Loading...
HomeMy WebLinkAboutPermit Plumbing 1991-11-15RESIDENTIAL PERMIT APPLICATION lnspections: 726-3769 Office: 726-3759 SPRI]{GFIELl) JOB NUMBER 225 Fifth Street Spri ngfield, Oregon 97 477 LOCATION OF PROPOSED WORK:te-iq "f\, \t-to frrreeL ASSESSORS MAP:TAX LOI ///oo LOT:BLOCK:SUBDIVISION OWNER:'Yvli cKraQ c*-i\llsp-'a Sen.s,PHON E: ADDRESS:I a\q \.^i\. lfs =sTreeA CITY:'.>rCrin zrR eid STATE:AtL ZIP qr422 J DESCRIBE WORK:reobtct hos- lal r^t:U^- NEW - REMODEL ADDITION or- DEMOLISH OTHER CONTRACTOR'S NAME ADDRESS CONST. CONTRACTOR #EXPIRES PHONE GENERAL: PLUMBING 4 -t34d ELECTRICAL: - OFFICE USE _ QUAD AREA: r OF BLDGS: LAND USE FLOOD PLAIN * OF UNITS:ZONING CODE: OCCY GROUP: * OF STORIES: CONSTR, TYPE: HEAT SOURCE: * OF BDRMS: WATER HEATER RANGE: SECONDARY HEAT SQUARE FOOTAGE: To request an inspection, you must call 726-3769. This is a24hour recording. AII inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQU!RED INSPECTIONS l-l Temporary Etectric Rough Mechanical - Prior to cover. pf final Plumbing - When altJAplumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Electrical - Prior to Final Electrical - When all electrical work is complete.cover. Underslab Plumbing/ Electrical / Mechanical - Prior to cover.Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framing lnsp. Final Building - When all required inspections have been approved and building is completed.Masonry - Steel location, bond beams, grouting.Framing - Prior to cover. Foundation - After forms are erected but prior to concrete placement. Other Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filling trench.l--l Drywall - Prior to taping. MOBILE HOME INSPECTIONSUnderlloor Plumbing/ Mechanical - Prior to insulation or decking.Wood Stove - After installation Post and Beam - Prior to floor insulation or decking.lnsert - After fireplace approval and installation of unit. Blocking and Set.Up - When all blocking is complete. Floor lnsulalion - Prior to decking.Curbcut &Approach - After forms are erected but prior to placement of concrete. Plumbing Conneclions - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling tren ch. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Water Line - Prior to filling trench. Fence - When completed Slreet Trees - When all required trees are planted. Rough Plumbing - Prior to cover. ?, 1 n t '1q\ - l?=.-I4, 'hni ckoc.O \eu,ls \\ R '{r\ - \)-$c' MECHANICAL: E E E r r fl l-_l Final - After ail required 'J inspections are approved and porches, skirting, decks, and venting have been installed.il Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type v - lnterior Corner - Panhandle - Cul-de-sac Setbacks P.L.HSE GAR ACC N S E , THE PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Plans Reviewed By Date Receipt Numbe Plan Check Fee: Date Paid Received By: VALU E (A) X S/SQ. FT. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SQ. FT. Main Garage Carport Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. SYSTEMS DEVELOPMENT CHARGE (SDC) (B) ADDITIONAL COMMENTS ITEM Fixtu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEEy'gao FT FT. FT. (u/1 .s.75 4, urdt, PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge /5,*,7{ Wood Stove/ lnsert/Fireplace Unit Dryer Vent Mechanical Permit (D) N0Vent Fan lssuance State Surcharge Total Permit MECHANICAL PERMIT Fu rnace Exhaust Hood By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain -qr ton Signature Date on the site at all times durin \\- \5 MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk --. ft Curbcut -- ft Demolition State Surcharge Total Miscellaneous Permits (E) :/2* 1/ - /f -7/DATE PAID f-*l- 7_rAMOUNT RECEIVED RECEIVED BY VALIDATION: RECEIPT NUMBER TOTAL AMOUNT DUE (excluding electrical) (A, B, C, D, and E Combined) 7s N0