Loading...
HomeMy WebLinkAboutApplication APPLICANT 12/29/2021',City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Minimum Development Standards (Minor) S kPRINGF11-10 Required Project Information (Applicant., complete this section) A licantName: A71(AIJ NZ)119 Phone: 141-(o$S X36 Company: J CtAW19T E uYc7RfC 5DA�-D E-mail: na: ✓t• :ce Address: Y cp /taoSYvCL-- BLVD, CULEAIL o¢.. gTy02 A licant's Rep.: Acsr- A?Pt (CA&LEPhone: Company: IE -mail: Address: Pro a Owner: -u w LATER- A Et'crrt'LX-A,LT> Phone:syl-bBs W.o Company: E'U E-mail• Address: LiZoo 4c6fivf Ll- C✓(7� £v LCNE. omit- -7r{0'L ASSESSOR'S MAP NO: - 1900 TAX LOT NOS : O3 00 Property Address: H IW fL\D(C- ILD IN FKU-) 0K, q7- Size of Property: 153 Acres X square Feet ❑ Description of If you are filling in this form by hand, please attach your proposal description to this application. Proposal: SEE E 7- 2 - UJC Existing Use: c r Cv- av1 -VW6- - r or cmal aCf>. Signatures: Please si nand rint our name and date in the a ro riate box on the next a e. Associated Cases: Case No.: Date: Reviewed by: Application Fee: Technical Fee: Posta a Fee: 0 TOTAL FEES: PROJECT NUMBER: Revised 5/21/13 KL 1 of 6 Signatures Plan The undersigned acknowledges that the information In this application is correct and accurate. ' LLI Date: Signature O Atyr,n1 eWtWl ll� Print If the applicant is not the owner, the owner hereby grants permission for the applicant to act in his/her behalf. Date: Signature requirements checklist. I certify that the plot plan Is accurate based upon field locates and the best available information. I understand that City staff will rely upon the plot plan In making any decisions regarding the Minimum Development Standards application. I accept full responsibility and liability in the event that there are any omissions, mistakes, or inaccuracies in the plot plan. Date: Plot Plan Preparer Signature Revised 5/21/13 KL 2 of 6 Minimum Development Standards Submittal Requirements Checklist ® Application Fee Applicant Response: $1,138 and intend to pay by Credit Card. ® Site Plan Review Minor Modification Application Form Applicant Response: A copy of the form is attached. ® Copy of the Deed Applicant Response: A copy of the deed is included as Attachment 1. ® State or Federal Permits Required Applicant Response: Not applicable. ® Narrative Applicant Response: The Eugene Water & Electric Board's (EWEB) Hayden Bridge Filtration Plant (plant) was first constructed in 1949 to provide drinking water to the City of Eugene. The plant was expanded in 1954, 1979 and again in 2009 to increase the treatment capacity of the plant to 80 million gallons a day. The source water is from the McKenzie River watershed which recently experienced a massive wildfire resulting in increased dosing of powder activated carbon (PAC) to resolve taste and odor concerns. The existing PAC loading process is manually intensive, requiring operators to lift tear, and dump 50 -pound sacks of PAC into a supply hatch. The process is extremely messy and operator safety is a concern. The intent of this project is to retrofit the existing PAC loading system with a safe, dust free, and automated bulk bag discharging system. The project will include the following: • Construction of a new 320 -square foot structure that will cover a bulk bag unloading system. See Attachment 2 for the proposed building use and Attachment 3 sheet Al, for the building area. • Mechanical work including new dust collection and exhaust systems. • Civil sitework including improved access, concrete surfaces for unloading bulk bags, earthwork for the new structure, drain lines to existing sludge pond drainage systems, and site restoration work as required. • Electrical and controls work. ® Four (4) Copies of of a Plot Plan Drawn to Scale and Incorporating the following MDS standards: ® A 5 -foot wide landscape planter strip Applicant Response: Not applicable - The area that is being developed is loft an existing lawn as shown on the drawings, sheet C1, and on the aerial photo of Attachment 4. A planter is not applicable because a lawn already surrounds the entire project site. ® Trash Receptacle Enclosure and Outdoor Storage Areas Applicant Response: Not applicable - There are existing trash and recycling bins located adjacent to the headhouse building. These bins are not visible beyond the property limits. ® Bicycle Parking Spaces Applicant Response: Not applicable - The project site is not open to the public. The plant has a 7 -person bike capacity bike rack and staff have lockable areas as needed for additional bike storage. ® Parking and Circulation Areas. Applicant Response: Not Applicable - the existing headhouse building has sufficient parking for all treatment plant staff and visitors. The new structure will cover treatment equipment. It is anticipated that no additional staff will be required. Setbacks from property lines are well beyond what is required for the Public Lands and Open Spaces Zoning District due to the large size of the site. Roof drains will be routed to a common drain pipe that will flow into an existing sludge pond containing treatment plant effluent water. ® Access to the public Right -of -Way Applicant Response: Not applicable - there is no work inside or near the public right of way. ® Concrete sidewalks Applicant Response: Existing sidewalks and new impervious surfaces are shown. There will not be any sidewalks or curbs near any City streets or right of way. ® Streetlight Locations Applicant Response: Not applicable - There are no city streets nearby. The existing building and proposed structure will have lights for nighttime operation as needed. ® Connection to Public Utilities Applicant Response: Not Applicable - There are no connections to public utilities or work within easements. All project work is limited to private utilities owned and maintained by EWEB. 2 oft Attachment 1— Deed xd.Ylv 73 s •� 'IN THE CIRCUIT COU$T OF TRE STATE OF ORLGONFOR LAjIE.:GOUNTY 2. . s ITY OF EUGENE, a'municipal corporation, 1 4 Plaintiff-) - s ps JUDGMENT e A. WEST JOHNSON and, ., ELIZABETH Y& X+ JOHNSON, Defendants 9 e • ' Is This matter coming on to be heard upon the motion of the It plaintiff for Judgment, and it appearing to the Court ` 12 That based upon the verdict of the Jury the plaintiff has is paid Into Court 02,500.00 ,in addition to the 422500,.00 hereto - 14 fore deposited in payment of the judgment upon the verdict - ,s of 44,500.00 damages assessed by the Jury, and the additional .L.r ,a sum of 4500.00 attorneys, fees, and has further deposited - 17 with the Clerk the am of 4100.00 to cover the costa and die- ' 4, is bureements of the defendants a.s they shall appear by the , ie Coat Bill when filed by the defendants. i. m 21 IT IS THEREFORE ,ADJUDOED that the plaintiff be aria it is 3 72 hereby given Judgment appropriating the lands o8 the, defendants .' - m described as follows:f.. h 24 Heijnning at a point 5.17 chains East and 8;63 chains ' North of the quartgr section corner Sactions 19 ' as .between and 30; Township 17 South Range '2 West_. of the Willamette . Meridian, Oregon, and .running thence kast,31,20.chalns ae to a atpne corner of County Survey #1271 on tha norther L7 _ line of the Southern raciflo,Railway Company right of a way, being.North:29° 30'.West.% 44 chains from -the corner `.: of Sections 19, 20, 29 and 30 of said Township; and >. 28 .running thence.'al6ng.the Northerly line of slid xlght. .of way North 630 451 East 4.10 chains more or'leea to , .. 29 the center line of.County Road #681, thence along the' - centerline of the County Roikd-North 29° 171 West 0.56 - *;,• chains;. thence` North_,13' 171- Neat 10.75 -chains, ..thence North 290 451 West -4.46 chainsto a atone corner.of :- County Survey #1.281, btling 5.06 chains West and 22.22 _ �ehains North' of, the corner of Sections 19, 20, 29 and .' 30� of gaid'Towpahip; thence along the middle of the ,101, P) r; 1 Count? RocQ, A West 11.66 8 •3' },� nsi A h.EB$....nha,A�f;.,�; fthence South 52,'; R'!+ 1Yrbt b,4 ': '.6 otiainal thdndd . v 3auth 10.41 ohrina to the place or beginning, contain- -- !,�„ f Ing, 51 acres of Many, more or .leas, irk Lune Conhty, 4 Oregon s and the plaintiff is hdreby declared to be the owner in See y� f simple.o£"aaid real estate. F 7 Td'HAVE AND TO HOLD the said real estate untq the 1 s plaintiri'.herein, its snce"sore'and assigns forever. i e, 4 If Dated, fiugene 'Oregon, March 12 AT - -OM, 'CLOCK-___. fa ^ ',✓/ './ ; MAR 2 01947 6/ IA• W 0 DILLARD •-judge WVTT IB 17 19 M.5 �W .21 22 a• . . 25 26 27 if 1 � M T_.3� .. ,,.., v......, ..., .+ .. �... L. ..., ... Attachment 2 — Building Use August 13, 2021 mwaarchitects SAN FRANCISCO OAKLAND PORTLAND Attn: Nathan Endicott RE: EW EB— Hayden Bridge Filtration Plant Carbon System To whom it may concern; OSSC Section 306, Factory Group F1 is the closest occupancy with electronics and machinery listed as the nearest categories to the proposed Carbon Building. While carbon dust can be combustible, it becomes potentially airborne only when loading and when traveling from the bulk loader to the storage silo. The loading room is ventilated to prevent dust concentration. The screw conveyor is a closed system which will not contribute to dust exposure. Table 307.1 allows discretion per note q and Section 414.1.3 that unless hazardous conditions are created, the allowed quantities aren't limited. With the proposed ventilation and closed system we believe that no hazardous conditions will exist. In this case, the anticipated quantities are 2 pallets (or 4,000 Its.) delivered 2 weeks apart and only during the wet season. • NFPA 820 Table D.1.1 Material -Activated Carbon item lists it as combustible, but intrinsically not classified per NEC and NR (no requirement) for ventilation and fire protection. • NFPA 70, Article 500 on classifications describes (in the paragraph on Class II, Division 2) locations conditions where under abnormal operations there may be quantities in the air which could be hazardous. With the nature of the carbon, the quantities, the proposed use, the ventilation and closed system delivery, that this building doesn't warrant any classification. We believe the system, as designed, complies with OSSC section 306 for F1 occupancy and that with the proposed mechanical system, this is electrically a non- classified facility. Yours, David Williams, AIA 7U N W COUCH STREET I SUITE 901 PORTLAND, OR 97209 P 503 973 5151 F 503 973 SOSO MWAARCHITECTS.CDM Attachment 3 — Drawings 'I EUGENE WATER & ELECTRIC BOARD I9 E1IGENE LOCATION MAP I EUGENE, OREGON HAYDEN BRIDGE FILTRATION PLANT POWDER ACTIVATED CARBON SYSTEM RETROFIT EW EB PROJECT 2003344 SHIP NGF EL // VICINITY MAP HAYD' N BRIDGE---_' / WATER FILTRATION PLANT INDEX OF DRAWINGS 01FEES SHEET, LOCATION MAP & INDEX OF DRAWINGS G2 SITE PLAN. LEGEND & ABBREVIATIONS Al OODE SHEET AS ARCHITECTURAL DETAILS C1 EXISTING/PROPOSED SIZE PLAN C2 UNDERGROUND UTILITY PLAN M1 FLOOR PLAN & ELEVATION M2 EQUIPMENT SECTIONS & DETAILS M3 CONVEYOR PLAN & SECTION 51 GENERAL STRUCTURAL NOTES S2/S3 QUALITY ASSURANCE PLAN AND SPECIAL INSPECTION TABLES S4 BUILDING PLAN 55 ROOF FRAMING AND FOUNDATION PLAN Sfi A,OIFONAL SECTIONS 57 STRUCTURAL DETAILS Ell PRE -RETROFIT ELECTRICAL PLAN E12 ELECTRICAL. DEMOLITION PLAN E15 LOWER LEVEL ELECTRICAL PLAN E16 UPPER LEVEL ELECTRICAL PLAN E17 FEEDER BLDG. UGHTING PLAN N OF 2) E18 FEEDER BLDG. LIGHTING PLAN (2 OF 2) E10 LOADING BLDG. LIGHTING PLAN E20 FEEDER BLDG. LOWER LEVEL ELEVATORS E21OTHER ELEVATIONS E25 EXTERNAL ELEVATIONS E400 PRE -RETROFIT ONE -LINE DIAGRAM E401ONE-LINE DIAGRAM DEMOLITION E402 ONE -LINE DIAGRAM PROPOSED E500 PRE -RETROFIT PANEL CBI SCHEDULE E501 PRE -RETROFIT PANEL CBS SCHEDULE E502 PANEL CB1 SCHEDULE, PROPOSED E503 PANEL CBS SCHEDULE, PROPOSED E510 POWER, CONDUIT AND CONDUCTOR SCHEDULE E511 CONTROLS. CONDUIT AND CONDUCTOR SCHEDULE WATER SYSTEMS HAYDEN BRIDGE FILTRATION PLANT E TIPOWDER ACTIVATED CARBON SYSTEM RETROFIT TLE SHEET, LOCATION MAP & INDEX OF DRAW IN1 IN OVERALL SITE PLAN ITS 11 CONTRACT A "ALL I A ly IRLY 111, IIINDIDARN IS I III 1PRINIR FINT IF ALL PASIND "IF' Al � 1111TIENI "IF' I "I 19DIIIII OR 1A5- IR IFIf GENERALNOTES D "I 'IN TDO REQ- FONTRACTIR TO FOLLOA DID R AGO ED By FE AR.PUI L 11 ''1 NO HAITI 'ENTER 5� FOR F IN OAP N25 AR -90" 'ALL -SNP­ TO "I ly -t ITS TO AT YEANT 2 SURN 35 DAYS ITT NFT MORE FAR C ENSURE FAIN IN ONE -1IItNIN1 11 EX- FAR PLAN FDAPLETE FIVATE IN IN' IF APPRIK 'AN ALL DEEP TARRICHER 'HIT RE SAIINLED Pill NEI AT FELT POINT' NEI D 0 -ER PEAR PIPING AND EQUIPMENT DESIGNATIONS S.I. COT AN --SECTION OES.Andi ---FPINC SI SM150L ORAMNC M1 AOXPMNCTM LIST j T"SSEE 8 FW ORAMNG E SEC➢ON APPEARS R -SENT.. OESIGNPnON NEW PIPING - ON D. Mz T"IS .�� AS: T NEW EWPMENT �. i SIGGINaN` S TAS." o DETAILS ARE CR05S REFESENCEO IN A SIMILAR IJ... MANNER E%CEYT 05 NG LETTERS. - __ EWIPMEIT NUMBER VI man LY , RATIN PREFER- VALVE s INPUT rERR PRIMARY AREA CREEP E NEI Lf WdMPLO ,,�IPEEI ` IT I'D, iso l en . -111I FERRY r, PLANNED nADEFEETOR L IT RL IATTE OVERALL SITE PLAN ITS 11 CONTRACT A "ALL I A ly IRLY 111, IIINDIDARN IS I III 1PRINIR FINT IF ALL PASIND "IF' Al � 1111TIENI "IF' I "I 19DIIIII OR 1A5- IR IFIf GENERALNOTES D "I 'IN TDO REQ- FONTRACTIR TO FOLLOA DID R AGO ED By FE AR.PUI L 11 ''1 NO HAITI 'ENTER 5� FOR F IN OAP N25 AR -90" 'ALL -SNP­ TO "I ly -t ITS TO AT YEANT 2 SURN 35 DAYS ITT NFT MORE FAR C ENSURE FAIN IN ONE -1IItNIN1 11 EX- FAR PLAN FDAPLETE FIVATE IN IN' IF APPRIK 'AN ALL DEEP TARRICHER 'HIT RE SAIINLED Pill NEI AT FELT POINT' NEI D 0 -ER PEAR SECTION AND DE FAIL OESIGNATONS PIPING AND EQUIPMENT DESIGNATIONS S.I. COT AN --SECTION OES.Andi ---FPINC SI SM150L ORAMNC M1 AOXPMNCTM LIST j T"SSEE 8 FW ORAMNG E SEC➢ON APPEARS R -SENT.. OESIGNPnON NEW PIPING - ON D. Mz T"IS .�� AS: T NEW EWPMENT �. i SIGGINaN` S TAS." o DETAILS ARE CR05S REFESENCEO IN A SIMILAR IJ... MANNER E%CEYT 05 NG LETTERS. - __ EWIPMEIT NUMBER man LY RATIN PREFER- VALVE INPUT rERR CREEP E NEI ll ,,�IPEEI IT en . -111I FERRY r, PLANNED nADEFEETOR RL IATTE 11 A VANw A, ALI CADS , TITLE IALIE NEI "I PIPA RATE "IT INTEN . RELY NEI EUNPR 11 IHEIN FOR ��wT RAFTE L s E - cMF� xmeRem Gaox 1. INFFN-E "ASH A- PIT - ISINFU n E m[moaLGIT _1AIRT F Lt�uwo nes ux -AINI1NI.F1 SECTION AND DE FAIL OESIGNATONS PIPING AND EQUIPMENT DESIGNATIONS S.I. COT AN --SECTION OES.Andi ---FPINC SI SM150L ORAMNC M1 AOXPMNCTM LIST j T"SSEE 8 FW ORAMNG E SEC➢ON APPEARS PIPE 4EE -SENT.. OESIGNPnON NEW PIPING - ON D. Mz T"IS SECTION IS IGEN RE. AS: T NEW EWPMENT �. - W SIGGINaN` S TAS." o DETAILS ARE CR05S REFESENCEO IN A SIMILAR IJ... MANNER E%CEYT 05 NG LETTERS. - __ EWIPMEIT NUMBER 6��V" �""•Ri WATER SYSTEMS I q�``�/♦\� FR12.1 1 SO HAYDEN BRIDGE FILTRATION PIANT " Ne A E ♦ ♦ L✓ I- ...,:. POWDER ACTNATEDND& A SYSTEM RET20FIT D-3 2 8 SITE PLAN, LEGEND & ARBREVIATIONS D-3'. 1W W ENTI� 6 FRAME 4NNOOW JAMBI 56P{Tp FRO'Ebi W EN0 0 MM OWBI£ A,., WATER SYSTEMS HAYDEN BRIDGE FILTRATION PLANT POWDER ACTIVATED CARBON SYSTEM RETROFIT ARCHITECTURAL DETAILS y 0' -HOLLOW NEtAL WNOOWS i,,.,° PNO HEAOEPB NIM B' 4-0 '�[-0' J'-0' B/. CUIG E W E B 80% BEAME D -3830)-A2 - 11 11 \ Xo6vmsvaur `INSTALL DRIP MORE SEN caL 0 1 METAL f AHI O m 1 51� - MlL 401HG -- u M BEHIND NR. SDIND BOX R BDIHG 5/6" HAT CHANA ®20'OC iW 8004 -H.n0 EAST ELEVATION /, ;. CMV OOCFC'[ DETAIL e CARBON BUILDING CORNER & JUMB DETAILSN77M - --- \ RrANmaG SEAM Nn \ _ 12 ROD, i j I % '-uE L (Prne) soFar L}/e' HAT OHANNELB 0 a' oc }/A' HAT CHANNELB O 24. OC BDOSICO-1f8 W METAL �INOI O 4l" OC BOX RIB METAL BEING p'G M,=CT ANLEONS D �. �-owP nawlrvG DETAILeN CARBON BUILDING WALL SECTION SAM MR ROD INSULATON -CRON 90ARDS FE. ---- HI -TEMP SAM -" --I- 1OLn50 TIED WILL }/B' PHOIECPON BOAPOS EOri f1A PACNN� K EDGE I FASCIA MBHINC fABCIA WP 11- NTS BMFlT RIM NORE DETAIL( CARBON BUILDING ROOF SECTION DETAIL eQ CARBON BUILDING RAKE DETAIL D TAI eCARBON BUILDING RIDGE DETAIL 56P{Tp FRO'Ebi W EN0 0 U. WATER SYSTEMS HAYDEN BRIDGE FILTRATION PLANT POWDER ACTIVATED CARBON SYSTEM RETROFIT ARCHITECTURAL DETAILS i,,.,° E W E B .�:y" D -3830)-A2 - 11 11 PLAN - EXISTING PLAN - PROPOSED e .\498 pp� 'VTj 'y - WATER SYSTEMS HAYDEN BRIDGE FILTRATION PLANT POWDER ACTIVATED CARBON SYSTEM RETROFIT SITE PLAN iooa uxmeo mloelii i EWA E B m�D-38300-C1 PLAN - PROPOSED UNDER.CROUND_ UTILITIES USWEO GRAVEL CLIFF FERE FIRE TO EX IND 2N' ADDED FIN SHED GRACE 0 SEC C)TYPICAL TRENCH & PIPE DETAIL e STANDARD CLEANOUT (COI oar xasonoaarrox ..< .1 PROTECT ]' COPPER MTH STRUT ALONG ND, LJuaTI Cf WALL— _ CORE ENACTOR SHALL ME 1/Y UPCFR DR.PI PIPE OIAREIEN� E%ISTING BUILDING �C) n uL CONCRETE SLAB PROPOSED ADDN ON PLAN - PROPOSED ABOVE GRADE UTILITIES INSTALL RE AT EASRNC S COPPER PIPE _ SHEET NOTES 1, HIRATED YLIIIIIf/FIfIIIi�I(liI{�� 2. ENDS BE of PDOR TO CONST -ON OF GATTI "I ��ILIFTL 11 PIP ING PENDING CODE MAD 100 -IND ,�RPGNTM GI THE CONTRACTOR CDALL CAL OR TE INTO OF STRE WAE PIPE MATERIAL TO K 30FRE IND EST I�EIC 8 - DRAIN PIPE 0 PIPE -DECLARE I IL 1-1 —fT4 L— YLIIIIIf/FIfIIIi�I(liI{�� 2. BE of TE INTO OF STRE WAE ERIC AT EpSTNG PIPE ENTRY ENTRY —fT4 E45TNO FREE IXPi IS TO 9E AnwNG FRE T AN TMTIE-IN DE�eTEE CONNECTION DETl�ILeK ISO - ONE -LINE PIPING DIAGRAM n^s WATER SYSTEMS HAYDEN BRIDGE FILTRATION PVA.NT POWDER ACTIVATED CARBON SYSTEM RETROFIT e c° EW UTILITY PIAN __. D -38300-C2 a yy / \I GRADE SPEAK _ o I rn. n I Y (]) PGCS IFEMOSAM POUMRD, _ 1-CDECTEAD. COL UP SEE SHTHE TO DWfl CNPN OPERATOR NIS ENE .). msuLL BIeRN nos -PROPOSED PRLVDBED / �PERMA MENEN �SSTE£L ONE" AND CD CRETE — SULK B D, Q{ / UNEAR P ENCY ANNA E R T IMI 5LP5 UNLDADER ry / M' CLUB DEALL DI SFE SPEGEEMOREI PACES E BUILDING TOWARD WE DRAINS PING BRAIN HER HVAC Bql / OUTLETS TO CW MINI a Y oxax PIPING , ^ ED EG� ED 1/Y'iRE%IBfE STAR OR GE W/ 15 WT EXPANSION GENT HBO., CAN NOTTERELT N]TALL S -1G 1/6" ELLEN NORTH OF CENTER ONE. TOOLED IDETAILe FLOOR PLAN LOWER LEVEL P NELSSEEEAI RMF PANELS. INSTALL NEW GUTTER S AMID DOWNSPOUT. MUM NOW FEW OMAN PPE AS % SHEET NOTESANN 10% Mrv. W. FROM CONTRACTOR STALL REPLACE �EXTROCING OWNSPWT TO COMMON DRAIN PIPE \ ~I� ALAN AT NSA INSISTED ALAN A I ME 'I IC I oOR (aPPRGv) URGE LGCNAA IN I� HATILI �i NNRi-XnwusD 'FRE<Al NON INSIILATFD / DECSCE CHUNIANCE "N ARBON CA N BOX DIB METAL WALL II WRILM SEE .WEEi NOIEM A AND"S A DETAILS CV -R PER HARDWARE 5 ECIFlWTDN ^ L ILI T A ` A - E" ABC Aaraorn EXCAVAR HER 4 - AT BASE BE ELL I "IN' MR I EL ARE BASED ON OUOAA IG --- epACK mEM O C, v. AND INFlLL mRl ITEM f p F1FxIeLE 1/ • FORE5, AT 2:1 NAM L - CMU M.G. BLGES AN9CN --I- ". TYPE AND SZE Tw. JUICNT EVER rI SNAIL MATVI ( IICNO ALL WATER SYSTEMS° CAR AT DIS, HIT FRONT -I� < WENS NA" \ SURFACES. ] WALL PENES T HAYDEN BRIDGE FILTRATION PLANT 1-11 FIT, RE R NEWON W / -NN1RAGi0R SHALL WXIRACiCR SHALL _. SIT CONSTRUCT A ]'-D" P REPLACE E%SCND _ _ TS ER WTI CRAY OH '_ LEAASSING 2 r.EWEB MRDN. WRESEN SLOPE AS WRI K-1 y FLOOR PLAN MERR5TO TD eu LDING _ ER CONCREAL TO OLD R—",- 1- - T %//-//' p .,... MINIMUM I S ARCO 11 LENCLETE T gGPE AS 3 Nr 3 "'E'Ll"I'All WNIRAG. MALL FINJURED - MM EMDYE AND REPLACE TOMAIN 5 - AT ON THEN SEE NO AND /� DENCE FOR CGNt2YM IPGIALL DETAIL M-I AmfR. 6-I PER XVAC SCT. ` Q MIA :LL PENETRATGN iflEGU PEG F s q'NNEWA ELI GTE BAR - - - yy / \I GRADE SPEAK _ o I rn. n I Y (]) PGCS IFEMOSAM POUMRD, _ 1-CDECTEAD. COL UP SEE SHTHE TO DWfl CNPN OPERATOR NIS ENE .). msuLL BIeRN nos -PROPOSED PRLVDBED / �PERMA MENEN �SSTE£L ONE" AND CD CRETE — SULK B D, Q{ / UNEAR P ENCY ANNA E R T IMI 5LP5 UNLDADER ry / M' CLUB DEALL DI SFE SPEGEEMOREI PACES E BUILDING TOWARD WE DRAINS PING BRAIN HER HVAC Bql / OUTLETS TO CW MINI a Y oxax PIPING , ^ ED EG� ED 1/Y'iRE%IBfE STAR OR GE W/ 15 WT EXPANSION GENT HBO., CAN NOTTERELT N]TALL S -1G 1/6" ELLEN NORTH OF CENTER ONE. TOOLED IDETAILe FLOOR PLAN LOWER LEVEL SECTIONe4 FLOOR PLAN UPPER LEVEL 1) -- P NELSSEEEAI RMF PANELS. INSTALL NEW GUTTER S AMID DOWNSPOUT. MUM NOW FEW OMAN PPE AS % SHEET NOTESANN 10% Mrv. W. FROM OWNSPWT TO COMMON DRAIN PIPE \ ~I� ALAN AT NSA INSISTED ALAN A I ME 'I IC I oOR (aPPRGv) I� HATILI �i NNRi-XnwusD 'FRE<Al NON INSIILATFD / DECSCE CA N BOX DIB METAL WALL II WRILM SEE .WEEi NOIEM A AND"S A DETAILS CV -R PER 'ETA BILL PAN— A' IMIREI TO ME I A NVAC]CX. -I --L_ - L ILI FROM NEW RARE DRAIN PIPE. IMI IN' II-' ROD ID' MIX W/ % IH MLP FROM BIDDING - E" ABC Aaraorn EXCAVAR HER AT BASE BE ELL I "IN' MR I EL ARE BASED ON OUOAA IG --- WIN.. ... O z ]/C MINUS CRUSXFD _-_ A. ueuaws FORE5, AT 2:1 NAM L - wE,MOMFATELr cuT WENmG Irvro TW"F6 ONTO c Coq. COMPLETELY SEAL W/ CARVER. I/, _ I. Tw. WATER SYSTEMS° CAR AT DIS, HIT ISM RbAICE WHY 'IT' III IT INED 11 ME STRUCULAIL ORRAWNES AND El HAYDEN BRIDGE FILTRATION PLANT 1-11 FIT, / -NN1RAGi0R SHALL WXIRACiCR SHALL _. CEFORCH I ' CONSTRUCT A ]'-D" P REPLACE E%SCND _ TS ER WTI CRAY CONCRETE CLiiEx AND DVSs COIIECipt 2 r.EWEB MRDN. WRESEN SLOPE AS WRI K-1 y FLOOR PLAN MERR5TO TD w Eeo``x ER CONCREAL TO OLD MAN TO FASTNG T %//-//' p .,... AY "'IN' a r USAGE DE AN USAGE OF S ARCO 11 LENCLETE T 3 Nr 3 "'E'Ll"I'All WNIRAG. MALL NM - MM EMDYE AND REPLACE ( - D WAG EXHAUST BUD -- AND /� IPGIALL M-I AmfR. 6-I PER XVAC SCT. ` Q MIA R 130 s a SMARM NOTED GOLD JOINT - - WETNESS E COT.. AC ANT NEW CONCRETE. BONTPACTDP SHALL RESTORE WTI _y - HDi MIX AC BETWEEN NEW WNCRET_ AND -- - -- --- EX6TNC AG. SECTIONe4 FLOOR PLAN UPPER LEVEL 1) -- P NELSSEEEAI RMF PANELS. INSTALL NEW GUTTER S AMID DOWNSPOUT. MUM NOW FEW OMAN PPE AS % 10% Mrv. W. FROM OWNSPWT TO COMMON DRAIN PIPE \ ~I� oOR (aPPRGv) I� �i NNRi-XnwusD 'FRE<Al NON INSIILATFD / DECSCE CA N BOX DIB METAL WALL II WRILM SEE .WEEi NOIEM A AND"S A DETAILS CV -R PER NVAC]CX. -I --L_ - L FROM NEW RARE DRAIN PIPE. ID' MIX W/ % IH MLP FROM BIDDING ID GVMMM SPAIN FIOWNMPWT IL EXCAVAR HER AT BASE BE ELL OUOAA IG --- WIN.. ... O z ]/C MINUS CRUSXFD M. RACXFILL NL / \G"-TI'=0" -_.-_ FORE5, AT 2:1 NAM L - wE,MOMFATELr cuT WENmG Irvro TW"F6 CDMPAGTED CAP BE DOWNSPOUT D ELEVATION COMPLETELY SEAL W/ CARVER. I/, _ I. Tw. WATER SYSTEMS° CAR AT DIS, HIT emm/ HAYDEN BRIDGE FILTRATION PLANT 1-11 FIT, _. POWDER ACTIVATED CARBON SYSTEM RETROFIT 2 r.EWEB FLOOR PLAN D-38300 1 w Eeo``x _ y .,... Nr Au AOLATW BE es PROK EACH AILD A r OALAANIH FREE AND AND PROF NNE COST KK eaa "= CCLLN TYPE ECF BALK AND MATA SHALL DE ME AS RECOMMENDEDRE REPLACE E%PNG DUS!LDUErngR _-- F COST NE RU AND REPAIR ROW FOR EA APPAROARAL _ ' ER T 01 AS REWIRED TO AEA ARWNOOPENING, POWDERACTIVATEDCARBON SYSTEM RETROFITF1 SUBMIT PETAL FOR TNNER EvEW OH UA - EQUIPMENT SECTIONS & DETAILS D-3830G- I Ll - \ PEPLACE "SEND PIPING C" PI"C"S PIPE TYPE AN. UAFFERXI �RIALL ST AA FECV E DED RE ..91A /RE // /Doo / E DUSTCCMECTUN M IJ1UFgCNRE. SUBMIT PER CANER LL– /TFACNF BIBLEINSTALLA OUST DRDRAFT5""NOM To CWPlW SEAL RLL SIDES C£ ME EX ENG PATCH OPENING OWNER RENEW AND A IFPROWL IS REWIP£R, TOP PA �I SICU ��-CONNECTOR NDINWALL REMOVE MACE CONNECTOR AND I ORS I/1'X! $i ` EPoM CASKET,IIP EA SILO. ON A FEEDERS R� DECODER ARE AN EXACT MATCH M EX SOL SECTIONe3 CARBON FEEDER & PIPING a LL I'LLAR au T NE,axaCI i I INTERICFU EXiERIDR EXHAUST FAN MPAEO FROM INTERIOR EXHAUST PIPE 0W SECTION e EXHAUST FAN EDITION 'A, EXIEFROR —INTERIOR E.EC?12eWALL LOUVER BE M 'I'S AD AS REAIIllIj A By IF- PANITANUTEA DETAILeB WALL PENETRATION NPA BE A r OALAANIH FREE AND WATER SYSTEMS SECTIONe3 CARBON FEEDER & PIPING a LL I'LLAR au T NE,axaCI i I INTERICFU EXiERIDR EXHAUST FAN MPAEO FROM INTERIOR EXHAUST PIPE 0W SECTION e EXHAUST FAN EDITION 'A, EXIEFROR —INTERIOR E.EC?12eWALL LOUVER BE M 'I'S AD AS REAIIllIj A By IF- PANITANUTEA DETAILeB WALL PENETRATION NPA waDUE_ OIL 1 11 EA awm� !ue reFA FAR PAR PIPE IN ROPER IF A'.' fxpa[{Hi A BAD ED 1011 PLATE PLINT NOTES All'�NmITMTa.....�reF� "AT BE ATTLEAPPE PAST TFIAIL4 FRAMING CHANNEL Ill STRUCTURAL ATTACHMENT 24 GJASE ATIN-M .1- _1 .Are.. " _ I_DIED SHEET NOTES' IN' LOR DI BAF,NCIDC �ITIA START". ALI 11 PA 'IN' 'IT L FIT NICE ANIT IN ICI FBI F All- SIDE �BA 7 BE 11 LIFE A' IIIRL 'ON Ill I AD 11 ITILI IN 11 11 011 FAINI wmo. � �TE..N:A��I ATV. 1I.I �vq NOTES: �WN�, IN' AL F. ---I' BE OALAANIH FREE AND WATER SYSTEMS KK eaa "= IT,T.rs—I res _�L - waDUE_ OIL 1 11 EA awm� !ue reFA FAR PAR PIPE IN ROPER IF A'.' fxpa[{Hi A BAD ED 1011 PLATE PLINT NOTES All'�NmITMTa.....�reF� "AT BE ATTLEAPPE PAST TFIAIL4 FRAMING CHANNEL Ill STRUCTURAL ATTACHMENT 24 GJASE ATIN-M .1- _1 .Are.. " _ I_DIED SHEET NOTES' IN' LOR DI BAF,NCIDC �ITIA START". ALI 11 PA 'IN' 'IT L FIT NICE ANIT IN ICI FBI F All- SIDE �BA 7 BE 11 LIFE A' IIIRL 'ON Ill I AD 11 ITILI IN 11 11 011 FAINI wmo. � �TE..N:A��I ATV. 1I.I �vq NOTES: �WN�, IN' AL F. ---I' DETAILeF NON-REMOVEABLE BOLLARD ART AA IT FF,FIN III Av.NT E rL�re�reEI.FFFLAT B LIFE III PIPE QETAIL@WALL & FLOOR PENETRATION DETAILe PIPE HANGER BE OALAANIH FREE AND WATER SYSTEMS KK eaa ILL A%— TER FLARRIAll - _-- AID IAL POWDERACTIVATEDCARBON SYSTEM RETROFITF1 N - EQUIPMENT SECTIONS & DETAILS D-3830G- I Ll - VLND ..91A /RE // /Doo / DETAILeF NON-REMOVEABLE BOLLARD ART AA IT FF,FIN III Av.NT E rL�re�reEI.FFFLAT B LIFE III PIPE QETAIL@WALL & FLOOR PENETRATION DETAILe PIPE HANGER BE WATER SYSTEMS KK eaa ILL - _-- HAYDEN BRIDGE FILTRATION PLANT POWDERACTIVATEDCARBON SYSTEM RETROFITF1 E� - EQUIPMENT SECTIONS & DETAILS D-3830G- I Ll - N SHEET NOTES IN AREPEDAR11 1-1 TF IPI11EEI 1110 Ell c REO NOTE 13— NJ— AllALI IS ADATILIN ON— E- IIE ITT Rlj� 11. AN VFRPOLL.. - - un m. -.T E NIO X6 FRO FPON YERnwL CONVEYOR AS REONRt9 i0 GRANTY FEED INN TCP OF 9L0 TUE LUNTRACTOi REAL RELO r RI, CONVEYOR MOND 1 OAND PRONLE 6. MINI 8' MINIMUM CEINXG _ CLF PANOE T fLOM OFFER COWPTON C` i / REWIRED JCR FLEpBIE / SCREW CONEYOR Mfl _ IELD ELWR FEE / LIXIIRACNR HULL ERI FLOOD DIANE VEAIEY WR AND UILA BAG ENT SEE STiULTIML III 'ATH ONNER AND BWN BAC FOR REPAIR. h� UNLDAOEfl BCPPLIER eEETNG WOE WN1RACttKK _ AN .1 FIELD RF10W XORIZONTAL VERIFY INT CON�YCR rn 7 ----INSTALL PARTCLEG ACCORDANCE i I \ 5 n LI MEAT MW = _ j 11S B VERSE IN ACCORDANCE MTI EF -3 PER BUT( BAG UNLOADER SUPPLIER A 8 t HVAC AGE— AG RECW MEXDATWS EVDMi FOR DINNER 0 RVI% / R E III ��'— ' _ \ DINNER RENEW AND APPROVAL. \ILII VE I NE - � fl➢W Ep R6 MEAN G G - OPW CVT WRE E O `OgPEX XGINTOPE%STN4 STEEL XOISi & N LO SUMARL ENEIPANpI SIDE AND LOCANON ARE AS FIGURED HE IF N MATCX NERTGL DROP PIPE IS BULK EAO� ' MAMEIER ANO ANGLE. IHSiALL A OSCNARGE GO TGHi IDW90N A5 REWIRED N SEAL AROUND SNE _ AL LONTiOL NEW PENEENI STRAIT FOR ENCLOSURES IND OXNER PENEW ANO APPPOVAL. CPfAANP Al BEANN, -GU TROL NXPll / _ RE TEo a cEOONEE FOE -DAG DROP (OPPOS2 OF Al o Cf E, q AM iRANE � SLOTEREO SANEIDATON OUTSIDE EDGE OF MEOHANCAL G AND WVER G SDE FAB. PE AGI SLEET NOTES. GRE --- Ili fi SECTION e PROPOSED CONVEYANCE PIPING CARBON BUILDING G T7 _ _zD _ - L- DD' -E' ' PROPOSED CONVEYANCE PIPING CARBON BUILDING - PLAN �_ ..,.L.r' WATER SYSTEMS HAYDENFRIDGE FILTRATION PLANT " POWDER ACTIVATED CARBON SYSTEM RETROFIT W T CONVEYOR PLAN&SECTION 38300—M3 -- T XN W. ENON a sir.. noe E 0 7 0 5 4 3 2 A I B I C I D I E STRUCTURAL SHEETS: S1 GENERAL STRUCTURAL NOTES S2 QUALITY ASSURANCE PLAN & SPECIAL INSPECTION TABLES S3 QUALITY ASSURANCE PLAN & SPECIAL INSPECTION TABLES S4 BUILDING PLAN S5 ROOF FRAMING & FOUNDATION PLAN S6 STRUCTURAL SECTIONS S7 STRUCTURAL DETAILS GENERAL STRUCTURAL NOTES: 1. THESE NOTES ARE GENERAL IN NATURE AND ARE INTENDED TO SET MINIMUM STANDARDS FOR CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY FAMILIAR WITH THE CONTRACT DOCUMENTS AND HAVE A COPY OF THEM ON SITE AT ALL TIMES. 2. FOR ANY PORTION OF THE CONSTRUCTION WHICH THE CONTRACTOR IS UNABLE TO ASCERTAIN THE REQUIRED CONSTRUCTION OR WHERE CONFLICTS EXIST, IT IS THE CONTRACTOR'S RESPONSIBILITY TO REQUEST ADDITIONAL INFORMATION (RFIs) AND/OR CLARIFICATIONS BEFORE CONSTRUCTION. 3. ALL WORK SHALL BE IN STRICT CONFORMANCE WITH THE 2018 INTERNATIONAL BUILDING CODE (IBC) AS AMENDED BY THE 2019 OREGON STRUCTURAL SPECIALTY CODE (OSSC). 4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS BEFORE CONSTRUCTION. THE ARCHITECT AND ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. 5. THE CONTRACTOR, SUBCONTRACTORS AND SUPPLIERS SHALL ENSURE COORDINATION OF CONTRACTOR SUPPLIED/DESIGNED ELEMENTS AND DEFERRED SUBMITTALS WITH ALL DESIGN DISCIPLINES WITHIN THE CONSTRUCTION SET. COORDINATION SHALL IDENTIFY AND RECONCILE CONFLICTS BETWEEN THE CONTRACTOR SUPPLIED/DESIGNED ELEMENTS AND THE CONSTRUCTION DRAWINGS PRIOR TO FABRICATION AND DELIVERY TO THE PROJECT SITE. THE PROJECT ENGINEER SHALL BE NOTIFIED IF CONFLICTS EXIST. 6. THE CONTRACT STRUCTURAL DRAWINGS REPRESENT THE FINISHED STRUCTURE. METHODS, PROCEDURES, AND SEQUENCE OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND ENSURE THE INTEGRITY OF THE STRUCTURE AT ALL STAGES OF CONSTRUCTION. 7. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN LIVE LOAD FOR THE STRUCTURE. PROVIDE SHORING AND/OR BRACING WHERE LOADS EXCEED DESIGN CAPACITY AND WHERE STRUCTURES HAVE NOT ATTAINED DESIGN STRENGTH. 8. CLADDING, WATERPROOFING, AND ARCHITECTURAL FEATURES ARE OUTSIDE THE STRUCTURAL SCOPE OF WORK. ANY DEPICTION OF SUCH FEATURES ON THE STRUCTURAL DRAWINGS ARE NOT INTENDED TO BE USED FOR CONSTRUCTION. REPRESENTATION OF SUCH FEATURES ON THESE DRAWINGS MAY OR MAY NOT BE ACCURATE. REFER TO ARCHITECTURAL DRAWINGS AND/OR SPECIFICATIONS. PER ACI -301, METHOD 2 OR THE ALTERNATE PROCEDURE. SUBMIT DESIGN LOADS: PER 2018 IBC & 2019 OSSC REVIEW BY STRUCTURAL ENGINEER FOR 1603.1.2 - ROOF LOADS: 2. STRUCTURAL CONCRETE SHALL DEAD LOAD............................................................................................. 5 PSF LIVE LOAD............................................................................................. 20 PSF 1603.1.3 - SNOW LOADS: SLABS GROUND SNOW LOAD, Pg............................................................................ 11 PSF FLAT -ROOF SNOW LOAD, Pf.................................................................... USE 29 PSF MIN (2019 OSSC) SNOW EXPOSURE FACTOR, Ce.................................................................... 0.9 SNOW LOAD IMPORTANCE FACTOR, Is ................................................... 1.2, CATEGORY IV THERMAL FACTOR, Ct............................................................................ 1.0 1603.1.4 - WIND DESIGN CRITERIA: DESIGN WIND SPEED, Vult.................................................................... 110 MPH RISKCATEGORY..................................................................................... IV WIND EXPOSURE..................................................................................... EXPOSURE C INTERNAL PRESSURE COEFFICIENT............................................................ DIRECTIONAL PROCEDURE (ASCE 7 27.3) COMPONENTS & CLADDING: DESIGN WIND PRESSURES (+/-) WALL ELEMENTS (Atrib = 10ft2).................................................... 42.82/-53.87 PSF (ZONE 5) OVERHANG ELEMENTS (Atrib = 10ft2)............................................ NA/ -103.59 PSF (ZONE 3) ROOF ELEMENTS (Atrib = 10ft2).................................................... 20.72/-103.59 PSF (ZONE 3) 1603.1.5 - EARTHQUAKE DESIGN CRITERIA: RISK CATEGORY..................................................................................... IV SEISMIC IMPORTANCE FACTOR, IE............................................................ 1.50 SPECTRAL ACCELERATION, Ss.................................................................... 0.653 g SPECTRAL ACCELERATION, S, .................................................................... 0.376 g SITECLASS............................................................................................. B SPECTRAL RESPONSE COEFFICIENT, SOS ................................................... 0.392 g SPECTRAL RESPONSE COEFFICIENT, Sol ................................................... 0.201 g SEISMIC DESIGN CATEGORY.................................................................... CATEGORY D SEISMIC FORCE RESISTING SYSTEM(S)................................................... STEEL ORDINARY MOMENT FRAMES RESPONSE MODIFICATION FACTORS(S), R ................................................... 3.5 SEISMIC RESPONSE COEFFICIENTS(S), CS ................................................... 0.168, ANALYSIS PROCEDURE............................................................................ PER ASCE-7 FOUNDATIONS: 1. EXISTING SITE CONDITIONS SHALL BE VERIFIED TO BE IN CONFORMANCE WITH THE FOLLOWING PARAMETERS AS OUTLINED IN THE PREVIOUS GEOTECHNICAL REPORT FOR THE ADJACENT HAYDEN BRIDGE FILTRATION PLANT 2009 EXPANSION PROJECT. THE PREVIOUS GEOTECHNICAL REPORT WAS PREPARED BY FOUNDATION ENGINEERING, INC. OF BEAVERTON. PHONE: (503) 643-1541, DATED JANUARY 17, 2008 (THEIR PROJECT No. 2071086). THE CONTRACTOR SHALL BE FAMILIAR WITH THAT SUPPLEMENTAL REPORT INFORMATION AND THE RECOMMENDATIONS CONTAINED THEREIN. 2. ALL FOUNDATIONS TO BEAR ON UNDISTURBED NATIVE MATERIAL, OR GRANULAR COMPACTED ENGINEERED FILL, PER THE PROJECT CONTRACT DOCUMENTS. THE CONTRACTOR IS DIRECTED TO THE GEOTECHNICAL REPORT IN THE PROJECT SUPPLEMENTAL INFORMATION FOR ADDITIONAL INFORMATION. EXCAVATIONS FOR FOUNDATIONS SHALL BE OBSERVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING OF CONCRETE FOR FOUNDATION. 3. SOIL DESIGN CRITERIA, PER GEOTECHNICAL ENGINEER: 3.1. SOIL BEARING - 3,000 PSF 3.2. Y3 INCREASE ALLOWED PRESUMED CAPACITIES FOR SHORT TERM LOADS 3.3. SOIL PROFILE - D 3.4. FRICTION COEFFICIENT - 0.35 REVISION DESCRIPDON MN I STD I CHK I APP F G H CONCRETE: 1. ALL CONCRETE SHALL BE HARD ROCK CONCRETE MEETING REQUIREMENTS OF ACI -301, "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS". MIX PROPORTIONS SHALL BE PER ACI -301, METHOD 2 OR THE ALTERNATE PROCEDURE. SUBMIT MIX DESIGN FOR REVIEW BY STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTION. 2. STRUCTURAL CONCRETE SHALL ATTAIN THE FOLLOWING MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS: TYPE f'c SLUMP w/c AIR SLABS 5,000 psi 1-3" 0.42 6% FOOTINGS 5,000 psi 1-4" 0.42 6% 3. ALL CONCRETE EXPOSED TO WEATHER SHALL CONTAIN 6% (f) 1% AIR ENTRAINMENT BY VOLUME. AIR ENTRAINMENT SHALL BE IN CONFORMANCE WITH ASTM C260 AND C494. 4. COLD WEATHER PLACEMENT SHALL CONFORM TO ACI -306. HOT WEATHER PLACEMENT SHALL CONFORM TO ACI -305. MECHANICALLY VIBRATE ALL FORMED CONCRETE. DO NOT OVER -VIBRATE. PLACE CONCRETE MONOLITHICALLY BETWEEN CONSTRUCTION OR CONTROL JOINTS. PROTECT ALL CONCRETE FROM PREMATURE DRYING. 5. SLUMP LIMITS MAY BE INCREASED BY ADDITION OF ADMIXTURES PROVIDED THAT THE WATER/CEMENT RATIO OF THE ORIGINAL MIX DESIGN IS NOT EXCEEDED. WATER REDUCING ADMIXTURE SHALL BE IN CONFORMANCE WITH ASTM494, USED IN CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS. SUBMIT ADMIXTURES TO ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. 6. CEMENT SHALL BY TYPE I OR II IN CONFORMANCE WITH ASTM C150. AGGREGATES SHALL BE IN CONFORMANCE WITH ASTM C33 AND USE CRUSHED (NOT ROUND) GRAVEL OR STONE. COARSE AGGREGATES SHALL NOT EXCEED 3/4". WATER SHALL BE CLEAN AND POTABLE. 7. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. GRADE 40 MAY BE USED FOR #3 AND SMALLER TIES AND STIRRUPS. DETAIL AND PLACE ACCORDING TO ACI MANUAL SP -66. BENDING OF REINFORCING STEEL IN THE FIELD IS NOT PERMITTED WITHOUT APPROVAL BY EOR. REBENDING OR STRAIGHTENING OF REINFORCING OR BENDING OF REINFORCING STEEL CAST INTO CONCRETE IS NOT ALLOWED. 8. UNLESS OTHERWISE NOTED, MINIMUM COVER SHALL BE 1 1/2" FOR #5 AND SMALLER BARS, 2" FOR #6 AND LARGER BARS AND 3" WHEN POURED AGAINST EARTH. SUPPORT REINFORCEMENT WITH APPROVED CHAIRS, SPACERS, OR TIES. 9. PROVIDE MINIMUM 48 BAR DIAMETERS AT SPLICES. NO MORE THAN 50% OF REINFORCING SHALL BE SPLICED AT ANY LOCATION. UNLESS OTHERWISE NOTED, BEND ALL HORIZONTAL REINFORCING A MINIMUM OF 2'-0" AT CORNERS AND WALL/FOOTING INTERSECTIONS WITH MIN EMBEDMENT BEYOND INTERFACE PER DEVELOPMENT LENGTH SPECIFIED IN ACI 318. 10. FORMWORK SHALL BE IN ACCORDANCE WITH ACI -347 "GUIDE TO FORMWORK FOR CONCRETE". FORMS SHALL BE DESIGNED BY THE CONTRACTOR. BRACING SHALL BE PROVIDED AS REQUIRED OR UNTIL THE CONCRETE HAS REACHED ITS SPECIFIED 28 -DAY STRENGTH. ALL SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FORMWORK, SUPPORTS, AND SHORING SHALL PROVIDE FINISHED CONCRETE SURFACES AT ALL FACES: LEVEL, PLUMB, AND TRUE TO DIMENSIONS AND ELEVATIONS SHOWN IN THE DRAWINGS. STRUCTURAL STEEL: 1. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING GRADES, UNLESS NOTED OTHERWISE ON THE PLANS: SHAPE ASTM DESIGNATION YIELD STRESS (Fy) PLATES & BARS ASTM A36 36 ksi HSS (RECTANGULAR) ASTM A500, GRADE C 50 ksi W -SECTIONS ASTM A992 50 ksi ANGLES ASTM A36 36 ksi 2. WELD ACCORDING TO CURRENT AWS STANDARDS WITH E70XX ELECTRODES. 3. WELD SIZES SHOWN ON THE DESIGN DRAWINGS ARE CONSIDERED EFFECTIVE WELD SIZES AND SHALL BE INCREASED IN ACCORDANCE WITH AWS AS REQUIRED BY GAPS OR SKEWS BETWEEN COMPONENTS. 4. ALL STEEL SHALL BE HOT -DIP GALVANIZED, UNLESS NOTED OTHERWISE. 5. ALL STRUCTURAL CONNECTION BOLTS SHALL BE ASTM F3125 GRADE A325, UNLESS NOTED OTHERWISE. HOOKED, HEADED, THREADED, AND NUTTED ANCHOR RODS SHALL BE ASTM F1554 (Fy = 36 ksi), UNLESS NOTED OTHERWISE. 6. CONTACT BETWEEN DISSIMILAR METALS SHALL BE ISOLATED USING PHENOLIC OR OTHERWISE APPROVED ISOLATION HARDWARE 7. WHERE WELDS ARE PART OF THE SEISMIC FORCE RESISTING SYSTEM (SFRS) OR ARE DEMAND CRITICAL, WELDS SHALL BE IN CONFORMANCE WITH AWC D1.8. JOB SITE CONDITIONS AND SAFETY: 1. CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE ENGINEER AND IT'S REPRESENTATIVE HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE ENGINEER. SUBMITTALS: THE CONTRACTOR SHALL PROVIDE THE ENGINEER OF RECORD AND THE BUILDING OFFICIAL SUBMITTALS FOR APPROVAL , PRIOR TO CONSTRUCTION, FOR THE FOLLOWING ITEMS: 1. STEEL FABRICATION SHOP DRAWINGS, MATERIAL CERTIFICATIONS, PROPOSED WELDING DETAILS AT LATERAL FORCE RESISTING SYSTEM & WELDING PROCEDURES. 2. CONCRETE MIX DESIGN AND PROPOSED ADMIXTURES 3. REBAR SHOP DRAWINGS 4. BULK BAG EQUIPMENT PAD DESIGN (BY OTHERS) PETERSON STRUCTURAL ENGINEERS 9400 SW Barnes Rd., Suite 100 Portland, Oregon 97225 (503) 292-1635 10/01/2021 PSE PROJECT NUMBER: 2101-0051 i K I L I M I N STRUCTURAL OBSERVATION REQUIREMENTS: 1. THE OWNER SHALL EMPLOY THE ENGINEER OF RECORD OR AN ALTERNATE OREGON LICENSED PROFESSIONAL ENGINEER, APPROVED BY THE ENGINEER OF RECORD, TO PERFORM STRUCTURAL OBSERVATIONS IN ACCORDANCE WITH SECTION 1704.6 OF THE INTERNATIONAL BUILDING CODE. 2. STRUCTURAL OBSERVATION IS THE VISUAL OBSERVATION OF THE STRUCTURAL SYSTEM BY A REGISTERED DESIGN PROFESSIONAL FOR GENERAL CONFORMANCE TO THE APPROVED CONSTRUCTION DOCUMENTS AT SIGNIFICANT CONSTRUCTION STAGES AND AT COMPLETION OF THE STRUCTURAL SYSTEM. STRUCTURAL OBSERVATION DOES NOT INCLUDE OR WAIVE THE RESPONSIBILITY FOR ANY OTHER INSPECTION CRITERIA, INCLUDING SPECIAL INSPECTION, AS REQUIRED BY THE BUILDING OFFICIAL OR AS INDICATED WITHIN THE INTERNATIONAL BUILDING CODE. 3. DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNER AND THE BUILDING OFFICIAL (AND THE ENGINEER OF RECORD IF AN ALTERNATE ENGINEER IS USED FOR STRUCTURAL OBSERVATION). AT THE CONCLUSION OF THE STRUCTURAL WORK INCLUDED WITHIN THE PERMIT, THE STRUCTURAL OBSERVER SHALL SUBMIT TO THE BUILDING OFFICIAL AND THE OWNER (AND THE ENGINEER OF RECORD IF AN ALTERNATE ENGINEER IS USED FOR STRUCTURAL OBSERVATION) A WRITTEN STATEMENT THAT THE SITE VISITS HAVE BEEN MADE AND IDENTIFY ANY REPORTED DEFICIENCIES WHICH, TO THE BEST OF THE STRUCTURAL OBSERVER'S KNOWLEDGE, HAVE NOT BEEN RESOLVED. 4. THE CONTRACTOR SHALL MAKE AVAILABLE ALL MEANS AND METHODS NECESSARY FOR THE STRUCTURAL OBSERVER TO PERFORM THE REQUIRED STRUCTURAL OBSERVATIONS. IN ADDITION, THE CONTRACTOR SHALL NOTIFY THE OWNER AND STRUCTURAL OBSERVER A MINIMUM OF 48 HOURS BEFORE THE TIME AT WHICH THE SPECIFIED STRUCTURAL OBSERVATIONS MAY BE PERFORMED. IN ADDITION THE CONTRACTOR SHALL UPDATE THE STRUCTURAL OBSERVER OF THE CONSTRUCTION PROGRESS. 5. STRUCTURAL OBSERVATIONS SHALL BE PERFORMED FOR THE FOLLOWING AREAS OF WORK: 5.1. FOLLOWING THE INSTALLATION OF THE FOOTING REINFORCING AND CIP ANCHORS FOR THE STEEL MOMENT FRAME. 5.2. FOLLOWING THE INSTALLATION OF THE MOMENT FRAMES 5.3. FOLLOWING THE COMPLETION OF ALL STRUCTURAL ELEMENTS CONTAINED HEREIN. alID[ele�:l�ele:I �e11 J: �\�1v NGI NEf`�� DES KEK RAH TGM f. A 63186PE �� DWN KEK RAH TGM 1� OREGGNEWEB STANDARDS CHECK S GooLINEIS 2 INCHES_ I AT FULL SIZE EXPIRES 12/31/22 (IF NOT Z'-SWLEAGGORDNGLY EWER WORK ORDER NO. WATER SYSTEMS 2003344 HAYDEN BRIDGE FILTRATION PLANT SCALP NONE POWER ACTIVATED CARBON SYSTEM RETROFIT DATE. 1 0101 1202 1 Dwc ND: GENERAL STRUCTURAL NOTES 38300-S1 RROIECT SHEET NO: 51 U 0 0 7 0 5 4 3 2 1 A NOTE: SIDING AND ROOFING PER MECHANICAL SHEETS r a 9 REV NO. REV DATE 'n B I c D I E EX CARBON BUILDING EXTERIOR FACE OF WALL 4-8" 6 - - - - - - - - - - - r — — — — — — — — — — — — T 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L — _ _ _ BULK BAG DISCHARGER BELOW REVISION DESCRIPDON 22 GAGE PLB-36 GRADE 50 2/ CONNECTION PATTERN TO SUPPORTS W/ HILTI X—HSN 24 PAF L- n-L-�--1- - 20--0" HSS6x4xW, OUTRIGGERS ® 24" O.C. MAX ROOF FRAMING PLAN o� F ROOF PERIMETER, EDGE OF EAVES G HSS 7x7x% COLUMN, (4) TOTAL PROPOSED ADDITION ROOF EDGE (ABOVE) W8x10 ROOF RAFTERS ® 24" O.C. MAX 2 S6 BUILDING EDGE ABOVE HSS9x7x3/8 MOMENT FRAME BEAMS AT EXTERIOR, (4) TOTAL oILI (3) #6 3-0 CORNER BARS, EQUALLY SPACED, TYP EACH CORNER OWN STD CHK I APP 9400 SW Barnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 H J0 G 0 0 eCOLUMN BASE PLATE DETAIL I 7'-0" I <� I I J K EX BUILDING EDGE 8" SLAB W/ TYP SLAB REINFORCING ABOVE PIPE PENETRATIONS, MAX 4'—D" LENGTH EDGE OF TURNDOWN EDGE OPENING AT PIPES 4'-0" I I BY Go APP DES KEK o N~ OWN O RAH TGM 2 / II ---- — — — — — (' II « -------- - - I I II a 9 REV NO. REV DATE 'n B I c D I E EX CARBON BUILDING EXTERIOR FACE OF WALL 4-8" 6 - - - - - - - - - - - r — — — — — — — — — — — — T 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I L — _ _ _ BULK BAG DISCHARGER BELOW REVISION DESCRIPDON 22 GAGE PLB-36 GRADE 50 2/ CONNECTION PATTERN TO SUPPORTS W/ HILTI X—HSN 24 PAF L- n-L-�--1- - 20--0" HSS6x4xW, OUTRIGGERS ® 24" O.C. MAX ROOF FRAMING PLAN o� F ROOF PERIMETER, EDGE OF EAVES G HSS 7x7x% COLUMN, (4) TOTAL PROPOSED ADDITION ROOF EDGE (ABOVE) W8x10 ROOF RAFTERS ® 24" O.C. MAX 2 S6 BUILDING EDGE ABOVE HSS9x7x3/8 MOMENT FRAME BEAMS AT EXTERIOR, (4) TOTAL oILI (3) #6 3-0 CORNER BARS, EQUALLY SPACED, TYP EACH CORNER OWN STD CHK I APP 9400 SW Barnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 H J0 G 0 0 eCOLUMN BASE PLATE DETAIL I 7'-0" I <� I I J K EX BUILDING EDGE 8" SLAB W/ TYP SLAB REINFORCING ABOVE PIPE PENETRATIONS, MAX 4'—D" LENGTH EDGE OF TURNDOWN EDGE OPENING AT PIPES 4'-0" I I L M N ^� BY Go APP DES KEK RAH N~ OWN O RAH TGM 2 / II ---- — — — — — (' II « -------- - - I I II I I II _�_I���_ I I II 1'-7" TYP I I II I I II I L M N ^� BY Go APP DES KEK RAH N~ OWN O RAH TGM 2 —— — — —— —— — — — — — — — S6 — — — — — — — — — — — — - -------- - - -- 1'-7" TYP I EX PIPING TO BE RELOCATED SEE CONCRETE SLAB WITH CIVIL SHEETS TURNDOWN EDGE L _ _ I I FOOTING OL BULK BAG I BUILDING EDGE ABOVE DISCHARGER I I I 8'-7 1/2" EQUIPMENT PAD I L 5-2 1/2"t I MAX PER SECTION SLAB SEE CIVIL SHEETS TURNDOWN EDGE SLOPE I I I SLOPE Yc 12 I I I FOOTING EDGE I Y,12 I 5 HSS5x501R POSTS, (^ L 157 BASE PLATE I II II CONCRETE SLAB, 5'-9" O1 I I REINFORCING PER TYP I I � SECTION m I I HEADERS ABOVE I ;0 I I TRENCH DRAIN SEE PER SECTION I CIVIL SHEETS \yl� I I II L o I o II 1,_0. 120,_0„ 22._0" I I EX PIPING TO REMAIN SEE CIVIL SHEETS; PIPING CHANGES ARE SHOWN ON SHEET C1, VERIFY DEPTH OF PIPING IN FIELD PRIOR TO FILED PREP EWEB EXPIRES i2�3i�22 FOUNDATION PLANA ORECAN FUNC BY CHK APP DES KEK RAH TGM OWN KEK RAH TGM STANDARDS CHECK LINE IS 2 INCHES AT FULL SIZE (IF NG! 3'-S W LE ACCORDINGLY) 5'-9" X 5-9" X MIN 36" THE. FOOTING, #6 BARS 0 10" O.C. MAX, EACH WAY, TOP & BOTTOM 4 HSS5x2x%, POSTS, $7 BASE PLATE EWER WORK ORDER NO. WATER SYSTEMS 2003344 HAYDEN BRIDGE FILTRATION PLANT SCALE. 112"= 1'-0" POWER ACTIVATED CARBON SYSTEM RETROFIT DATN 10101121 o..c rvo: ROOF FRAMING & FOUNDATION PLAN 38300-S5 WOOER SHE rvo: SS J 0 7 5 0 3 2 t i It a 9 A B NOTE: SIDING AND ROOFING PER MECHANICAL SHEETS EX ROOF EX CARBON BUILDING CONTRACTOR SHALL FIELD VERIFY WITH GROUND PENETRATING RADAR AND AVOID CORING THROUGH REINFORCEMENT, TO GREATEST EXTENT POSSIBLE, AS REQUIRED TO INSTALL CONVEYOR PIPE. IF CORING THROUGH REINFORCEMENT IS :I UNAVOIDABLE TREAT ALL CUT REBAR WITH SIKA ARMATEC-110 EPOCEM OR 1 EQUIVALENT. BULK BAG DISCHARGER C 0 SIM POST BEAM CONNECI W8z10 RAFTERS ® 24" O.C. MAX E S7 ROOF DECKING PER ROOF FRAMING PLAN 12 \� 3 QD0a �¢ mw METAL STUDS PER MECHANICAL SHEETS - — — — — _ _ _ — — — — — - I I 5-3" MAX 14'-10" I 11 I I 2 HEADER TO POST S7 CONNECTION I I HSS5x5xX HEADER, TYP, BEYOND, PER PLAN B'-11 1/2"i \ I HSS5z2zN5 POST, BEYOND POST, BEYOND I I- � I � 13--10"i I I I CONVEYOR PIPING SEE CIVIL SHEETS CONTRACTOR SHALL FIELD VERIFY WITH GROUND \ PENETRATING RADAR AND AVOID CORING THROUGH GROUTED CELLS, TO GREATEST EXTENT POSSIBLE, F SIM HEADER TO WALL CONNECTION S7 AS REQUIRED TO INSTALL CONVEYOR PIPE. IF ROUGHEN SURFACE AND APPLY CORING THROUGH GROUTED CELLS IS UNAVOIDABLE I BONDING AGENT PRIOR TO POURING TREAT ALL CUT REBAR WITH SIKA ARMATEC -110 EQUIPMENT PAD EPOCEM OR EQUIVALENT AND NOTIFY THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL, TYP. G eHSS9z7z MOMENT FRAME BEAM AT EXTERIOR, R 57 TOTAL, FOR CONNECTION H HSS6x4x%6 C OUTRIGGERS W/ END CAP ® 24" O.C. MAX, S7 FOR CONNECTION HSS 7x7x% COLUMN e HEADER TO POST $7 CONNECTION, OTYP ST I HSS5x2x0i/5 POST, BEYOND 5 POST BASE ST CONNECTION, TYP I TOP OF CONCRETE BEYOND TRENCH DRAIN, SEE CIVIL SHEETS w yd 0 F zw E o om I � nd N GRADE, VARIES 1,_6„ 1'-6"6 1 ®12" O.C. $6 ®12' O.C. #6 ] ® 12" O.C. SECTION e ADDITION 1. REINFORCING NOTES: 1. REINFORCING MAY BE FLAT OR 1/2"=1'-0" S5 SLOPED WITH TOP OF SLAB. 2. SEE D/S7 & 1/S7 FOR REQUIRED ANCHOR REINFORCING. REV NO. REV DATE REVISION DESCRIPDON MN STD CHK APP rm9400 SW Barnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 p 5 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 TIE END STUD TO WALL PER MECHANICAL SHEETS I I J EX WALL 3'-2- 4'— 2,_2"i u� u I 16•_10' F -------------- I I I I I I BULK BAG DISCHARGER I I I I I I I I I I I I I I I I I 20,_0" 4'-2 1/2-± MAX I I I a� t. 30 m Z a. w om #5 ® 12' O.C., TYP J 22'-0" SECTIONe2 ADDITION K EX ROOF BW8x10 RAFTERS S7 24" O.C. MAX, FOR CONNECTION 9'-11 1/2"i EQUIPMENT PAD, CONTRACTOR SHALL VERIFY PAD DIMENSIONS AND REINFORCING AS REQUIRED FOR THE APPROVED BULK BAG DISCHARGER. L M N HSS9x7x% MOMENT FRAME BEAMS AT EXTERIOR, (4) TOTAL _A 1 s l 1 HSS 7x7x% COLUMN 4 POST BASE S7 CONNECTION, TYP 8" SLAB W/ $6 BARS BY CHK APP DES ® 12" O.C., EW., T&B, RAH TGM I N KEN 3" CLEAR BOTTOM, 2" CLEAR TOP & SIDES TGM I I I X EQUIPN SHALL AND R FOR TI DISCHt a. e " #6 DOWEL 0-9m® 12" O.C. DOWEL 4" INTO EX � FOUNDATION WITH DEWALT PURE 110+ EPDXYMIN 8" SLAB W/ #6 BARS ®12" O.C., J E,W., CENTERED, MIN 3" CLEAR BOTTOM, • .;,•a: MIN 2" CLEAR TOP, & 2" CLEAR SIDES G eHSS9z7z MOMENT FRAME BEAM AT EXTERIOR, R 57 TOTAL, FOR CONNECTION H HSS6x4x%6 C OUTRIGGERS W/ END CAP ® 24" O.C. MAX, S7 FOR CONNECTION HSS 7x7x% COLUMN e HEADER TO POST $7 CONNECTION, OTYP ST I HSS5x2x0i/5 POST, BEYOND 5 POST BASE ST CONNECTION, TYP I TOP OF CONCRETE BEYOND TRENCH DRAIN, SEE CIVIL SHEETS w yd 0 F zw E o om I � nd N GRADE, VARIES 1,_6„ 1'-6"6 1 ®12" O.C. $6 ®12' O.C. #6 ] ® 12" O.C. SECTION e ADDITION 1. REINFORCING NOTES: 1. REINFORCING MAY BE FLAT OR 1/2"=1'-0" S5 SLOPED WITH TOP OF SLAB. 2. SEE D/S7 & 1/S7 FOR REQUIRED ANCHOR REINFORCING. REV NO. REV DATE REVISION DESCRIPDON MN STD CHK APP rm9400 SW Barnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 p 5 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 TIE END STUD TO WALL PER MECHANICAL SHEETS I I J EX WALL 3'-2- 4'— 2,_2"i u� u I 16•_10' F -------------- I I I I I I BULK BAG DISCHARGER I I I I I I I I I I I I I I I I I 20,_0" 4'-2 1/2-± MAX I I I a� t. 30 m Z a. w om #5 ® 12' O.C., TYP J 22'-0" SECTIONe2 ADDITION K EX ROOF BW8x10 RAFTERS S7 24" O.C. MAX, FOR CONNECTION 9'-11 1/2"i EQUIPMENT PAD, CONTRACTOR SHALL VERIFY PAD DIMENSIONS AND REINFORCING AS REQUIRED FOR THE APPROVED BULK BAG DISCHARGER. L M N HSS9x7x% MOMENT FRAME BEAMS AT EXTERIOR, (4) TOTAL _A 1 s l 1 HSS 7x7x% COLUMN 4 POST BASE S7 CONNECTION, TYP r � 8" SLAB W/ $6 BARS BY CHK APP DES ® 12" O.C., EW., T&B, RAH TGM $6 BARS ® 12" D.C., KEN 3" CLEAR BOTTOM, 2" CLEAR TOP & SIDES TGM E.W. UNDER COLUMN BASE PLATE r � FUNC BY CHK APP DES KEN RAH TGM DWN KEN RAH TGM ORECAN EWEB STANDARDS CHECK Z'IbxS1 SGS LINE IS2NCHES AT FULL SIZE EXPIRES 12/31/22 (IF NOT r -Sc LE ACBBRDINGLYI e,�'. i' i •i'. * o 7' •.a• '?� F, • •ea •e e. e" TYP #6 BAR AT CORNER (6) #6 LONGITUDINAL BARS SPACED AS SHOWN 0^ 0 7 5 4 EX BUILDING 3 SLAB PER CIVIL SHEETS EWER WORK ORDER NO. WATER SYSTEMS 2003344 HAYDEN BRIDGE FILTRATION PLANT SCALE_ 112"= 1'-0" DATE_ 10101121 POWER ACTIVATED CARBON SYSTEM RETROFIT B rvo: STRUCTURAL SECTIONS 38300-S6 WOJE�SHEETrvo: 56 J 2 1 A )' CJP, SFRS WELC a 0 a B I c CJP, SFRS WEL CJP, SFRS WELL PLAN C sS "-IE BEAMS ELEVATION DETAILeA BEAM AND COLUMN CONNECTIONS 1-1/2"=1-0" $6 ROOF RAFTER EX BUILDING 0 HSS FRAME BEAMS E F HSS MOMENT FRAME G #5 ANCHOR REI BELOW, SHALL B FIELD VERIFY FINAL (3) ANCHORS, P ATION OF BEAM PRACTICABLE SURFACE WHILE DETAILrB ROOF RAFTER TO BEAM CONNECTION HSS MOMENT FRAME BEAM CJP, SFRS WELD 7YP1/4" L ROOF OUTRIGGER 1/4" NOTE:FIELD VERIFY FINAL ELEVATION OF BEAM DETAIL@CC ROOF OUTRIGGER TO BEAM CONNECTION 1-1/2"=1 -0" S6 GROUT INFILL OF RECESSED BASE PLATE ANCHOR REINFORCEMENT HOOP, PLACE AS CLOSE AS PRACTICABLE TO THE ANCHORS ANCHOR REINFORCEMENT HOOP, PLACE AS CLOSE AS PRACTICABLE TO THE ANCHORS X" THE. ANGLE CONNECTOR, ANGLE LEG HSS COLUMN DIMENSIONS PER CONTRACTOR AS REQUIRED TO MEET ANCHOR MANUFACTURE INSTALLATION REQUIREMENTS, (4) CONNECTORS AT BEAM AND (4) CONNECTORS AT COLUMN, (8) TOTAL, EQUALLY SPACE CONNECTORS %1 'O HOLE W/ (1) SIMPSON %" 0 STAINLESS-STEEL TITEN HD SCREW ANCHOR - PER CONNECTOR, (8) TOTAL DETAILeE FRAME TO EX STRUCTURE CONNECTION DETAIL j REV NO. REV DATE REVISION DESCRIPDON DWN STD CHK APP D COLUMN ANCHORAGE AND �BASE PLATE PER DETAIL H NFORCEMENT HOOP E IN CONTACT WITH LACE AS CLOSE AS TO THE CONCRETE MAINTAINING CLEAR COVER m 18" X 18" X 1-" THK. ASTM A36 (Fy = 36 KSI) BASE PLATE I K I L HSS COLUMN 1XIs'e HOLE W/ 1"0 GAL ASTM F1554 GR 55 HEAVY HEX HEAD CIP ANCHOR BOLT, EMBED 6", V-6•• MAXIMUM 2" THE. NON -SHRINK GROUT PAD W/ PSI MINIMUM STRENGTH,TH, T TYP (4) LOCATIONS PER BASE PLATE M I N 1,14* TYP 1 /4' (2) TWSSS-10 STAINLESS STEEL BLIND BOLTS HSS5X2x'3�6 a 0 0 6x5"A," THK. ASTM A36 (Fy = 36KSI) PLATE (2) #5 ANCHOR REINFORCING HAIRPINS NTH STANDARD HOOKS, SECTIONe POST -HEADER DETAIL PLACE AS CLOSE AS PRACTICABLE TO THE ANCHORS, BELOW S7 1. 4.. 5.. 5" 4.. ,sQETAILeD BASE PLATE DETAIL NOTE: (4) BASE PLATES S5 TOTAL, (3) SIM TO DETAIL D/S5 EXISTING BUILDING FOUNDATION BY c APP DES n RAH TGM MN KEK / I STANDARDS CHECK I I CJP LINE IS 2 INCHES I na . N °' d. a' M I N 1,14* TYP 1 /4' (2) TWSSS-10 STAINLESS STEEL BLIND BOLTS HSS5X2x'3�6 a 0 0 6x5"A," THK. ASTM A36 (Fy = 36KSI) PLATE (2) #5 ANCHOR REINFORCING HAIRPINS NTH STANDARD HOOKS, SECTIONe POST -HEADER DETAIL PLACE AS CLOSE AS PRACTICABLE TO THE ANCHORS, BELOW S7 1. 4.. 5.. 5" 4.. ,sQETAILeD BASE PLATE DETAIL NOTE: (4) BASE PLATES S5 TOTAL, (3) SIM TO DETAIL D/S5 EXISTING BUILDING FOUNDATION A c TYP SLAB REINFORCING 18" LONG #6 DOWEL ® 12" O.C. DOWEL 4" INTO EXISTING FOUNDATION WITH DEWALT PURE 110+ EPDXY SECTION FOUNDATION AT (E) PIPELINES 9" X 5" X Y" THK. ASTM A36 (Fy = 36KSI) PLATE A. 8 oad a< aa_' A e Id A d c ° ° a ° 4 u a pa ° ea ednad a d a d T4 d d 1/4 d4.a 1. FOOTING AND SLAB REINFORCING d CLARITY.NOT SHOWN FOR ° 2. ANCHOR REINFORCING BEYOND NOT SHOWN FOR CLARITY. SECTION ANCHOR REINFORCING 9400 SW Burnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 O O N SECTION(? POST BASE DETAIL (2) V'0 THREADED ROD W/ PURE 110+ EPDXY, MIN 4" EMBED - HSS COLUMN HSS5x5x-XB POST (4) TW6SS-10 STAINLESS STEEL BLIND BOLTS HEADER PER SECTION SECTION HEADER CONNECTION ORECAN EWEB EXPIRES 12�31�22 FUNC BY c APP DES n RAH TGM MN KEK RAH TGM STANDARDS CHECK d LINE IS 2 INCHES a na . °' d. a' ad . A c TYP SLAB REINFORCING 18" LONG #6 DOWEL ® 12" O.C. DOWEL 4" INTO EXISTING FOUNDATION WITH DEWALT PURE 110+ EPDXY SECTION FOUNDATION AT (E) PIPELINES 9" X 5" X Y" THK. ASTM A36 (Fy = 36KSI) PLATE A. 8 oad a< aa_' A e Id A d c ° ° a ° 4 u a pa ° ea ednad a d a d T4 d d 1/4 d4.a 1. FOOTING AND SLAB REINFORCING d CLARITY.NOT SHOWN FOR ° 2. ANCHOR REINFORCING BEYOND NOT SHOWN FOR CLARITY. SECTION ANCHOR REINFORCING 9400 SW Burnes Rd., Suite 100 eq Portland, Oregon 97225 (503) 292-1635 10/01/2021 PETERSQN STRUCTURAL ENGINEERS PSE PROJECT NUMBER: 2101-0051 O O N SECTION(? POST BASE DETAIL (2) V'0 THREADED ROD W/ PURE 110+ EPDXY, MIN 4" EMBED - HSS COLUMN HSS5x5x-XB POST (4) TW6SS-10 STAINLESS STEEL BLIND BOLTS HEADER PER SECTION SECTION HEADER CONNECTION ORECAN EWEB EXPIRES 12�31�22 FUNC BY CHK APP DES KEK RAH TGM MN KEK RAH TGM STANDARDS CHECK LINE IS 2 INCHES AT FULL SIZE (IF NOT 3'-S W LE ACCORDINGLY) OO t_J SLAB EDGE SECTION 95 POST BASE DETAIL 3"=11-0" S5 EWER WORK ORDER NO. WATER SYSTEMS 2003344 HAYDEN BRIDGE FILTRATION PLANT SCALE VARIES POWER ACTIVATED CARBON SYSTEM RETROFIT DATE. 10/01/21 D NO STRUCTURAL DETAILS 38300—S7 v ODER SHEEf No: 57 J 0 0 7 5 4 3 2 1 Attachment 4 — Aerial Photo Feet 0 175 350 700 1,050 1,400 w EWEB N W+E S ao Q¢ � o m u W L Ln w Ln w L 3 W z Qw u w INFORMATION SHOWN IS FOR EWER USE ONLY AND IS NOT WARRANTED TO RE ACCURATE FOR UNINTENDED PURPOSES. REVISED 7/24/2018