Loading...
HomeMy WebLinkAboutPermit Plumbing 1994-07-07ELE,RESIDENTIAL PEBMIT APPLICATION lnspectlons: 726-3769 Offlce: 726-3759 LOCATION OF PROPOSED K: ASSESSOBS MAP: LOT 7- ,Qfr, JOB NUMBER 225 Fifth Street Sprlngfleld, Oregon 97 477 TAX LOT SUBDIVISION:BLOCK: OWNER: CITY: ADD STATE:ZIP: E EBADDITION DEMOLISHNEW- REMODEL DESCRIBE WO MECHANICALI ADDRESS EXPIRES PHONE CONST. CONTRACTOR # ELEfiRICAL: CONTRACTOR'S NAME GENERAL: PLUMBING BANGE: ,I OF BDRMS: - OFFICE USE - LAND USE: WATER HEATER: ZONING CODE: FLOOD PLAIN: * OF UNITS: OUAD AREA: * OF BLDGS: SECONDARY HEAT SQUARE FOOTAGE: OCCY GROUP: * OF STORIES: CONSTR. TYPE: HEAT SOUHCE: To request an lnspectlon, you must call 726-3769. Thls ls a 24 hour recordlng. Atl lnspectlons requested before 7:00 a.m. wlll be made the same worklng day, lnspectlons requested after 7:00 a.m. wlll be made the followlng work day. REOUIRED INSPECTIONS l--l Temporary Electrlc Rough Mechanlcal - Prlor to cover. Flnal Plumbing - When all plumblng work ls complete. E Slte lnspectlon - To be made after excavatlon, but prior to settlng forms. Rough Electrlcal - Prior to Flnal Electrical - When all electrical work is complete,cover. Underslab Plumblng/ Electrlcal/ Mechanlcal - Prlor to cover.Electrlcal Servlce - Must be approved to obtaln permanent electrlcal power. Flnal Mechanlcal - When all mechanical work ls complete. Footlng - After trenches are excavated.[-l Flreplace - Prlor to faclnglJ materlals and framlng lnsp. Flnal Bulldlng - When all requlred lnspectlons have been approved and bullding ls completed.Masonry - Steel locatlon, bond beams, groutlng, fl Framlng - Prlor to cover. Foundalton - After forms are erected but prlor to concrete placement. Other WaltlCelllng lnsulatlon - Prlor to cover. Underground Plumblng - Prlor to fllllng trench.[--l Drywall - Prlor to taplng. MOBILE HOME INSPECTIONSEUnderltoor Plumblngl Mechanlcal - Prlor to lnsulatlon or decklng.tl Wood Stove - After lnstallatlon. Post and Beam - Prlor to floor lnsulatlon or decklng.lnserl - After flreplace approval and lnstallatlon of unlt. Blocklng and Set.Up - When all blocklng ls complete. Floor lnsulatlon - Prlor to decklng.Curbcut & Approach - After forms are erected but prlor to placement of concrete. Plumblng Connectlons - When home has been connected to water and sewer. Sanltary Sewer - Prlor to fllllng trench.Electrical Connectlon - When blocklng, set-up, and plumblng lnspections have been approved and the home ls connected to the servlce panel. Storm Sewer - Prlor to filling trench. Sldewalk & Drlveway - After excavation ls complete, forms and sub-base materlal in place. Llne - Prlor to filling Fence - When completed. trench. Streel Treea - When all requlred trees are planted.Rough Plumblng - Prlor to cover. E E E fl E tl E [--l Final - After all requiredtJ lnspections are approved and porches, sklrting, decks, and ventlng have been Installed. ,1 ''t'+,ijr it Lot faces Lot sq. ftg. Lot coverage Topography Total helght Lot Type - - lnterior - Corner - Panhandle - Cul-de-sac ks i- lS THE PROPOSED WORK rN THE -. HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, thls appllcatlon must be slgned and approved by the Historlcal Coordinator prlor to permit issuance. APPROVED: PL.HSE GAR ACC N S W E VALUE (A) X $/SO. FT. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SO. FT. Ivtain Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT Thls permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, includlng the Development Code, regulating the construction and use of bulldings, and may be suspended or revoked at any tlme upon violation of any provisions of said ordlnances. Receipt Number:- Plans Reviewed By Date Plan Check Fee: Date Paid Received By: SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge ls due on all undeveloped properties within the City limits which are being improved. ITEM Fixtures Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE oo ?SI q)(c) FT. N0 FT. PLUMBING PERMIT Plumblng Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fl replace Unit Dryer Vent MECHANICAL PERMIT (D) No Mechanical Permit lssuance State Surcharge Total Permit Furnace Exhaust Hood Vent Fan By slgnature, I state and agree, that I have carefully examlned the completed appticatlon and do hereby certlfy that all lnformatlon hereon ls true and correct, and I f urther cerilfy that any and all work performed shall be done ln accordance wlth the Ordinances of the Clty of Sprlngfield, and the Laws of the State of Oregon pertainlng to the work descrlbed hereln, and that NO OCCUPANCy wlll be made of any structure wlthout permission of the Bulldlng Safety Divislon. I further certlfy that only contractors and employees who are ln compllance with ORS 7Oi.OS5 wlll be used on fhlsproject. I further agree to ensure that all requlred inspections are requested at the proper time, that each address ls readable from the street, that the permlt card ls located at the front the property, and the approved set of plans will remaln the slte at all times during construcilon. re Date MISCELLANEOUS PERMITS Mobile Home State fssuance State Surcharge Sldewalk -.-- ft Curbcut - ft Demolitlon State Surcharge Total Mlscellaneous Permits (E) TOTAL AMOUNT DUE (exctuding electricat) (A, B, C, Q and E Combtned) \ DATE PAID RECEIVED AMOUNT VALIDATION: RECEIPT NUMBE