HomeMy WebLinkAboutPermit Correspondence 1997-09-19:. fITNGFIELD
D EVELOP M ENT S ER WC ES DE PARTM E NT 225 FFTH STREET
SPRINGFIELD, OR 97477
(s41) 726-37ss
FAX (s41) 726-368e
September 19,1997
Rooffione, Asphalt Co[ection Facility Inc.
Darold Smith & Bill Whitlock
l0l9 28th Street
Springfiel4 AR 97477
Subject Minimum Development Standards (tvIDS) for proposed use at l0l9 28th Street
DearMr. Smith and Mr. Whitlock:
The Springfield Development Code (SDC) 31.010 requires any business that has changed use or expanded
by no more than fify percent or 10O00 squars feet to be reviewed for Minimum Developme'nt Strndards
(tvDS). Thescstandardshetpeshblishmentscomplywithnewdevelopme,lrtstandardswithoutlhecostand
time required for a full site plan review. Your proposal to establish an outdoor storagc collection and
recycling ceirter for used building malerials and asphalt pavement requircs a MDS rcview. The following
conditions must be met at l0l9 2Eth Sfieeq Springfie[ Onegon to succpssfully complete the MDS
prooess:
The following standards shalt be met within 90 days of approval of this application or a bond or security
deposit mustbe posted forthis work.
-/ Street Trces: Springfield Development C,ode (SDC) 35.050 requires ste€t trees spaced at 30 foot
int€rvals, except where there are physical restrictions. Street trees shall not be planted closer than 35 feet
from thc perpendicular curb line of intersections of streets, nor within 5 feet of allep, private driveways,
fire hydrant, or utility poles.
l-/ Required landsceping: 5 foot wide planter strip located along the frontage of 28th Street shall be
covered with at least 65 percent living plant materials within 5 years of the date of installation. Except
where planted with native species or plant communities, all new required planting areas on private propeAy
shall be provided with a permanent underground inigation system.
qh+
"Jtr
Sidewalks
Unsafe curb cut
Connection to storm sewer lines.
t-/ Parking lot paving: The 3 space pa*ing areas in front of the office must be paved with a durable
dust free surface which includes asphaltic concrete or Portland cemenl Wheel stops and stiping lines shall
be provided for each ofthe three spaces. Ifthe value ofthe paving exceeds S10,000, the project may be
completed within a 3 year time period providing a bond or security deposit equal to the value of the paving
is provided" If the cost of the paving is less than $10,000, the prcject must be completed within a2 year
time period providing a bond or security deposit is provided. If the paving is deferre4 an estimate of the
cost to insoall this improvement must be provided . Please contact a bank or bonding company for
establishment ofthe security if the improvements are deferred.
-r'- Air qualrty Management The Regional Air Quality Management District may require prooessors
to spray materials with watcr to control dusl The District may also want certification that the incoming
loads have been tesrcd for asbestos. The applicant agrees to accept no asbestos, garb4ge, particle board,
metal.s, or wood products.
1. Site Obscuring fence: The proposal to use the site as a storage and rccycling area for used roofmg
marcrials appears to meet the use standards provide that the site is screened from pub'iic view by a site
obsctring fence or tandscaping.
All of fte above improv-ements must be completed within a 90 day time period or a bond or security
deposit must be posted for this work. tf you have further questions please contact Kitti Gale at716-3753.
Cordially,
Kitti M.Gale
Planner, City of Springfield
Code Enforcement
Building Division
@: