HomeMy WebLinkAboutPacket, DIM PLANNER 11/15/2021DEVELOPMENT ISSUES MEETING FORM
APPLICANT: TTG Properties, LLC
MEETING DATE/TIME: Tuesday, December 14, 2021, 11:00 — 12:00
PLACE: DPW GenfeFenee Room 616ifill:6 Virtual via Microsoft Teams
CONTACT PERSON: Melissa Carifio
_X_ Current Planning Staff: L Miller, A Limbird, M Rust, D Larson, M Carrillo
Jeff Paschall, City Engineer, DPW
_X_ Kyle Greene, Managing Civil Engineer—DPW
Ken Vogeney, Emergency Manager (DPW)
_X_ Clayton McEachem, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
Kristi Krueger, Rincipal Engineer, Development & Public Works
_X_ Michael Lieb@. ler, Transportation Planning, Civil Engineer, Development Public Works
_X_ Gilbert Gordon, Deputy Fire Marshall 2, Fre & Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
Eric Adams, Planning, Willamalane Park and Recreation District
_X_ Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
_X_ Greg Miller, Springfield Utility Board (Water)
_X_ Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
_X_ Amy Chinitz, Springfield Utility Board (DWP)
Thomas JeRreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Willamalane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2planngr@odot.smte.or. us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities @. Operations; Springfield Public Schools
Safe Routes to School, Springfield Public Schools
_X_ Chris Carpenter, DPW Building Official
Rick Lewis, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, CenturyLink
Tom Boyatt, Community Development Manager, DPW
_X_ Jeff Paschall, AIC DPW City Surveyor
Sunny Washburn, Program Coordinator, Environmental Services
Sasha Vartanian, Lane County Transportation (Steve Gallup, cc only)
Tom Boyatt, Interim Development and Public Works Director
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Water Resource Coordinator, ESD
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Courtney Griesel, Senior Management Analyst (EDM)
Brenda Jones, Administrative Specialist (DIM Annexations)
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 86/88/2828
DEVELOPMENT ISSUES
MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITYHALL
225 FIFTH STREET
DPWC,onfermee Room 615,41
Meeting Date: Tuesday, December 14, 2021 11;00 — 12;00
1. DEVELOPMENT ISSUES MTG #811 -21 -000297 -PRE 811-21-000298-PROJ Troy and Tamara Goenel
Assessors Map: 17-02-31-00 TL 4000
Address: 30' Street
Existing Use: vacant parcel
Applicant has submitted proposal to construct new industrial office and warehouse with
associated site improvements
Planner: Melissa Carino
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserriche website: www.sorinafeld-or.Dovtweblink8tbrowse.asox
,A
!t
4"
41; J
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
SPRINGFIELD
W 0#/
Required Project Information (Applicant:
Prospective
Applicant Name: Troy and Tamara Goertel
complete this section)
Phone: 541.501.0207
Company: TTG Properties, LLC
Fax: tgoertel@tallpineinc.com
Address:40499 Mohawk River Road, Mohawk Oregon 97454
Prospective
Applicant's Rep.: Jordan Cogburn, Senior Planner
Phone: 541.687.1010 ex: 112
Company: TBG Architects+Planners
Fax: jcogburn@tbg-arch.com
Address: 132 E Broadway, Eugene Oregon 97401
Property Owner: Troy and Tamara Goertel
Phone: 541 501.0207
Company: TTG Properties, LLC
Fax: tgoertel@tallpineinc.com
Address:40499 Mohawk River Road Mohawk Oregon 97454
ASSESSOR'S MAP NO: 17-02-31-00
TAX LOT NOS :
4000
Property Address: Not Yet Assigned
Size of Property: Acres ® Square Feet ❑
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: New industrial office and warehouse building, with associated parking, landscaping and
site infrastructure. Site is currently undeveloped.
ExistingUse:
# of Lots Parcels: 1
Avg. Lot Parcel Size: 433560
sf
Densit : N/A du/acre
Prospective
Applicant:
%aeu_ Qean
Signa
Troy Goertel
Print
Case No.: Date:
Date: November 12, 2021
Reviewed by:
Application Fee:
Technical Fee: 0
Posta a Fee: 0
TOTAL FEES: $ PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
ARCHITECTS
+ P L A N N E R S
November 12, 2021
City of Springfield
Development Services
Planning Division
225 5'^ Street
Springfield, Oregon 97477
RE: Tall Pine 30th Industrial Development (202114/1.3)
Development Issues Meeting (DIM)
Project Address:
3T Street — Not Yet Assigned
Assessor's Map & Tax Lot:
Map 17-02-31-00 Tax Lot 4000
Developer:
TTG Properties, LLC
Troy & Tamara Goertel
40499 Mohawk River Rd
Mohawk, Oregon 97454
Contact: Troy Goertel
Tel 541.501.0207
E-mail: tgoertel@tallpineinc.com
Owner's Representative: TBG Architects+ Planners
132 East Broadway, Suite 200
Eugene, Oregon 97401
Contact: Jordan Cogburn or Kristen Taylor
Tel 541.687.1010
E-mail: jcogburn@tbg-arch.com or ktaylor@tbg-arch.com
PROJECT DESCRIPTION
The applicant is requesting a DIM for a project involving the following on an undeveloped site located
north of Main Street on North 30'^, Lane County Assessor's Map 17-02-31-00, Tax Lot 4000 (the "site").
The applicant is proposing to develop Tax Lot 4000, which will require Site Plan Review. The applicant
also owns the adjacent Tax Lot 4100, which is proposed to remain undeveloped with gravel resurfacing
and will be developed at a future time.
Tax Lot 4000 — Site Plan Review
• An approximately 9,828 -square -foot one-story with a mezzanine building with associated parking,
landscaping and site infrastructure.
• The front area of the building is proposed as an accessory office use with wood frame construction.
• The larger back area of the building is warehouse use with prefabricated metal building construction.
• The proposed building height is approximately 29'-6" in height.
541.687.1010 1132 EAST BROADWAY. SUITE 200 1 EUGENE. OREGON 97401 1 TBG-ARCH.COM
City of Springfield
November 12, 2021
Page 2 of 4
We request at a minimum, staff members from planning, transportation, fire, and public works to attend
the meeting. Please do not hesitate to invite additional staff members to attend the meeting in order to
adequately address the questions. In addition to the questions, we have enclosed a conceptual Site Plan
for reference only.
SITE INFORMATION
Location: The Tall Pine Industrial Development is located on North 3011 Street, Springfield, Oregon north
of Main Street.
Tax Lot: Lane County records identify the site as Lane County Assessor's Map 17-02-31-00, Tax Lot 4000.
The applicant also owns the adjacent Tax Lot 4100, which is not part of the proposed current development.
Acreage: The Tall Pine Industrial Development site is 1.0 acres or 43,560 square feet.
Address: Not yet identified — North 30h Street, Springfield, Oregon 97477.
Ownership: The site is owned by TTG Properties, LLC.
Plan Land Use Designation: The area of the subject parcel was annexed to the City of Springfield in
1948. The parcels are designated LMI in the Metropolitan Area General Plan. The parcels are located
within the Springfield Urban Growth Boundary (UGB) and City limits.
Zoning/Surrounding Land Uses: The applicant's parcels are zoned Light Medium Industrial (LMI). The
Drinking Water Overlay District applies to the subject parcels. Property to the west, north, and south are
zoned LMI and developed with industrial warehouse buildings. Properties to the east are zoned Medium
Density Residential and developed with a multi -family residential development. There is a railway line
located to the west of the site.
Environmental: The subject site is soil type Coburg -Urban land complex. Per the Flood Insurance Rate
Map (FIRM), the properties are located in area X determined to be outside of the 500 -year flood area.
The applicant's parcels are located in the Maia Wellhead facility protection area within the 5 -10 -year
Time of Travel Zone (TOTZ). As required, the applicant will apply and obtain either a Drinking Water
Permit or exemption prior to construction of the buildings.
Access: The primary access to the subject site will be via 30th Street. There is one existing shared
access driveway on the north end of the site that connects directly to 30th Street, which has a joint
use/access easement serving Tax Lots 4000, 4100, 4200, and 4300. A proposed driveway is shown on
the south end of Tax Lot 4000 that also connects directly to 30th Street.
City of Springfield
November 12, 2021
Page 3 of 4
DIM QUESTIONS (Questions in Bold)
1. Planning & Development:
• It is our understanding that the proposed tenant uses all fall under allowed industrial uses,
including those involved in the secondary processing of materials into components, the assembly
of components into finished products, transportation, communication and utilities, wholesaling,
and warehousing, as well as supporting offices and light industrial uses in the LMI zone.
Therefore, the project will need to comply with the associated development standards. See the
attached Site Plan, Parking Calculations for uses. Please confirm that this interpretation is
correct.
• Tax Lot 4100 is currently vacant with areas of pervious gravel and sparse vegetation. It is our
understanding that the proposed gravel resurfacing for this undeveloped lot will not require a land
use application or compliance with other development standards. Please confirm that this
interpretation is correct.
• It is our understanding that the only landscape requirements for this project is "5 percent of the
interior of a parking lot, exclusive of any required parking setbacks, if 24 or more parking spaces
are located between the street side of a building and an arterial or collector street and are visible
from any street" (per SDC 4.4-105(F)(2)). Therefore, only the proposed parking located in front of
the building is required to meet this standard. Please confirm that this interpretation is correct.
• Please outline the signage options.
2. Transportation:
a) It is our understanding that the proposed industrial project will not require a Transportation Impact
Study (TIS) for this project. Please confirm that this interpretation is correct.
b) The proposed driveway connection to 30th Street is about 30'-0" wide and the existing driveway
proposed to remain is 35'-0". The proposed and existing driveways to 30th Street have throat
depths on the site of about 40'-0" from the start of the driveway and at least 30'-0" from the
property line, both of which exceed the minimum 18'-0" standard. The northern driveway is
existing with a joint use/access easement serving Tax Lots 4000, 4100, 4200, and 4300. The
northern driveway approach is a dedicated driveway serving the site. The proposed site driveway
meets the City's dimensional requirements for commercial/industrial driveway approaches and is
consistent with separation spacing of previously approved driveways along 30th Street, a major
collector street. Are the locations acceptable? Are there any transportation studies
required?
3. Public Works:
a) Do the existing adjacent public facilities have adequate capacity to serve the proposed
development (water, sanitary sewer, and stormwater)?
City of Springfield
November 12, 2021
Page 4 of 4
b) Other than curb cuts, driveways, and associated sidewalk improvements as well as
street trees are there any other public improvements required as part of this
development?
c) Does the project meet the requirements for emergency vehicle access and circulation as
well as existing fire hydrant(s) capacity and access? Please explain.
d) Can the required on-site stormwater management facilities required for Tax Lot 4000 and
4100 (assuming the potential of there being two different owners in the future) be located
primarily on one of the Tax Lots as long as there are associated easements recorded?
Please explain.
4. In general, is City staff aware of any issues or concerns regarding the proposed project?
Thank you for your time and effort in clarifying these questions so that we can proceed smoothly with the
development of this proposed project.
Sincerely,
Jordan Cogburn
JC/KT
Enclosures: City of Springfield DIM Application Form — 1 copy
DIM Questions — 1 copy
Concept Site Plan — 1 copy
Assessor's Map — 1 copy
cc: Troy Goertel, TTG Properties, LLC.
Z TROJ=114 Tall Pine 3Mh Street I ndustrialkCorrespW gency\DIMk202ll4 DIM,docx