connection - Main to Expansion Not Programmed -Pending Funding $927,000 Construction of this new road segment is delopment driven. Daisy Repair and $50,000 on an annual This City owns 14 bridges that are inspected on a biennial schedule by Bridge Preservation Not Programmed -Pending Funding ODOT. This program would facilitate completion of identified repair Preservation basis needs Downtown District Pedestrian Scale Upgrades Not Programmed -Pending Funding $7,600,000 Complete all downtown lighting upgrade phases. Lighting Arterial/Collector Street Preservation Repair and $1,000,000 on an A continuing street maintenance effort of pavement sealing and/or Program Preservation Not Programmed -Pending Funding annual Basis overlay of the Arterial/Collector Street System Street Light Infill & LPS Light Upgrades Not Programmed -Pending Funding $2,000,000 Replace 2,720 existing low pressure sodium (LPS) lights with LED Replacement/Upgrades technology and reduce energy costs. Arterial/Collector Street $1,000,000 on an Within the City's Street inventory, the condition of approximately 24 Reconstruction Program Restoration Not Programmed Pending Funding annual Basis miles of streets classified as a collector or arterial have deteriorated to the point that reconstruction of the structure is the only option Local/Residential Street $300,000 on an Within the City's Street inventory, the condition of approximately 68 Restoration Not Programmed -Pending Funding miles of local/residential streets has deteriorated to the point that Reconstruction annual basis reconstruction of the structure is the only option This project will upgrade the roundabout at Maple Island Road and Maple Island Improvements Upgrades Not Programmed -Pending Funding $2,000,000 International Way. It will also extend the Maple Island Loop Road to the north along the Maple Island Slough. Intelligent Lighting Controls Upgrades Not Programmed Pending Funding $700,000 An Intelligent lighting system will monitor street light performance, enhancing operations and maintenance The project will add lighting to Main Street from 20th to 72nd by placing Main Street Lighting Upgrades Not Programmed -Pending Funding $1,000,000 lights on existing poles where available and installing new poles where necessary Several crossings have been identified that would receive a safety benefit Pedestrian Crossing Enhancements Safety Not Programmed -Pending Funding $750,000 from the installation of a RRFB (Rectangular Rapid Flashing Beacon) or a PHB (Pedestrian Hybrid Beacon). Signal Communications Upgrades Not Programmed -Pending Funding $500,000 The project will evaluate central system software, fiber optic lines, wireless radio communication, and existing copper connections FYAR1.qd(FWi_%1 Pagw!9@1bTrO7am Page 50 Unfunded/Partial Funded Projects List - Streets and Transportation FYARIedYW i_%1 Pagw!94nbTrO7am Page 51 Project Estimated Funding Project Title Project Category Status Need Notes The project will complete required Federal National Environmental Policy Glenwood Riverfront Path Expansion Not Programmed -Pending Funding $1,000,000 Act (NEPA) documentation and approval for the new Glenwood Multi - Use Riverfront Path, including locating the path alignment along the Willamette River and completing pathway design Laura Street Upgrades Not Programmed -Pending Funding TBD Urban standards project in partnership with Lane Co. Construct Mississippi Ave roundabout and segment to just east of Franklin Blvd Phase 2 Not Programmed -Pending Funding Henderson Ave. Main Street Safety Project Phase 1 Not Programmed -Pending Funding $17,600,000 28th St Bike Lanes Not Programmed -Pending Funding TBD Currently scoping for potential ARTS grant funding 14th St Bikeway Not Programmed -Pending Funding TBD Currently scoping for potential ARTS grant funding E St Bikeway Not Programmed -Pending Funding TBD 48th Street / G Street / 52nd Street Path Not Programmed Pending Funding TBD McKenzie River Path Not Programmed -Pending Funding TBD FYARIedYW i_%1 Pagw!94nbTrO7am Page 51 WASTEWATER Overview Wastewater projects included in this CIP fall into two categories: Preservation and Rehabilitation —These projects typically involve upgrading the current wastewater system. Projects may include the rehabilitation of existing sanitary sewer lines, laterals and connections to reduce infiltration and inflow of groundwater into the system. New Facilities — These projects typically involve the construction of new wastewater facilities as a result, or in anticipation of new development. Projects may include sanitary sewer lines built as part of a new subdivision and extension of sanitary sewer trunk lines. FYARIedYW i_%1 Pggg eiSqiUfro7am Page 52 FY20-FY22 Capital Project Status Update - Wastewater FYAR1.9d(W i_%1 Pages%lblfro7am Page 53 In Total Cost to Project Previous Project FY22 Budget Complete Project Title Number CIP Project Category Status ($ in Thousands) ($ in Thousands) Notes Design is currently at 60%, Actively working Jasper Trunk -Phase 3 P21065 X Expansion Design $2,344 on wetlands mitigation plan 2016 Manhole Surface Repair P21131 Repair and Completed $39 Preservation Constructed in FY21 Project has been initiated to correspond S. 28th Sewer Extension P21166 X Expansion Design $1,200 with 28th Street CMAQ Paving. Construction planned for FY23 42nd 48th Sewer Rehabilitation P21170 x Repair and Design $1,500 Preservation Construction planned for FY23 Crest Lane Sewer Ext. P21171 Expansion Completed $44 Constructed in FY21. Example of Watewater Repair funds (P61001) utilized. Work on Phase 3 microbasin modeling Flow Monitoring Analysis &Plan P41041 X Studies Design $200 continues. Rehab projects have been identinfied and will be programmed in the CIP Request for proposals to be advertised in2nd Wastwater Master Plan P41062 X Studies Planning $500 qtr of FY22 Funds to be programmed to repair and CMOM Planning & Implementation P61000 X Repair and Ongoing $3,200 preservation projects identified through Preservation Program modeling Repair and Ongoing Funds programmed each year for Wastewater Repair P61001 X $500 Preservation Program unforeseen emergency repair work. Funds set aside to extend wastewater Local Sewer Extension P61013 X Expansion On -Hold $1,500 service to annexed area within the City that Pre not currently served. FYAR1.9d(W i_%1 Pages%lblfro7am Page 53 Wastewater Repair and Preservation Wastewater Repair Department Development and Public Works Project Description: This project involves the contracted repair or replacement of sanitary sewers that require either emergency rehabilitation as a result of Sanitary Sewer Overflows or the prospect of impending system failures. The DPW Operations Division addresses an average of four (4) emergency repairs of this nature annually. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Wastwater Master Plan CMOM Program Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital $250 $250 $250 $250 $250 $1,250 Wastewater Reimbursement SDC $250 $250 $250 $250 $250 $1,250 Total $500 $500 $500 $500 $500 $2,500 FYARIedYW i-%1 PSgW!97htRr07am Page 54 Wastewater Repair and Preservation CMOM Planning & Implementation Department Development and Public Works Project Description: The City of Springfield's obligations in the 2001 Wet Weather Flow Management Plan (WWFMP) were completed by January 2010; however it is necessary for the City to continue to fund wastewater system rehabilitation and Inflow and Infiltration (1/1) reduction projects. These additional projects will be identified through the Wastewater Master Plan Update project and the Capacity, Management, Operations and Maintenance (CMOM) program that will likely be included in the next NPDES permit for the wastewater system. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Wastwater Master Plan Regulatory Requirements Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital $250 $250 $1,000 $1,000 $1,000 $3,500 Total $250 $250 $1,000 $1,000 $1,000 $3,500 FYAR1edYW i-%1 PSgW!9@itRr07am Page 55 Wastewater Expansion Local Sewer Extensions Department Development and Public Works Project Description: Within the City of Springfield's city limits and Urban Growth Boundary (UGB) are several areas that are fully developed, but lack wastewater service. The project would fund extending wastewater pipes to these areas upon request of affected property owners or annexation, with some or all of the cost possibly reimbursable through assessments. Increased infrastructure will increase the need for more maintenance personnel which impacts the wastewater operations budget. The estimated increase in the wastewater operations cost is $1,600 per 1,000 feet of new pipe. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Wastwater Master Plan Council Goal to provide for development Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital $500 $500 $500 $500 $500 $2,50C Total $500 $500 $500 $500 $500 $2,50C FYAR1edYW i-%1 PSgW!99itRr07am Page 56 Wastewater Repair and Preservation 70th St Basin Rehab Department Development and Public Works Project Description: One of the key goals of the CMOM Program is to eliminate inflow and infiltration (1/1). Utilizing output from the flow monitoring and analysis work, it has been determined that wastewater pipelines serving the 70th Street Basin exhibit a high rate of 1/I, and thus is prioritized for a rehabilitation project. Project Status: Not Started Specific Plans/Policies Related to this Project: Wastwater Master Plan Council Goal to provide for development Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital $2,000 $2,000 Total $2,000 $0 $0 $0 $0 $2,000 FYARIedYW i-%1 PSgW@qitRrEWam Page 57 Wastewater Repair and Preservation 72nd St Basin Rehab Department Development and Public Works Project Description: One of the key goals of the CMOM Program is to eliminate inflow and infiltration (1/1). Utilizing output from the flow monitoring and analysis work, it has been determined that wastewater pipelines serving the 72nd Street Basin exhibit a high rate of 1/I, and thus is prioritized for a rehabilitation project. Project Status: Not Started Specific Plans/Policies Related to this Project: Wastwater Master Plan Council Goal to provide for development Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital $1,500 $1,500 Total $0 $1,500 $0 $0 $0 $1,500 FYARIed W i—%1 PSgW@ JntRr07am Page 58 Wastewater Expansion Harbor Drive Pump Station Department Development and Public Works Project Description: The S. 2nd St./Harbor Drive area is currently not have sanitary sewer service. The Council has directed staff to analyze areas within the UGB where investment in infrastructure may spur residential development, and investment in the Harbor Drive Pump Station provides a key service to 58 buildable acres. This project will construct a sanitary pump station and associated pipline to connect to the dry lines previously constructed. Project Status: Not Started Specific Plans/Policies Related to this Project: Wastwater Master Plan Council Goal to provide for development Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Wastewater Capital Wastewater Improvement SDC $1,000 $1,000 Total $0 $0 $1,000 $0 $0 $1,000 FYAR1edYW i—%1 PSgW@gntRrO7am Page 59 Unfunded Projects List - Watewater FYAR1.gd (W i_%1 PagwoolbTro7am Page 60 Estimated Funding Project Need Project Title Project Category Status ($ in thousands) Notes Replace a 12" pipe with a new 18" pipe. With model analysis this 19th Street Sewer Upgrade Upgrades Not Programmed -Pending Funding $1,500 upgrade may not be necessary. Will be evaluated with Master Plan Update Marcola Rd Sewer Expansion Not Programmed -Pending Funding $500 Provide sewer service to area within the UGB currently not annexed. Main Street Improvements - Unit 1 Expansion Not Programmed -Pending Funding $2,100 Upgrade pipeline capacity to support future growth in East Springfield Peacehealth-Riverbend PS Expansion Not Programmed -Pending Funding $3,189 New pump station to support development within the Riverbend campus. Main Street Improvements - Unit 2 Expansion Not Programmed -Pending Funding $1,145 Upgrade pipeline capacity to support future growth in East Springfield Upgrade existing pumps to maintain capacity and avoid potential SSOs. Hayden Lo PS Upgrades Not Programmed -Pending Funding $1,050 Project will be reevaluated as some work has been completed through routine maintenance. Upgrade existing pumps to maintain capacity and avoid potential SSOs. River Glen PS Upgrades Not Programmed -Pending Funding $950 Project will be reevaluated as some work has been completed through routine maintenance. FYAR1.gd (W i_%1 PagwoolbTro7am Page 60 BUILDINGS AND PROPERTY Overview The Buildings and Property section identifies and programs available funds for a variety of projects that may include construction of new facilities; maintenance, repair or renovation of existing facilities; and the demolition of unnecessary or un -maintainable facilities. As the City of Springfield grows, so does the need for municipal public services. These services come with an associated infrastructure that requires continual monitoring, maintenance, replacement and/or additions. Currently funding is only identified for one ongoing program which is the general ongoing Building Preservation program. Several other projects are identified in the Unfunded Priority Project List. On the overall buildings and Facilities needs list, there are projects at all City -owned buildings, including City Hall, Fire Stations, Museum, Justice Center, Depot, and Development and Public Works Operations Division Facilities. FyAR1ed (W i_%1 PagweAntRro7am Page 61 FY20-FY22 Capital Project Status Update - Building and Facilities FYAJtt&~fP,I "fir@7am Page 62 In Total Cost to Project Previous Project FY22 Budget Complete Project Title Number CIP Project Category Status ($ in Thousands) ($ in Thousands) Notes Program funds preservation and repairs of Building Preservation P61011 X Repair and Ongoing $306 City owned buildings. (e.g., City Hall Seismic Preservation Program upgrades) Booth Kelly Building Assessment P41029 X Studies Completed $39 Assessment is complete. City Staff will be reviewing and evaluating next steps. Booth Kelly Roof Replacement P21084 X Repair and Not Started $100 Preservation Booth Kelly Building Repair P21170 x Repair and Not Started $40 Preservation Existing oil/water separator replumbed to Fuel Facility Stormwater Upgrade P21121 x Upgrades Completed $37 connect to sanitary. Initial study has been completed in Firing Range Decommissioning P21075 X Water Quality On -Hold $25 coordination with DEQ FYAJtt&~fP,I "fir@7am Page 62 Buildings and Facilities Repair and Preservation Building Preservation Department Development and Public Works Project Description: Perform preservation, capital maintenance and repair projects on City -owned buildings, including but not limited to City Hall, 5 Fire Stations, Museum, Justice Center, Jail, Depot, Carter Building and Maintenance Facilities. Projects can include the repair, renovation or replacement of structural, mechanical, electrical, and plumbing systems. Other projects can include systems preservation such as, painting, roofing, lighting, alarm and elevator projects as well as repair and/or upgrades to aesthetic and architectural elements. Project Status: Ongoing Program Specific Plans/Policies Related to this Project: Council Goals Capital Costs ($ in thousands) Fund 2023 2024 2025 2026 2027 Total Building Preservation Fund $270 $270 $270 $270 $270 $1,350 Total $270 $270 $270 $270 $270 $1,350 FYARIedYW i_%1 PSgW@@itRr07am Page 63 Unfunded Projects List - Buildings and Facilities Project Title Project Category Project Status Estimated Funding Need Notes Municipal Parking Garage Expansion Not Programmed -Pending Funding $2,500,000 Initial design phase completed. Project on hold pending future Glenwood developments. City Storage Facility Expansion Not Programmed -Pending Funding $300,000 Library Expansion Not Programmed -Pending Funding $28,000,000 City Hall Renovation Upgrades Not Programmed -Pending Funding $4,000,000 Fire Station 4 Upgrades Not Programmed -Pending Funding $6,100,000 City Hall HVAC Upgrades Not Programmed -Pending Funding $1,800,000 Energy Efficiency Projects Upgrades Not Programmed -Pending Funding $200,000 Downtown Mill Plaza Design & Construction Expansion Not Programmed -Pending Funding $3,700,000 City Hall Storage Expansion Not Programmed -Pending Funding $100,000 Council Chambers Upgrades Upgrades Not Programmed Pending Funding $175,000 ARPA (American Recovery Plan Act) funds are a proposed source for moving this project forward. FYAR1ed (W i_%1 Pagwo7hbTro7am Page 64