HomeMy WebLinkAboutPermit Plumbing 1993-12-15COM M ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
SPRINGFIELO
R 6 ta 3
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
LOCATION OF PRO
ASSESSORS MAP
PHONE:
)i*-,--l'r r STATE:ztPYbt-z-v
/ro 4. 34-V/
-t--m
CITY:
ADDRESS
OWNER:
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALUE
4/^f"^ L--*DESCRIPTION OF WORK:
PHONENAMEADDRESS
ARCHITECT;
coNTRAcroR's NAME /lcC'* r'-f t S alts CONST.
ooNTRACTOR o '/ ls./1EXP|RES 2 -a?/
MECHANICAL:
ELECTRICAL:
ftn- 3)- 1
ADDRESS PHONE7//a2
GENERAL:
PLUMBING
PLUMBING
FEE CHARGENO.
\(Y qc>'o(.-Single Fixture
Relocated Bldg.
(new fix. addtl)
t It
*ryffis"5C
?rc3-
Sdhildry Sewer
ft
Storm Sewer
ft
Backf low Device
TOTAL PERMIT Y5=
MECHANICAL
NO trFF T.HAFIGtr
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
- OFFICE USE -
ZONING
HANDICAP ACCESS:
FLOOD PLAIN:
LIGHTING POWER BUDGET:
WATER HEATER:
CONSTR. TYPE:
HEAT SOURCE:
LAND USE:
# OF UNITS
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGS:
VALUESQ. FT.$/SQ. FT,
TOTAL VALUE OF PROJECT
X
X
SO. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
I
BUILDING PERMIT PLUMBI NG DEMOLITION
570 State
Su rch arge
5% State
Surcharqe
MECHANICAL FENCE
VALUE $
5% State
Su rcharge
SIDEWALK
FT.
SUBTOTAL
PERM ITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be madethe following work day.
SITE INSPECTION: To be ROUGH PLUMBING, pAVtNG: After gravet is inmade after excavation, but ELECTRICAL & place but prior-to placingprior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB PLUMBING, inspections have been made SPECTAL TNSPECTIONS: tn accordance
ELECTRICAL & and approved. Section 306 of the State Speciatty codeMECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A
FOOTINGS & FOUNDATTONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished io the Buildiig Division.
excavated and forms are facing materials and before
erected, all steel in place, but framing inspection' srRUcruRAL CONCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.I)
coNcRETE SLAB: To be the roof' all framing' fire
made after an insrab buirdins 313:5 l:.':ff ffi:Ir"r,';;:r" EI*:,."J"',f3"t,Y5f3of',rrr, ,service equipment, conduit, and vents are complete anclpiping, accessories and otherancilirv equipment items are H"o';::[j,]igi:,1'j,$[l:?: Bl?Xf],?;],?l[,?,o"tIH:"0in place but before any tighte-ning operations. (306concrete is placed. tNSULATtoN & vApoR a.6)
BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering isprior to covering or filling applied.trenches. sPH'!vy. spEclAL GRADING,
,NDERFL..R: p,umbing [ll:,S""="'f;m'J3[Hi"' EX:iJt'iiil-:li',5;b'i]'"i,
electrical, mechanical. To be according to plans. chapter 29)
made prior to installation of
floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection
floor sheathing. BOARD: To be made after all Certificate by an approved
lathing and gypsum board, agency, furnished to the City's
poST & BEAM: To be made interior and exterior, is in ' Building Division before
prior to installation of floor place but before any beams are placed' (2501 U'B.c'
insulation, decking or floor plastering is applied or before STDS' 25'10'11)'
sheathing. - gypsum board joints and
fasteners are taped and STRUCTURAL MASONRY: (306
FLooR TNSULATToN & finished' a'7)
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
RooF sHEATHTNG AND :Hl3^Hifi'tr::f""!|,.
NAILING: Prior to installing erected but prior to placing
any roof covering. concrete.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
"ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I fuither certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are reguested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
Signature c Date /2. /5- 7Z
tlmes during construction
VALIDATION -\AMOUNT RECEIVED
RECEIPT *:RECEIVED BY:
DATE PAID
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesti ng this inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:-
PLANS REVIEWED BY DATE
C'TY OF SPR"UGFIEL OREGO'U
The !ollowing Proiect
zi.tring. aPd does not
as submitted has the
require specilic land use
3
A
!iP]lI1l.GFIELD
ELBCTRICAL PERHIT
City Job Number
APPLICATION
73 rs4 7
225 PIfrfl STREBT
SPRINGPIELD OREGON 974 77 ,nno Ll4.r
INSPECTION REQUEST: 726-37 69 -7soPPrcE: 726-3759 I a1
1. LOCATTON OP rNsTAl1,4lr1fiyocr
68o rv. 36^
LEGAL DBSCRIPTION/?na- 3 t '2*/22sO
JOB DESCRTPTION
(,rrRrrrz t<aP H4i+M NT Rrni/-ntalK
Permits are non-transferable and explre
if vork is not started within 180 days
of lssuance or lf vork ls suspended for
180 days.
2. CONT&A(f,OR INSTALI,ATION ONLT
Electrical Contractor o/!L)Ez<-
Address
ci ty-Phone
Supervisor License Number .lO?3 S
Exp lration Date iO-('q5
constr contr. Number 6r"/0ai'E€ c,F
Expiration Date 4ffi4-
Slgnature of Supervlsing Electrician
SCEEDULB BELOII
Nev Residential-Single or
MuIti-Family per dvelling unit.
Service Included:
Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Hanuf'd Home or
-Hodular Dwelllng
Servlce or Feeder
$ 8s.00
$ 1s.00
:
$ 40.00'
Services or Feeders
Installation, Alterations
or Relocation:
Sum
B
200 amps or less t
201 amps to 400 amps
401 amps to 600 amps
-601 amps to 1000 amps_
Over 1000 amps/volts
Reconnect Only
$ so.oo
$ 60.00
$100.00
$130.00
3/- -"\o,a)
$300.00
$ 40.00
Ovners Name
Address
tutLL 4yr.,*/rtu)E
c.
D. Branch Circuits
Nev, Alteration or Extension Per Panel
one Circuit $ 35.00
J€Each Additional
Circuit or vith Service
or Feeder Permit 3 $ .2.00 q@
Temporary Services or Feeders
Installation, Alteratlon or Relocation
200 amps or less '$ 40.00
201 amps to 400 amps
-
$ 55.00
over 401 ro 600 amps
-
$ 80.00
Over 600 anps or 1000 vorfs see 'Bu affi
Hiscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation $ 40.00
sign/outline Lightins] $ 40.00
t imited Energy/Res
-
S 20.00
Limited Energy/Comm $ 36.00
ci ty-Phone
OSNER INSTALI,ATION
The installation is being made on
property I ovn which is not intended
for sale, Iease or rent.
Omers Signature:
DATE:
B
SUBTOTAL OF ABOVB
5Z State Surcharge
TOTAL
'5L ,DD
2-A O
RBCBIVBD
.Z 5
rs B.g o
,1