HomeMy WebLinkAboutPermit Building 1996-07-01CO MM ERCIAL/IN DUSTRIAL
PERMIT APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
SPNINGFIELc,JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
3ea2*_
2fr,
fitEtt c *a{€t- 3zo €ml 5?{4.rcPr.eLOCATION OF PBOPOSED WORK:
ASSESSOBS MAP:.z TAX LOT:
? YA' tLQ$PHONE:
jL<>
^j atL
OAe ZIP:STATE:
9ufcc <-S^ 0s c-
CITY:<(rv JG Fr.u
ADDRESS
OWNER:
,a* X REM'DEL ADDtrtoN DEMoLtsH orHEB
?DIfuI PCcvnstaucr NDESCRIPTION OF WORK:
VALUE: 4@O,o*
ARCHITECT:
PHON EADDRESSNAME
PHONE
?vt asiYYcpg
tC-
t^)
ELECTRICAL:b
MECHANICAL C-tsr,nf.
a-
fi -o,)
GENERAL:
PLUMBING:y
CONTRACTOR'S NAME EXPI RESADDRESS
CONST.
CONTRACTOR '3V7tB 7'z-1
CHARGEFEENO.
Single Fixture
n fix. addt
Relocated Bld
-Water Servlte
ft
- Sanitary-Se.wer ft
Storm Sewer
tt.
Backf low Device
TOTAL PERMIT
MECHANICAL
NN FFF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnaie and vent
Suspended wall or f loor
mounted unit heater-ffitiarrce Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
ZONING
_ OFFICE USE -HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
CONSTR. TYPE:
HEAT SOURCE:
LAND USE:
/ OF UNITS
OCCY GBOUP:
Y OF STORIES:
QUAD AREA:
Y OF BLDGS:
VALUE$/SQ. FT.SQ, FT.
TOTAL VALUE OF PROJ
X
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ, FTG OTHER
PLAN cHEcK rer ?/'73 RCPT#BYDATE
2fr
BUILDING PERMIT ,.2.=:PLU M BI NG DEMOLITION
5% State
Surcha
- ( a!3_5% State
Su rc harqe
MECHANICAL FENCE
VALUE $
5% State
J t SIDEWALK
F'r,
SUBTOTAL
PERM ITS
PAVI NG CU RBCUT
FT
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
.a5/D
..HAAntr
V REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your city designated job number, job address, type of inspeciion requested and when you wi, be readyfor inspection' Requests received before 7;00 a.m. will be made the same working day, requests made after 7:00 a.m. will be madethe following work day.
FIREPLACE: Prior to ptacing
facing materials and before
framing inspectlon.
pAVtNG:.Aft8i gravei is inplace but prior to placing
asphalt or concrete.
SPECIAL INSPECTTONS: tn accordance
Section 306 of the State Specialty Codea special inspector shall be employedby the Owner/ Contractor duringconstruction of the following work. Acopy of the special testing reports shallbe furnished to the Building Division.
SITE |NSPECT|ON: To be
made after excavation, butprior to,setup qf forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANTCAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, butprior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,piping, accessories and other
ancillary equipment items arein place but before any
concrete is placed.
UN DERGROUND: ptumbing,
electrical, gas, sanitary sewer,
storm sewer, water ano
drainage llnes. To be madeprior to covering or f illing
t re nc hes.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until iitese
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CUBTAIN WALLS
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are inplace and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after allinsulation and required vapor
barriers are in place but
before any lath c: Sypsumboard interior wall covering is
applied.
STRUCTURAL CoNCRETE: Inexcess of 2500 pS.t. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2222 l)
HIGH STRENGTH BOLTING:
During all bolt installation andtightening operations. (306
a.6)
SPRAYED ON
FtREpROOFtNG: U.B.C.
Standards 43-8.
UN DERFLOOR: Plurnbing,
electrical, mechanical. To be
made prior to inst;,ilation offloor insulation, decking orfloor sheathing.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
FIRE & SEPARATION WALL:
Located and constructed
according.c plans.
LATH ANC ?il GYPSUM
BOARD: lb i;e made after alllathing ancl gypsum board,interior and exterioL is inplace but before any
plastering is applied or beforegypsum board joints and
fasteners are taped and
fi ni shed.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and formwork and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &Chapter 29)
cLU.LAM BEAMS: tnspection
Certif icate by an approved
agency, furnished to the City,sBuilding Division beforebeams are placed. (2501 U.BC.
STDS, 25.10,11).
STRUCTURAL MASONRy: (306
a.7)
POST & BEAIII: To be madeprior to installat;.'.,n of floor
insulation, decking or f loor
s heath i ng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steet location,
bond beams grouting or
verticals in accordance with
UBC 2415.
*ln addition to the inspec.tions specified, the BuildingOfficial may make or requi16other Inspections of anyconstruction work to ensurecompliance with the Building,City or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th.at all informationherein is true and correct, and I further certify that any and all work performed shall be done in accoidance with the ordinancesof the city of Springfield, and the Laws of the state of oregon pertaining to the work described herein, and that No occupANcywill be made of any structure without permission of the Building safety Division. I further certify that only contractors and employeeswho are in compriance with oRS 701:055 wiil be used on this project.
7-LSignatureDate
pro.
tru
all required inspections are re quested at the proper time, that ject address is readable from thelocated at the front of the property, and the approved set of pl ans will remain on the site at ail
I f urther agree to ensure
street, that the permit
times ciuring
VALIDATION ?-<4C
RECEIVED BY,
DATE PAID:AMOUNT RECEIVED:
RECEIPT *:
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
-- FINAL FIRE DEPA.RTMENT
slrE
'LAN REVTEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. Ail project
"onoitron'"-"uch aslandscaping, parking lot striping, etc. must Oe compf eteO beforerequesting thls inspection.
FINAL BUILDTNG: Requested after the finar plumbing, erectricar,mechanical and Fire Department inspections are made and
lpproved. No occupancy of the premises can be made until acertificate.of occupancy has been issued by the auiroinj-'oiuisionand posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY saE 2-2%
r
<f as