Loading...
HomeMy WebLinkAboutPermit Building 1992-02-03COMM ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Filth Street, Springfield, Oregon 97477 SPRINGFIELO OI afr, JOB NUMBER I NSPECTION LINE: 726-3769 OFFICE: 726-3759 f,/o LOCATION OF PROPOSED WORK: ASSESSORS MAP:TAX LOT:15 100 PHONE STATE: 1-0.\) ln f^1q1 .t ztP: q1q11 OWNER ADDRESS: CITY: VALUE:J1 nbOLISH OTHER DESCRIPTION OF WORK: NEW - REMODEL ADDITION D NAME ADDRESS PHONE ADDRESS PHONE ')tD CONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: EXPI RES PLUMBING: GENERAL: CONST. tX clOq CONTRACTOR # PLU MBING NO.FEE CHARG E Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backflow Device TOTAL PERMIT MECHANICAL NN FFtr .H A RNF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or tloor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER OCCY GROUP: * OF STORIES: QUAD AREA: g OF ELDGS: VALUESO. FT, TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER RCPT#DATEPLAN CHECK FEE BY BUILDING PERMIT 11(),s o PLUMBI NG DEMOLITION 5% State Su rcharge ?.s3 5% State Surcharge MECHANICAL FENCE VALUE $ 5% State Surcharge SIDEWALK FT. SUBTOTAL PERM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT + nq 03TOTAL PERMIT FEES EXCLUDING ELECTRICAL CONSTR. TYPE: HEAT SOURCE: $/SQ. FT. -V REQUIRED INSPECTIONS VV It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated iob number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:0O a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC1AL INSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division. excavated and forms are facing materials and before erected, ail steet in ptace, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after ail insrab buirdins 3l::5::.':ff 3,';il?,.iHl:r" EII:,"J"',f3"t,Y5f3ol',rrr, ,, service equipment, conduit, and vents are complete andpiping, accessories and other incira-ry equipment items are :i".',i::HlHi:,X iJ;[9:t: Bl?lf],lE]uol,l"E,o"'lHt"oin place but before any tighte;ing operations. (306concrete is placed. INSULATIoN & vApoR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.Storm sewer, water and before any lath or gypsum Standards 43_8.drainage lines. To be made board interior wall tovering isprior to covering or filling applied.trenches. qyH,,ve. spEclAL GRADING, ,NDERFL..R: p'umbins I:::,S""'"? mXfl[Hi"' El;tU1',iil#lL',5;b'j],"i, electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the City's POST & BEAM: To be made interior and eiierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 U'B.C' insulation, decking or floor plastering is applied or before STDS' 25-10'11)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7). .\,/ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: -PLANS REVIEWED BY DATE By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. are requested at the proper time, that project address is readable f rom thethe property, and the approved set of plans will remain on the site at all Signatu Date 2l=,1 I further agree to ensure that all required inspecti street, that the perm is located at the times during cons VALIDATION \ UZq D6 )l a lc>AMOUNT RECEIVED RECEIPT *:BECEIVED BY: DATE PAID t\ \1q