Loading...
HomeMy WebLinkAboutPermit Mechanical 1994-06-16I 'IAL 225 Fifth Street, Springtield, Oregon 9747t sPNINGF'ELO JoB Nt)MBEa ?*<za*-> INSPECTION LtN E: 7 26-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:680 N. 36th ASSESSORS MAP:TAX LOT:e29a*^ 726-4360PHON E OB 97478SpringfieldZIP:STATE: WillamaIa Park & Fleereati nn Di st - 3550 E. Street CITY: ADDRESS: OWNER NEW - REMODEL X ADDITION DEMOLISH OTHER VALUE: Install air conditi onino unit (5 ton)DESCRIPTION OF WORK: CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE GENERAL: PLUMBING: ELECTRICAL: PHONEADDRESSNAME Comfort ene 974O2 #00460 6/27 /95 342-8t01,FIow Heatinq 855 W. First, EuqMECHANICAL: PLU MBING NO.FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MTOHANIEAL NO FFF CHARGE Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single d uct Vent Sys from AC tem apart or htg. Mechanical exhaust hood and duct I 4ln CoNBnciltNG' ba aoo BrLL Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE - ZONING LAND USE HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER * OF UNITS: OCCY GROUP: # OF STORIES QUAD AREA: '+ OF BLDGS: CONSTR. TYPEr HEAT SOURCE: VALUE$/SQ. FT.SQ. FT. TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE BYDATE '--=-/ 2o<G2 o BUILDING PERMIT PLUMBI NG DEMOLITION 5% State Su rchare e 5% State Su rcharqe -?#M:rMECH /r,aE FENCE VALUE $ 5o/o Surcha SIDEWALK FT. SUBTOTAL PE RM ITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL PERfiIIIT 'D-4<- FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UN DERGROUN D: Ptumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: PIumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathi ng. FLOOR ]NSULAT]ON & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. the rough electrical, plumbing HIGH STRENGTH BOLTING: A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.l) STRUCTURAL WELDS: Performed on the job. (2722 t) During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.ll & Chapter 29) cLU-LAM BEAMS: tnspection Certificate by an approved agency, furnished to the City,s Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRy: (306 a.7) *ln addition to the inspec- tions specified, the BuildingOfficial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with OFIS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at alltimes during construction. Signature dfu Date 6 - /d-/ =-Z;--2>VALIDATION:AMOUNT RECEIVED: FIECEIPT r:RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL Y FINAL MEcHANTcAL F]NAL FIRE DEPARTMENT slrE PLAN REVTEw BoARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot striping, etc. must be completed beforerequesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Buirding Divisionand posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE T CITY OF SPRINGFIELD, OREGO'V 225 PTFTE STREET SPRTNGFTELD, oREGoN 974 INSPECTION REQIIESTz 72 OFFICE: 726-3759 'o"t"_b"L3-- cl tl 1 OF rNsrAtr-atf m{z'dr 3z.l\ LEGAL DESCRIPTION OZ JOB DBSCRTFTION /so tRr-t-r.rT fuB ArB co,c>s:D.a }JEP- Permits are non-transferable and expire if vork is not started vithin 180 days of issuance or if vork is suspended for 180 days. 2. CONTRACTOR TION Y Electrical- Contracto Address Ci ty Phone Supervisor License Number 4o 3S The loltrowing prolccl et rubml[od ]! thc zoning, and doeo not rDqulro op€cllc ttrd cpprovel SLgcrRrcat PERr{rr APPLTcATToN 'u'-rrur'*o-tn1- city Job *r-o", ? ( oF ?7 ltPBIT]GFIELD COHPLETE FBE SCEEDUI^E BELOS A. Nev Residential-Single or MuIti.-Pamily per dvelling unit. Service Included: I tems Cos t $ 8s.00 $ 15.00 $ 40.00 Sum Expiration Date -gs Constr Contr. Number }.J/A Expiration Date Signature of Supervising Electrician Ovners Name Address L J..> 36 Th. Ci ty l NZ.F)6LD Phone 724 -4v,o 1-000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home or ModuLar Dvelling Service or Feeder Services or Feeders Installation, Alterations or Relocation: 200 amps or less 201 amps to 400 amps -401 amps to 600 amPs _ 601- amps to 1000 amPs- Over 1000 amps/vo1ts Reconnect Only 200 amps or less 201 amps to 400 amps -Over 40i- to 600 amps Over 600 amps or 1000 voT[ Branch Circuits Temporary Services or Feeders Installation, Alteration or Relocation a' '- B. c. D. ET- E ss0 $60 $ 100 $ 130 $300 $40 .00 .00 .00 .00 .00 00 lO*t $ 40.0 $ ss.O $ 80.0 s see ttB 0 0 0 " a5&E- OSNER TNSTALTATION The installation is being made on property I ovn which is not intended for sale, Iease or rent. Nev, Alteration or Extension Per Panel One Circuit i $ 35.00 j:'' Each Additional Circuit or vith Service or Feeder Permit $ 2.00 MiscelLaneous (Service/feeder not included) -Each installation Pump or irrigation Sign/Outline Lighting_ Limited Energy/Res SUBTOTAL OF ABOVE 52 State Surcharge 3Z Administrative Fee TOTAL Ovners Signature: $ $ s ) 40. 40. 20. 36. 00 00 00 00 d)5 DATE: RECEIVED B