Loading...
HomeMy WebLinkAboutApplication APPLICANT 11/10/2021City of Springfield Development & Public Works 225 Fifth Street Springfield, OR 97477 Development Issues Meeting (DIM) SPRINGFIELD I& * Required Project Information (Applicant., complete this section) Prospective A licant Name: Amanda Steffanic Phone: 509-867-7786 x 114 Company: Wens ok Companies Fax: N/A Address: 503 E. 2nd Avenue, Suite B, Spokane, WA 99202 Prospective Applicant's Rep.: Robin Ersfeldt Phone: 708-203-8025 Company: Watermark Engineering Resources, Ltd. Fax: N/A Address: 2631 Ginger Woods Parkway, Suite 100, Aurora, IL 60502 Property Owner. 1950 Mohawk LLC Phone: 541- 99 Company: 1950 Mohawk LLC Fax: Address: 19 (Q'` JL1n&-k,0 l 541 1 Ofq7 qY 8r ASSESSOR'S MAP NO: ITAX LOT NO(S):_ 17-03-25-24-05500 Property Address: 1930 &1950 Mohawk Boulevard Size of Property: 1.38 Acres [2� square Feet ❑ Description of Demolish existing building located at 1930 Mohawk Boulevard and put up a new Wendy's restaurant Proposal: with drive-thru and parking. Existing Use: Restaurant # of Lots/Parcels: 1 Av . Lot/Parcel Size: N/A sf Der it : N/A du/acre Prospective Applicant: Date: Signa ure OO'' Pmanda J+�� adfif Print Case No.: Date: Reviewed by: Application Fee: Technical Fee: 0 Posta a Fee: $0 TOTAL FEES: $ PROJECT NUMBER: Revised 5/21/13 KL 1 of 3 Development Issues Meeting Process The purpose of a Development Issues Meeting is to give an applicant the opportunity to discuss his/her development proposal with the development review staff of the City. The discussion can be general or specific, depending on the details provided with the application. A Development Issues Meeting provides information to an applicant related to the current development conditions and standards of the City. The Development Issues Meeting is not a land use decision and does not confer any development rights, establish any conditions, or bind the applicant or the City to any course of action. The meeting conveys the status of known development opportunities and constraints. The status may change over time as development conditions or standards change. 1. Applicant Submits a Development Issues Meeting Application • The application must conform to the Development Issues Meeting Submittal Requirements Checklist on page 3 of this application packet. • Development issues meetings are conducted every Thursday. • We strive to conduct the development issues meetings within three to four weeks of receiving the application. • The applicant's proposal is circulated to the relevant staff in preparation for the meeting. 2. Applicant and the City Conduct the Development Issues Meeting • The applicant and any design team should attend the development issues meeting. • The meeting is scheduled for one hour. • Staff attending the meeting will be prepared to discuss the issues raised in the submittal by the applicant. Other issues raised during the meeting may also be discussed. • The meeting is informal and the City will issue no staff report. Revised 5/21/13 KL 2 of 3 Development Issues Meeting Submittal Requirements Checklist ❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development & Public Works Department. The applicable application, technology, and postage fees are collected at the time of complete application submittal. ❑ Development Issues Meeting Application Form ❑ Five (5) Questions - list specific questions the applicant would like staff to answer during the meeting. So that each question may be fully evaluated, the list is limited to five questions. ❑ Four (4) Copies of the Proposed Plan - suggested information valuable for staff to review the proposal is listed below. It is not necessary to include all of these items on the site or plot plan. However, applicants are encouraged to address as many as possible given that the level of information that will be derived from the meeting is commensurate with the level of detail provided in the application. Applicants are also encouraged to include additional information on the plan as listed in the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions & Subdivisions - Tentative Plan Submittal Requirements or 5.17-120, Site Plan Review Submittal Requirements. ❑ Drawn in ink on quality paper no smaller than 11" x 17" ❑ Scale appropriate to the area involved and sufficient to show detail of the plan and related data, such as 1" = 30', 1" = 50' or 1" = 100' ❑ North arrow ❑ Date of preparation ❑ Street address and assessor's map and tax lot number ❑ Dimensions (in feet) and size (either square feet or acres) of the development area ❑ Location and size of existing and proposed utilities, including connection points ❑ On-site drainage collection system and flow patterns, the size and location of drain lines and catch basins, dry wells, and natural drainageways to be retained ❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for common open spaces DIMS Related to Land Divisions ❑ Approximate location, number and dimensions of proposed lots ❑ How streets in the proposal area connect with existing streets DIMs Related to Site Plan Review ❑ Proposed and existing buildings: location, dimensions, size (gross floor area), setbacks from property lines, distance between buildings, and height ❑ Area and percentage of the site proposed for buildings, structures, driveways, sidewalks, patios and other impervious surfaces ❑ Parking and circulation plan Revised 5/21/13 KL 3 of 3 I have attached the completed application along with the proposed Site Plan. I have also included the survey for your reference. Items we are hoping to address as part of the meeting are listed below. My client will call and pay the application fee over the phone if you can let me know what number they should call. Let me know if there is anything else you need in order to get this scheduled. 1. Feedback on the site plan 2. What the permitting process for this project be/submittals/review and approval times, etc. 3. Requirements/approval process for any work done in the 1-105 right of way (just affects the southernmost parking stall area) 4. Utility connection points 5. Any specific building material or exterior finish requirements for the building Thank you! NRobin Ersfeklt EIT I Senior Project Designer/(Mice Manager 0:630-375-1500(125) C 708.203.5025 2631 Ginger Woods Pkwy Aurora, IL 60502 watermark-engineering.com I Linkedln