Loading...
HomeMy WebLinkAboutPermit Building 1996-03-27CO M M ERC!AL/ I N DUSTRIAL PERMIT APPLICATION 225 Frtfi Street, Springfield, Oregon 97477 LOCATION OF PROPOSED R ASSESSORS MAP SPFlINGFTELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 a.r( TAX LOT: { OWNER: ADDRESS CITY:STATE: PHONE: ZIP: VALUADDITION DESCRIPTION OF WORK a at"/NEW- REMODEL DEMOLISH OTHER ARCHITECT: Dt il^rFuNtl.:. MECHANICAL: ELECTRICAL: NAME ADDRESS PHON E ADD RESS EXPI RES PHONECONTRACTOR'S NAME G EN ERAL: CONST. CONTRACTOR # PLU MBING NO FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NO trtrtr CHARGE Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ LAND USE: ZONING* OF UNITS: HANDICAP ACCESS: FLOOD PLAIN LIGHTING POWEB BUDGEI WATER HEATER: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT,VALUE ;6 S)7 X SO. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHEH RCPT#DATEPIAN CHECK FEE BY +\ 5q BUILDING PERMIT 38A)PLUMBING DEMOLITION 5% State Su rc harge l. ctc1 t to 5% State Su rcharoe MECHANICAL FENCE VALUE $ 5o% State Su rcharqe SIDEWALK FT. SUBTOTAL PE RM ITS PAVI NG CURBCUT FT. SYSTEMS D EVELO PM ENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL rorAL vALUE or pao*fu REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Flequests received before 7:O0 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made _ a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duri ng CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after au insrab buirdins 3i::5::.':ff 3,'iilt",1,H;:r" BII3,"JJJ3"L,Y5tT',rrr, ,, service equipment, conduit, and vents are complete and- :i,J,l3;:",',1il{:? ?$""'TJ :H'fl'":H;t"ii:,l,iJ;[?:t: Bl?Xf],?E],?T*,?l,"TH:".in place but before any tighte-ning operations. (306concrete is placed. INSULATION & VApOR a.6) BARRIER: To be made after all UNOERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering isprior to covering or fiiling appried. spEcrAL GRADTNG,t renc hes. ,NDERFL..R: p'umbing I:::,S""="'f;SflJ3[Hf"' il;iuTiii-tli.',5Jb'i]""a electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the City,s poST & BEAM: To be made interior and exierior, is in . Building Division before prior to installation of floor place but before any beams are placed' (2501 U'B.c' insulation, clecking or f loor plastering is applied or before STDS' 25-10'11)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR rNsuLATroN & finished' a'7\ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or yerticals in accordance with ,.'u3c 241s. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all ( ti durin con5truction DATION AMOUNT RECEIVED RECEIPT *:RECEIVED BY: DATE PAID FINAL PLUMBING F]NAL ELECTRICAL FINAL MECHANICAL F]NAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking Iot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Bequested after the final plumbing, etectricat, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: -PLANS REVIEWED BY DATE