Loading...
HomeMy WebLinkAboutPermit Building 1996-07-01CO MM ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPNINGFIELc,JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 3ea2*_ 2fr, fitEtt c *a{€t- 3zo €ml 5?{4.rcPr.eLOCATION OF PBOPOSED WORK: ASSESSOBS MAP:.z TAX LOT: ? YA' tLQ$PHONE: jL<> ^j atL OAe ZIP:STATE: 9ufcc <-S^ 0s c- CITY:<(rv JG Fr.u ADDRESS OWNER: ,a* X REM'DEL ADDtrtoN DEMoLtsH orHEB ?DIfuI PCcvnstaucr NDESCRIPTION OF WORK: VALUE: 4@O,o* ARCHITECT: PHON EADDRESSNAME PHONE ?vt asiYYcpg tC- t^) ELECTRICAL:b MECHANICAL C-tsr,nf. a- fi -o,) GENERAL: PLUMBING:y CONTRACTOR'S NAME EXPI RESADDRESS CONST. CONTRACTOR '3V7tB 7'z-1 CHARGEFEENO. Single Fixture n fix. addt Relocated Bld -Water Servlte ft - Sanitary-Se.wer ft Storm Sewer tt. Backf low Device TOTAL PERMIT MECHANICAL NN FFF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnaie and vent Suspended wall or f loor mounted unit heater-ffitiarrce Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT ZONING _ OFFICE USE -HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER CONSTR. TYPE: HEAT SOURCE: LAND USE: / OF UNITS OCCY GBOUP: Y OF STORIES: QUAD AREA: Y OF BLDGS: VALUE$/SQ. FT.SQ, FT. TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ, FTG OTHER PLAN cHEcK rer ?/'73 RCPT#BYDATE 2fr BUILDING PERMIT ,.2.=:PLU M BI NG DEMOLITION 5% State Surcha - ( a!3_5% State Su rc harqe MECHANICAL FENCE VALUE $ 5% State J t SIDEWALK F'r, SUBTOTAL PERM ITS PAVI NG CU RBCUT FT SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL .a5/D ..HAAntr V REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your city designated job number, job address, type of inspeciion requested and when you wi, be readyfor inspection' Requests received before 7;00 a.m. will be made the same working day, requests made after 7:00 a.m. will be madethe following work day. FIREPLACE: Prior to ptacing facing materials and before framing inspectlon. pAVtNG:.Aft8i gravei is inplace but prior to placing asphalt or concrete. SPECIAL INSPECTTONS: tn accordance Section 306 of the State Specialty Codea special inspector shall be employedby the Owner/ Contractor duringconstruction of the following work. Acopy of the special testing reports shallbe furnished to the Building Division. SITE |NSPECT|ON: To be made after excavation, butprior to,setup qf forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANTCAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, butprior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit,piping, accessories and other ancillary equipment items arein place but before any concrete is placed. UN DERGROUND: ptumbing, electrical, gas, sanitary sewer, storm sewer, water ano drainage llnes. To be madeprior to covering or f illing t re nc hes. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until iitese inspections have been made and approved. ATTIC DRAFT STOPS & CUBTAIN WALLS FRAMING: To be made after the roof, all framing, fire blocking and bracing are inplace and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after allinsulation and required vapor barriers are in place but before any lath c: Sypsumboard interior wall covering is applied. STRUCTURAL CoNCRETE: Inexcess of 2500 pS.t. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2222 l) HIGH STRENGTH BOLTING: During all bolt installation andtightening operations. (306 a.6) SPRAYED ON FtREpROOFtNG: U.B.C. Standards 43-8. UN DERFLOOR: Plurnbing, electrical, mechanical. To be made prior to inst;,ilation offloor insulation, decking orfloor sheathing. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. FIRE & SEPARATION WALL: Located and constructed according.c plans. LATH ANC ?il GYPSUM BOARD: lb i;e made after alllathing ancl gypsum board,interior and exterioL is inplace but before any plastering is applied or beforegypsum board joints and fasteners are taped and fi ni shed. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and formwork and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 &Chapter 29) cLU.LAM BEAMS: tnspection Certif icate by an approved agency, furnished to the City,sBuilding Division beforebeams are placed. (2501 U.BC. STDS, 25.10,11). STRUCTURAL MASONRy: (306 a.7) POST & BEAIII: To be madeprior to installat;.'.,n of floor insulation, decking or f loor s heath i ng. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steet location, bond beams grouting or verticals in accordance with UBC 2415. *ln addition to the inspec.tions specified, the BuildingOfficial may make or requi16other Inspections of anyconstruction work to ensurecompliance with the Building,City or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th.at all informationherein is true and correct, and I further certify that any and all work performed shall be done in accoidance with the ordinancesof the city of Springfield, and the Laws of the state of oregon pertaining to the work described herein, and that No occupANcywill be made of any structure without permission of the Building safety Division. I further certify that only contractors and employeeswho are in compriance with oRS 701:055 wiil be used on this project. 7-LSignatureDate pro. tru all required inspections are re quested at the proper time, that ject address is readable from thelocated at the front of the property, and the approved set of pl ans will remain on the site at ail I f urther agree to ensure street, that the permit times ciuring VALIDATION ?-<4C RECEIVED BY, DATE PAID:AMOUNT RECEIVED: RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL -- FINAL FIRE DEPA.RTMENT slrE 'LAN REVTEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. Ail project "onoitron'"-"uch aslandscaping, parking lot striping, etc. must Oe compf eteO beforerequesting thls inspection. FINAL BUILDTNG: Requested after the finar plumbing, erectricar,mechanical and Fire Department inspections are made and lpproved. No occupancy of the premises can be made until acertificate.of occupancy has been issued by the auiroinj-'oiuisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY saE 2-2% r <f as