Loading...
HomeMy WebLinkAboutPermit Building 1994-04-11COM M ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Springfield, Oregon 97477 SPRINGF]ELt, JOB NUMBER ?/a/> afr, LOCATION OF PROPOSED WORK:qa2 5e 5-45. INSPECTION LINE: 726-3769 OFFICE: 726-3759 ASSESSORS MAP:TAX LOT #>a NEW - REMODEL ADDITION DEMOLISH OTHER PHONE:zaz STATE:,rr, *7?2 , 24. vetur:Z4*',?* CITY: DESCRIPTION OF WORK: ADDRESS OWNER ARCHITECT CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE PLUMBING: MECHANICAL: trt tr^TElln^I NAME ADDRESS PHONE eGENERAL PLUMBING NO FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer f t. Backf low Device TOTAL PERMIT MECHANICAL NO FFF CHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent FaniSingle d uct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ LAND USE: ZONINGY OF UNITS: HANDICAP ACCESS: LIGHTING POWER BUDGET: WATER HEATER OCCY GROUP: * OF STORIES: QUAD AREA: + OF BLDGS: CONSTR. TYPEr HEAT SOURCE: SQ. FT,$/SQ. FT.VALUE rorAL vALUE oF pRoJEcr 26/ # X X X SQ. FTG MAIN SO. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY /€s- ra BUILDING PERMIT /7-sP PLU M BI NG DEMOLITION 5% State Su rcharqe 9.%5% State Su rcharge MECHANICAL FENCE VALUE $ 5% State Su rcharoe SIDEWALK FT. SUBTOTAL PERM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL 24 FLOOD PLAIN:- -- REQUIRED INSPECTIONS -I- It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call 226-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be made the following work daY. SITE INSPECTION: To be made after excavation, but prior to setuP of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel in Place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUN D: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing tre nc hes. UNDERFLOOR: PIumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or f loor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all the rough electrical, plumbing HIGH STRENGTH BOLTING: PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 t) During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.11 & Chapter 29) excavatinq complete and form work and sub-base material in place. GLU.LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7),fraz; W*zzW "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. X RooF sHEATHTNG AND iHXS^H'^,ti'TPf""X'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with OFIS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all Signature /Date times during co ctio /BA.YAVALIDATION /222.qAMOUNT RECEIVED: RECEIPT *:FTECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. AII project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this i nspection. FINAL BUILDING: Requested after the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE