Loading...
HomeMy WebLinkAboutPermit Mechanical 1998-11-20COTUME PERMIT i?'flliJlflusrR'AL SPfiI^.CFIELc, 225 Fitth Street, Springfield, Oregon g7477 LOCATION OF PHOPOSED WORK;QD N,6 'qj JOB NUMBER 0 t?l INSPECTION LINE:OFFICE: 226-3759 TAX LOT:9/ ta, 726.3769 ASSESSORS MAP t7 07 tf Ll €t PHON E 6R ZIPSTATE:lt t/7'7 b Ett N 6 rrEt0CITY: /+p ADDRESS: OWNER 3.ru N NEW - REMODEL ADDITION DEMOLISH VALUE sDESCFIIPTION OF WORK:EPTFC EHT OTHER (rjt NAME ADDRESS PHON E ARCHITECT: CONTRACTOR'S NAME ADDRESS CO NST. CONTRACTOR /EXPI RES PHON E GENERAL: PLUM B I NG MECHANI a*nL"74 c0 qbb b aAd *too ELECTRICAL: you Furnace/burner & ventSingle Fixture the on < 100 000 BTUs $,a I Z.an Relocated Bt otification enter ose ru set Furnace/burner & vent new >t ETUS I ce in bynes of ru FIoor furnace and vent tary calling cente (Note:uspen WA Ior oor mounted unit heater rm ewer p Ven )SC arate at onary evap. elBackf low Device coo I nt an ng e duct nt tern apart or htg,f rom ec an EX aust hood and duct ,L is 6-oo /2, oa Permit lssuance t.?a $10.00 TOTAL PERMIT TOTAL PERMIT 95,? _ OFFICE USE - ZONING LAND USE HANDICAP ACCESS LIGHTING POWER BUDGET. WATER HEATER OCCY GROUP # OF STORIES QUAD AREA: r CF BLDGS: FLOOD PLAIN: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY js-q 7 BUILDING PERMIT PLUMBING DEMO LITION 5% State Surcharge 5% State Su rcharge MECHANICAL I FENCE VALUE $ 5% State Su rcharo e SIDEWALK FT. SU BTOTAL PERM ITS PAVING CURBCUT FT. SYSTEMS DEVELO PMENT I TOTAL PERMIT FEES EXCLUDING ELECTBICAL I OF UNITS: It is the responsibility of the pelr.mit ntlO:; izo".iios (recorder), state your citv designat i.'r i".o"J,'5n- Requests received before 7:o REOUIRED INSPECTIONS o see that all inspections are made at the proper time. To request an inspection' call ed job number, ion aoore"sl, ivp;;i inspeciio;;;qu""t"o uld *i:: vou will be readv r0 a.m. will be made tne s'me *orking day' '"q'""i" made atter 7:00 a'm' will be made PAVING: Af ter gravel is in Place but Prior to Placing asPhalt or concfete' SPECIAL INSPECTIONS: ln accordance IL"ti." soo of the State Specialt.y Code I "p""irL inspector shall be employed rv ine Owner/ Contractor during I6nstiuctlon of the following work' A ..;;;; "f the special testing reports shall Le'f urnisneO to the Building Division' the following work daY SITE INSPECTION: To be made after excavation' but , Prior to setup of forms' UNDERSLAB PLUMBING' ELECTRICAL & MECHANICAL: To be made before anY work is covered' FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel ln Place' but Prior to Placing concrete' CONCRETE SLAB: To be made af ter all inslab building service equiPment, conduit' PiPing, accessories and other ancillarY equiPment items are in Place but before any concrete is Placed. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and aPProved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to Placing facing materials and before framing insPection. FRAMING: To be made after the roof, all f raming, Iire blocki ng and bracing are in Dlace and all PlPes, chimneYs and vents are comPlete and the rough electrical, Plumblng and meihanical are aPProved' INSULATION & VAPOR BARRIER: To be made after all insulatlon and required vaPor barriers are in Place but before arrY iath or gYPSUm board interior wall covering is appl i ed. FIRE & SEPARATION WALL: Located and constructed according to Plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gYPsum board, interior and exterior, ls in olace but before anY plastering ls aPPlied or before gypsum board ioints and fasteners are taPed and finished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating comPlete and form work and sub'base material in pl ace. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. STRUCTURAL WELDS: Performed on the iob' (2722 I) HIGH STRENGTH BOLTING: During all bolt installation and tightening oPerations. (306 a.6) SPRAYED ON FIREPROOFING: U'8.C. Standards 43'8. STRUCTURAL CONCRETE: IN excess of 2500 PS.l. (306 a'1) SPECIAL GRADING, EXCAVATION AND FILLING: Duri ng earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnsPection Certif icate bY an aPProved agencY, f urnished to the CitY's Building Division before beams are Placed. (2501 U.BC. sTDS. 25-10,11). STRUCTU RAL MASONRY: (306 a.7) - ln addition to the insPec' tions specified, the Building Of f icial may make or require other inspections of anY construction work to ensure compliance with the Building, City or DeveloPment Code. UNDERFLOOR: Plumbing, electrical, mechanical' To be made Prior to installation of f loor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. UNDERGROUND: PIUMbiNg, electrical, gas, sanitarY sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. FLOOR INSULATION & VAPOR BARRIERS: TO bC made Prior to installation of decking or f loor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to lnstalling any roof coveri ng. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all lnformation herein is true and correct,-and I f urther certify tnat any and allwork performed shatl be done in accordance with the ordinances of the city of Springfield, and the Laws of rhe state of oregon pertainlng to the work described herein, and that No occuPANCY will be made of any structure without permission oi the Building Safety Divlsion. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, t;,al the permit card is located it the front of the property, and the approved set of plans will remain on the site at all tontimes duri ng DateSignat u re 1t"3s.1 z- VALIDATIO N 09ztt'/ rl Lo AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITEPLANREVIEwBoARD:MUstberequested2daysinadvance ofthedateyouwishinSpection.Allprojectconditionssuchas landScaping,parkinglotStriping,etc.mustbecompletedbefore requestlng this lnsPection. FINALBUILDING:Requestedafterthefinalplumbing,electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a iertificate of Occupancy has been issued by the Building Division and Posted on the Premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE /l-aa-?r }bs li',e- \b$b Qu* tI ,rrr4" h lF, .no""rt I -LU) \sts t -r*rr.* - ol(b.*lmit uncr *!**7 I Asf { I I I I I I I COM M ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRINGFIELO JOB NUMBER 5Ll INSPECTION LIN E: 726-3769 OFFICE: 726-3759afr, LOCATION OF PROPOSED WORK:3ZD 6rH ASSESSORS MAP:r1 n3 35 fu 24 TAX LOT: PHONE: STATE:ZIP:er?* ++1 ^l ?Jo(o 3Z-o torOWNER: ADDRESS: CITY: NEW - REMODEL ADDITION DEMOLISH ffi VALUE: DESCRIPTION OF WORK Z?LI ecr 4loo q NAME ADDRESS PHONE ADDRESS EXPI RES PHONE ELECTRICAL: ARCHITECT: CONTRACTOR'S NAME MECHANICAL: PLUM BI NG: GENERAL: CONST. CONTRACTOR # FFF CHARGENO. Single Fixture Relocated Bldg (new fix. addtl) Water Service ft. 2r +b'Sanitary Sewer ft. Storm Sewer ft. Backf low Device NU I IUE: \LL EXP RE IFTHE WIHIU PHHMIT SH, S PEBMIT ISAU IIIUHIZEU UN ]ER THI IU AHAI {DONED FOFvvMlYltrl\LrtrU Uf Alnr a^A 2{ c')TOTAL PERMIT .ttlr rou UAY rtrnluu. MECHANICAL Nr|FFF l1I{AFIGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100.000 BTUs Floor furnace and vent Suspended wall or tloor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct $10.00Permit lssuance TOTAL PERMIT .-u K - OFFICE USE - ZONING LAND USE FLOOD PLAIN LIGHTING POWER BUDGET: * OF UNITS: OCCY GROUP: g OF STORIES: QUAD ABEA: * OF BLDGS: WATER HEATER: CONSTR. TYPEr HEAT SOURCE: $/SQ. FT.VALUESQ. FT, TOTAL VALUE OF PROJ x X X SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER BCPT#DATEPLAN CHECK FEE BY -#al BUILDING PERMIT PLUMBING *as. -DEMOLITION 5% State Su rcharoe 5% State Surcharoe -ir0J lJtr ,l f MECHANICAL FENCE VALUE $ 5% State Su rcharqe SIDEWALK FT. SUBTOTAL PERMITS PAVI NG CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL 0 qt6v 1147+ HANDICAP ACCESS: REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL tNSpECT1ONS: tn accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & Oy tne Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTTNGS & FOUNDATTONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Buildiig Division. excavated and forms are facing materials and before erected, ail steet in place, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after an rnsrab buirding 3i::5 ::.":fl 3l'3:It"r.l;;3r" Bl}3,Hyll"t,Y5f3ol',rrz uservice equipment, conduit, and vents are complete andplping, accessories and other incinarv equipment items are H:':::["",1i""ji':,X'j#[l:1: 5lf,:f],?E],?T*,?P*lH:".in place but before any tighte-ning operations. (306concrete is placed. , ./ 'Jl"-HtH# fr"'fi".?i.,,", ",, a'6) UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are ln place but FIREpROOFING: U.BC.storm Sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering is lrrJ::;:":*"rins or fillins apptied. spEctAL GRAD.NG, ,NDERFL.oR: prumbins Il::,$""=": m'J3[,Y3"' iffilUt']iil#ii:,5J:'i],"t electrlcal, mechanical. To be according to plans. chapter 29) made prior to installation of ftoor insulatlon, decking or LATH ANDTOR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARDT To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the clty's pOST & BEAM: To be made interior and exierlor, is in ' Building Division before prior to lnstallatlon of floor place but before any beams are placed' (2501 U'B'c' lnsulation, decking or floor plastering ls applied or before STDS' 25'10J1)' sheathlng. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR tNSULATtoN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prlor to installing any roof coverlng. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. .ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that ail informationherein is true and correct, and I further certify that any and all work performed shall be done in accoidance with tne Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. inspections are requested at the proper time, that project address ls readable from thethe front of the property, and the approved set of plans will remain on the site at all Signature Date 66 I further agree to ensure that all required i street, that tl times during he t card ls located at ction 5- ?-41VALIDATIONAMOUNT RECEIVED RECEIPT #RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, etectricat, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE # zT oo