HomeMy WebLinkAboutStudies APPLICANT 11/3/2021380 Q Street, Ste 200 Springfield, Oregon 97477 (541)302-9790 kylemonis@ao-eng r corn A G O Engineering ULC Stormwater ReportA R INE Thurston Estates 8/41YpE Location: 7399 Thurston Road, Springfield, OR ddTT prepared W. Kyle MortGREG �is, PE mPE.�M�,.re Reviewed 6y: Scott MomKyle Morris, PE Morris, PE '4q'�R�,.��d LLQ Yt N � , F E M ic. Data 10/12/2021 FyPtr..r : 12�2ass Type of Yroiect: Residential Subdivision Project Overview The applicant is proposing to construct a 10 -lot single family residential subdivision south of Thurston Road on an approximate 2acre parcel. The subdivision will consist of publicly owned infrastructure including roadways, utilities and stormwater infrastructure. To accommodate stormwater runoff it is proposed to construct a stormwater pond within a tract to receive and process runoff from the new rights-of-way and driveways on each lot. The primary outlet for this pond will be infiltration however a new stonnline is proposed to be constructed as an overflow to the west, down Thurston Road and conned into an existing 15" stormline approximately 400 feet from the site access. To process runoff from the new single family roofs soakage trenches are proposed on each lot. Existing Conditions The existing site currently has some structures but mostly consists of grass cover and some scattered trees. The structures present are a single-family residence, a garage and some small sheds. The existing home and shed present on the future lot 1 is proposed to remain, other structures currently on- site are proposed to be removed. Web Soil Survey classifies on-site soils as Chapman -Urban Land Complex with a Hydrologic Soil Group rating of B. Per LIDAR elevation data the site has a very slight slope directed to the north towards Thurston Road. It is assumed existing runoff from the site sheet flows to the north during large storm events. Springfield requires post -construction peak flowrates be equal to or less than pre -construction peak flowrates. To analyze the pre construction peak flowrate from the site the following data will be utilized: Land Type/Description: Grassland with HSG rating of B Curve Number. 79 Infiltration Infiltration testing was performed by Branch Engineering on July 151 2021 and a geotechnical report was prepared on July 16' 2021 which includes the details of the testing and the results. The rate measured during the testing was 16.5 in/hour. To meet the 2014 Eugene Stormwater Management Manual requirements a design infiltration rate of 6 inlhourfor native soils will be utilized which provides a safety factor of 2.75 when compared with the measured rate. Since this test was performed during the summer, another infiltration test should be performed during the wet weather months (January or February) to verify the infiltration rate and check the groundwater depth. Branch Engineering's report is included with the appendix of this report. To be consistent with the requirements outlined in the 2014 Eugene Stommater Management Manual, a design infiltration rate of 2.5 in/hourwill be utilized for infiltration through imported soil growing mediums such as is proposed in the pond. Soakage trenches discharging directly into native soils can utilize the 6 in/hour design rate as discussed above. Proposed Destination The primary destination for stormwater runorf will be infiltration during more normal storm events. For larger design storm events a stormwater pipe is proposed to be installed down Thurston Road and connect into an existing 15" stormwater line about 400 feet west of the site access. This existing 15" stormwater line discharges into an existing swale north of Thurston Road right-of-way. The City of Springfield basin map shows the entire site is to drain to the north as proposed. Soakage Trenches are proposed to be installed for the single-family home roofs and thus stormwater runoff from there will be infiltrated. Post Constrmtion It is proposed to construct a publicly owned and maintained stormwater pond within a tract as shown on the plan. This pond would collect stormwater runoff from the new impervious rights-of-way on the site and the private driveways that slope from the house onto the streets. Each driveway was assumed to contribute approximately 500 square feet of impervious area that will drain into the public pond. In the table below physical characteristics of the proposed pond are summarized: Table 1: Pond Physical Characteristics Facility Bottom Depth Side Slopes Top Area Area [SF] [F7] [H:V] [SF] Water Quality Detention 128 3.5 3:1 1,510 Pond • Page 2 The pond will also have a 12" thick growing medium and a 12" thick rock chamber for storage. The growing medium is proposed under the entire facility and the rock chamber is proposed to cover an area of 564 Sf which is equivalent to the third contour of the pond shown on the plans. The total storage area the proposed pond provides is summarized in the table below: Table 2 Total Pond Storage Open Growing Rock Total Storage Medium (10% Chamber Storage (100%Voids) Voids) (35% Voids) 2,493 32 197 2,722 Hydraulic Calculations HydroCAD software was utilized to perform all hydraulic calculations. Below are parameters utilized in calculating the existing conditions peak flowrates leaving the site from the development area: Runoff Method: Santa Barbara Urban Hydrograph (SBUH) Area: 1.99 acres Curve Number. 98 Unconnected roofs 98 Impervious ROW Time of Concentration: 61.9 minutes (Details for this included with HydroCAD node report) Storm Type: Type lA 24 -hr Storm Events: Water Quality -0.83 inches 2 -Year Storm — 3.30 inches 25 -Year Storm — 4.80 inches To show detention requirements are met, both pre -construction and post -construction peak flowrates leaving the site were calculated. Those values are summarized in the table below: Table 3: Peak Flowmfes Summary Storm Existing Conditions Post Construction Event Peak Flowrate [cfs] Peak Flowrate [cfs] 2 -Year 0.29 0.14 25 -Year 0.63 0.19 As shown above, detention requirements are met as most stormwater runoff is proposed to infiltrate. Along With peak flowrates, hydraulic grade lines were analyzed to ensure no flooding occurs within the subdivision. Below is a table summarizing the pond elevations and outflow structure elevations. Table 4: Pond Elevations (al(numbers in units of Feet) 0 Page 3 Pond FL. 1.51n. Orifice 2In Orifice Pond Top 522.40 1 523.40 1 523.90 1 525.90 0 Page 3 Below is a table summarizing the calculated HGIs within the pond in comparison to the above pond elevations: Table 5. Calculated Pond HGLs Wat PT 2 -Year 25 -Year P ty 521.26 1 524.52 1 525.16 1 525.90 As shown in the above table, all stormwater is contained within the pond during the 25 -year storm, and thus won't cause any Flooding to habitable structures. Pollution Control As discussed, infiltration is proposed as the primary outflow during normal storm events. For single- family roofs it is proposed to construct soakage trenches thus providing complete infiltration. For the impervious roadways and driveways stormwater runoff will be routed through the proposed water quality detention pond. This pond will be vegetated to meet City of Springfield requirements. As shown in the tables above all stormwater is infiltrated during the Water Quality storm event as the peak HGL is below the lowest orifice. Conclusion The proposed stormwater system will meet City of Springfield requirements. Detention requirements will be met and pollution control also will be provided with the proposed infiltration and vegetation within the pond. The proposed system as modeled will not pose any public safety or health risks. Appendix • HydroCAD Report • Branch Engineering Site Infiltration Test Results • Stormwater Scoping Sheet 9 Page 4 12R O Discharge Pond Tract Impervious ROW 6S Existing Conditions Subcat Reach on Link Routing Diagram for Thurston Storm Analysis 0630@OYi Prepared by {enter your company name here}, Ported 10/12/2021 F7 CA s n 09993 ® 2020 HydmCAD Softam Solutions LLC Thurston Storm Analysis 06-30-2021 Prepared by {enter your company name here) Printed 10/12/2021 HydroCAD010.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pane 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration BIB Depth AMC Name (hours) (inches) I 01 -Wo Type IA 24 -hr Default 24.00 1 0.83 2 2 02-2 Year Type IA 24 -hr Default 24.00 1 3.30 2 3 03-25 Year Type IA 24 -hr Default 24.00 1 4.80 2 Thurston Storm Analysis 06-30-2021 Prepared by (enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 ® 2020 HydroCAD Software Solutions LLC Page 3 Area Listing (selected nodes) Area CN Description (acres) (subcatch ment-nu mbers) 0.103 98 Driveways (125) 0.549 98 Impervious ROW (12S) 1.990 79 Pasture/grassland/range, Poor, HSG B (6S) 2.642 84 TOTAL AREA Thurston Storm Analysis 06-30-2021 Prepared by (enter your company name here) Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pane 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 1.990 HSG B 6S 0.000 HSG C 0.000 HSG D 0.652 Other 12S 2.642 TOTAL AREA Thurston Storm Analysis 06-30-2021 Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 C 2020 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG -A HSG -B HSG -C HSG -D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 0.103 0.103 Driveways 12S 0.000 0.000 0.000 0.000 0.549 0.549 Impervious ROW 12S 0.000 1.990 0.000 0.000 0.000 1.990 Pasture/grassland/range, Poor 6S 0.000 1.990 0.000 0.000 0.662 2.642 TOTALAREA Thurston Storm Analysis 06-30-2021 Prepared by {enter your company name here) Printed 10/12/2021 HydroCAD010.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pane 6 Pipe Listing (selected nodes) Line# Node In -Invert Out -Invert Length Slope n Width Diann/Height Inside -Fill Number (feet) (feet) (feet) (ft(ft) (inches) (inches) (inches) 1 5P 521.48 520.94 180.0 0.0030 0.011 0.0 12.0 0.0 Thurston Storm Analysis 06-30-2021 Type M 24-hr 01-WQ Rainfall=0.83" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD® 10.10-5a s/n 04993 ® 2020 HydroCAD Software Solutions LLC Pace 7 Time span=0.00-32.00 hrs, dt=0.05 hrs, 641 points Runoff by SBUH method, Split Pervious/Imperv. Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment6S: Existing Conditions Runoff Area=1.990 ac 0.00% Impervious Runoff Depth>0.03" Flow Length=500' Tc=61.9 min CN=79/0 Runoff-0.01 cls 0.005 of Subcatchmentl2S: Impervious ROW Runoff Area=28,408sf 100.00% Impervious Runoff Depth=0.63" Tc=10.0 min CN=0198 Runoff=0.10 cfs 0.034 of Reach 12R: Discharge Inflow=0.00 cN 0.000 of Outflow=0.00 cfs 0.000 of Pond SP: Pond Tract Peak Elev=521.26' Storage=170 of Inflow=0.10 cfs 0.034 of Discarded=0.03 cis 0.034 of Primary=0.00 cfs 0.000 of Outflow=0.03 cfs 0.034 of Total Runoff Area = 2.642 ac Runoff Volume = 0.039 of Average Runoff Depth= 0.18" 75.32% Pervious= 1.990 ac 24.68% Impervious = 0.652 ac Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 01-WQ Rainfall=0.83" Prepared by {enter your company name here} Printed 1011212021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pace 8 Summary for Subcatchment 6S: Existing Conditions Runoff = 0.01 cfs @ 22.38 firs, Volume= 0.005 af, Depth> 0.03" Runoff by SBUH method, Split Pervious/Impew., Time Span= 0.00-32.00 hrs, dl= 0.05 hrs Type IA 24 -hr 01-WQ Rainfall=0.83" 61.9 500 Total Subcatchment 6S: Existing Conditions Xydrograph 0.007' „u=.r - --- - - - 1.990 79 100.00% Pervious Area 0.006 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (f /sec) (cfs) _Runoff Area=1.990-ac 52.4 300 0.0067 0.10 Sheet Flow, Runoff Depth>0�3" Grass: Dense n= 0.240 P2= 3.30" 9.5 200 0.0025 0.35 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos 61.9 500 Total Subcatchment 6S: Existing Conditions Xydrograph 0.007' - --- - - - Type IA 24 -hr- -- - 0.006 0'005 01-WQ Rainfall=0.83" 0.005 _Runoff Area=1.990-ac 0004 Runoff -Volume=0.005af 0.004- Runoff Depth>0�3" o. Flow Length=500'- 0.aa2 Tc=61.9 min 0M. CN=79/0 0.0m 0.001 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 19 20 21 22 23 24 25 26 27 28 29 30 Time (Imuml Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 01-WQ Rainfall=0.83" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD010.10-5a sIn 04993 @2020 HydroCAD Software Solutions LLC Paae 9 Summary for Subcatchment 12S: Impervious ROW Runoff = 0.10 cfs Cry 7.98 hrs, Volume= 0.034 af, Depth= 0.63" Runoff by SBUH method, Split Pervious/Imperv., Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Type IA 24 -hr 01-WQ Rainfall=0.83" Area (st CN Description 23,908 98 Impervious ROW 4,500 98 Driveways 28,408 98 Weighted Average 28,408 98 100.00% Impervious Area Tc Length Slope Velocity Capacity Description 5.0 0 Total, Increased to minimum Tc = 10.0 min Subcatchment 12S: Impervious ROW 0.14' 1.105: -omm -- - -- - -- - --- - 01 Type_ IA 24 -hr fm5 009 - 01 -WO Rainfai1=0.83" -------_:_.. _.--------_--- 6.os Runoff Area=2&,40&sf 00 - --- RunoffVolume=0.034af 006 Runoff Depth=0.83"- 1.055 - - - 0.05Tc--10.0-min1.045- _ 0.04 - -- — - - -- - CN=0/98 003- 1.025. 0.03. .015 001 5 6 7 8 9 10 11 12 13 14 15 16 17 1a 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Time (hours) Thurston Storm Analysis 06-30-2021 Type IA 24 -hr 01-WQ Rainfa#=0.83" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD® 10.10-5a $In 04993 ® 2020 HvdraCAD Software Solutions LLC Page 10 Summary for Reach 12R: Discharge Inflow Area = 0.652 ac,100.00% Impervious, Inflow Depth = 0.00" for 01-WQ event Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Allen= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Reach 12R: Discharge ■ oumow Inflow Area=0.652 ac 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 22 28 29 30 31 32 Tlme (hoar.) Thurston Storm Analysis 06.30-2021 Type /A 24 -hr 01-WQ Rainfall=0.83" Prepared by {enter your company name here) Printed 10112/2021 HydroCAD® 10.10-5a sin 04993 C 2020 HydroCAD Software Solutions LLC Page 11 Summary for Pond 5P: Pond Tract Inflow Area = 0.652 ac, 100.00% Impervious, Inflow Depth= 0.63" for 01-WQ event Inflow = 0.10 cfs @ 7.98 hrs, Volume= 0.034 of Outflow = 0.03 cfs @ 7.70 hrs, Volume= 0.034 at, Atten= 68%, Lag= 0.0 min Discarded = 0.03 cfs @ 7.70 hrs, Volume= 0.034 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Scor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Peak Elev= 521.26'@ 9.21 his Surf.Area= 564 sf Storage= 170 cf Flood Elev= 525.90' Surf.Area= 2,638 sf Storage= 2,722 cf Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 26.5 min ( 756.4 - 729.9 ) Volume Invert Avail.Storage Storage Description #1 522.40' 2,493 cf Open Storage (Irregular)Listed below (Recalc) #2 521.40' 32 cf Growing Medium (Irregular)Listed below (Recalc) 320 cf Overall x 10.0% Voids #3 520.40' 197 cf Rock Chamber (Irregular)Listed below (Recalc) 564 cf Overall x 35.0% Voids 2,722 cf Total Available Storage Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feel) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 522.40 128 61.0 0 0 128 522.90 238 87.0 90 90 436 523.90 564 127.0 389 480 1,126 524.90 995 159.0 769 1,249 1,868 525.90 1,510 183.0 1,244 2,493 2,543 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 521.40 128 61.0 0 0 128 522.40 564 127.0 320 320 1,120 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 520.40 564 127.0 0 0 564 521.40 564. 127.0 564 564 691 Device Routing Invert Outlet Devices #1 Discarded 520.40' 2.500 in/hr Exfihration over Surface area #2 Primary 521.48' 12.0" Round 12" Pipe L= 180.0' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 521.48'/ 520.94' S= 0.0030'1' Cc= 0.900 n= 0.011, Flow Area= 0.79 sf #3 Device 2 523.40' 1.5" Vert. 1.5" Orifice C= 0.600 Limited to weir flow at low heads #4 Device 2 523.90' 2.0" Vert. 2" Orifice C=0.600 Limited to weir flow at low heads #5 Device 2 525.40' 24.0" W x 24.0" H 180 24" Grate C= 0.600 Limited to weir flow at low heads Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 01-WQ Rainfall=0.83" Prepared by {enter your company name here} Printed 10/12/2021 HydroCADO 10.10-5a s/n 04993 ® 2020 HydroCAD Software Solutions LLC Pace 12 Discarded OutFlow Max=0.03 cfs @ 7.70 hrs HW=520.49' (Free Discharge) L1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Mx= a0.00 cfs @ 0.00 hrs HW=520.40' TW=0.00' (Dynamic Tailwater) L2-3' Pipe ( Controls 0.00 cfs) 3=1.5" Orifice ( Controls 0.00 cfs) =2" Orifice ( Controls 0.00 cfs) =24" Grate ( Controls 0.00 cfs) Pond 512: Pond Tract Inflow Area=0.6-$2-ac- :PDrertlry 011 - -- -- ° o;, Peak Elev=5211.26' ON - - Storage_170-cf 9.995 0.9e -- -- - -- - - 0.075. 0.07 v 0.085 - - - - - - ON - - - - �Oa85. am LL 0.045 oa4. 9.035 -- - - - 0.03 0.025. - - - - - 0.02 0.015 0.01 00- 0 0 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132 lime (wum) Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 02-2 Year Rainfall=3.30" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Page 13 Time span=0.00-32.00 hrs, dt=0.05 hrs, 641 points Runoff by SBUH method, Split Pervious/Imperv. Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Scor-Ind method Subcatchment6S: Existing Conditions Runoff Area=1.990 ac 0.00%Impervious Runoff Depth>1.41" Flow Length=500' T0=61.9min CN=7910 Runoff=0.29 cfs 0.234 of Subcatehmentl2S: Impervious ROW Runoff Area=28,408 sf 100.00% Impervious Runoff Depth=3.07" Tc=10.0 min CN=0/98 Runoff -0.48 cis 0.167 of Reach 12R: Discharge Inflow=0.14 cfs 0.028 of Outflow=0.14 cfs 0.028 of Pond 5P: Pond Tract Peak Elev=524.52' Storage=1,131 of Inflow=0.48 cis 0.167 of Discarded=0.11 cfs 0.139 of Primary=0.14 efs 0.028 of Outflow=0.25 cls 0.167 of Total Runoff Area = 2.642 ac Runoff Volume = 0.401 of Average Runoff Depth = 1.82" 75.32% Pervious = 1.990 ac 24.68% Impervious = 0.652 so Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 02-2 YearRainfali=3.30" Prepared by {enter your company name here} Printed 10/12/2021 HydroCADV 10.10-5a a/n 04993 02020 HydroCAD Software Solutions LLC Pace 14 Summary for Subcatchment 6S: Existing Conditions Runoff = 0.29 cfs @ 8.37 hrs, Volume= 0.234 af, Depth> 1.41" Runoff by SBUH method, Split Pervious/Imperv., Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Type IA 24 -hr 02-2 Year Rainfall=3.30" I.UWU 1a raslureigrasslanairange, Hoor, Fish t1 1.990 79 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) DLR 3UU u.Vuor U. IV unee[rlow, Grass: Dense n= 0.240 P2= 3.30" 9.5 200 0.0025 0.35 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos Total Subcatchment 6S: Existing Conditions os C 0,28 026 024 0.22 0.2 L 018 0.16 014 0.12 0.1 0.08 006 0.04 0.02 OD 0 1 2 3 4 5 6 8 `type IA 24 -hr 02-2 Year Rainfall=3.30_'- --Runoff Area=1.990 ac Runoff Volurrle=0.234 ai Runoff Depth>IAI"- Flow tength=500' Tc=61.9 min_ CN=7910 10 11 12 13 14 16 16 1 .. .., T 18 19 20 21 22 23 24 25 26 2J 26 29 3a 31 32 TI111G (hOV(S) ■ftunoR Thurston Storni Analysis 06-30-2021 Type /A 24 -hr 02-2 YearRainfall=3.30" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pace 15 Summary for Subcatchment 12S: Impervious ROW Runoff = 0.48 cfs @ 7.98 hrs, Volume= 0.167 af, Depth= 3.07' Runoff by SBUH method, Split Pervious/Imperv., Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Type IA 24 -hr 02-2 Year Rainfall=3.30" Tc Length Slope Velocity Capacity Description to minimum Tc = 10.0 min Subcatchment 12S: Impervious ROW Hvdmaraah 0.5 0.4.5 0.4 0.35 U 0.3 3o 0.25 n 0.2 0.15 0.1 0.05 a 0 1 2 3 4 5 6 7 0 910 1[ la 1 10 a IY 1V 11 GG L] GV 1] 1tl 11 Ztl 29 3u !1 32 Time hours) ■auno0 0.Yai Type IA 24 -hr 02-2 Year Rainfall=3.30" Runoff Area=28,40&sf Runoff Volume=0.167 of R-unoff Depth=3.OT' Tc=10.0 min CN=0/98 a 0 1 2 3 4 5 6 7 0 910 1[ la 1 10 a IY 1V 11 GG L] GV 1] 1tl 11 Ztl 29 3u !1 32 Time hours) ■auno0 Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 02-2 YearRaMWI=3.30" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pace 16 Summary for Reach 12R: Discharge Inflow Area = 0.652 ac,100.00% Impervious, Inflow Depth= 0.57' for 02-2 Year event Inflow = 0.14 cfs @ 8.42 hrs, Volume= 0.028 of Outflow = 0.14 cfs @ 8.42 hrs, Volume= 0.028 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Scor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Reach 12R: Discharge Xydmgraph 0.15 '- _ __ - -. ____ _ Ma - D.14 - " - -Inflow -Area=fL652-ac 0.13- - - _---- -- -" D.ts 0,11 0.1 0.09 0.08 -- - - - -- - 0 0.07 LL 0.06- oas. 0.04 0.03 Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 02-2 Year Rainfall=3.30" Prepared by {enter your company name here) Printed 10/12/2021 HydroCAD010.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pane 17 Summary for Pond 5P: Pond Tract Inflow Area = 0.652 ac,100.00% Impervious, Inflow Depth= 3.07" for 02-2 Year event Inflow = 0.48 cis @ 7.98 hrs, Volume= 0.167 of Outflow = 0.25 cfs @ 8.42 hrs, Volume= 0.167 af, Atlen= 48%, Lag= 26.5 min Discarded = 0.11 cis @ 8.42 hrs, Volume= 0.139 of Primary = 0.14 cis @ 8.42 hrs, Volume= 0.028 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Peak Elev= 524.52'@ 8.42 hrs Surf.Area= 1,943 sf Storage= 1,131 cf Flood Elev= 525.90' Surf.Area= 2,638 sf Storage= 2,722 cf Plug -Flow detention lime= 72.0 min calculated for 0.166 of (100% of inflow) Center -of -Mass det. time= 72.1 min ( 742.7 - 670.6 ) #1 522.40' 2,493 cf Open Storage (Irregular)Listed below (Recalc) #2 521.40' 32 cf Growing Medium (Irregular)Listed below (Recalc) Wet.Area 320 cf Overall x 10.0% Voids #3 520.40' 197 cf Rock Chamber (Irregular)Listed below (Recalc) (cubic -feet) 564 cf Overall x 35.0% Voids 2,722 of Total Available Storage Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 522.40 128 61.0 0 0 128 522.90 238 87.0 90 90 436 523.90 564 127.0 389 480 1,126 524.90 995 159.0 769 1,249 1,868 525.90 1,510 183.0 1,244 2,493 2,543 Elevation Surf.Area Perim. Inc.Store Cum.Stom Wet.Area (feel) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 521.40 128 61.0 0 0 128 522.40 564 127.0 320 320 1,120 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Afea (feet) (sq -ft) (feet) (cubic -feet) (cubic -feet) (soft) 520.40 564 127.0 0 0 564 521.40 564 127.0 564 564 691 Device Routing Invert Outlet Devices #1 Discarded 520.40' 2.500 in/hr Exfiltration over Surface area #2 Primary 521.48' 12.0" Round 12" Pipe L= 180.0' RCP, rounded edge headwall, Ke= 0.100 Inlet/ Outlet Invert= 521.48'/ 520.94' S=0.00307 Cc= 0.900 n= 0.011, Flow Area= 0.79 sf #3 Device 2 523.40' 1.5" Vert. 1.5" Orifice C=0.600 Limited to weir flow at low heads #4 Device 2 523.90' 2.0" Vert. 2" Orifice C=0.600 Limited to weir flow at low heads #5 Device 2 525.40' 24.0" W x 24.0" H 18° 24" Grate C= 0.600 Limited to weir flow at low heads Thurston Stone Analysis 06-30-2021 Type (A 24 -hr 02-2 YearRarnfall=3.30" Prepared by (enter your company name here) Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Pace 18 Discarded OutFlow Max=0.11 cfs @ 8.42 hrs HW=524.51' (Free Discharge) t-1=Exfiltration (Exfiltration Controls 0.11 cfs) Primary OutFlow Max=0.14 cfs @ 8.42 hrs HW=524.51' TW=0.00' (Dynamic Tailwater) t2=12" Pipe (Passes 0.14 cfs of 4.46 cfs potential flow) 1.5" Orifice (Orifice Controls 0.06 cfs @ 4.94 fps) =2" Orifice (Orifice Controls 0.08 cfs @ 3.51 fps) =24" Grate ( Controls 0.00 cfs) Pond SP: Pond Tract ■ inaw oM� Inflow A rea=0.652- aic •° ■ Pnmery - Peak Elev=524.52' Storage --1,131 cf � 03l 0.25 OR LL 0.1 0 1 2 3 4 5 6 7 8 9 18 11 12 13 14 15 16 1718 19 20 21 22 23 24 25 26 Time fhours) Thurston Storm Analysis 06-30-2021 Type IA 24 -hr 03-25 YearRainfall=4.80" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 @2020 HydroCAD Software Solutions LLC Pace 19 Time span=0.00-32.00 hrs, dt=0.05 hrs, 641 points Runoff by SBUH method, Split Pervious/Imperv. Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment6S: Existing Conditions Runoff Area=1.990 ac 0.00%Impervious Runoff Depth>2.63" Flow Length=500' Tc=61.9 min CN=7910 Runoff --0.63 cfs 0.436 of Subcatchment128: Impervious ROW Runoff Area=28,408sf 100.00%Impervious Runoff Depth=4.56" Tc=10.0 min CN=0/98 Runoff=0.70 cfs 0.248 of Reach 12R: Discharge Inflow=0.19 cis 0.072 of Outflow=0.19 cfs 0.072 of Pond 5P: Pond Tract Peak Elev=525.16' Storage=1,753 cf Inflow=0.70 cis 0.248 of Discarded=0.13 cfs 0.176 of Pdmary=0.19 cfs 0.072 of Outflow=0.32 cfs 0.248 of Total Runoff Area= 2.642 ac Runoff Volume= 0.684 of Average Runoff Depth= 3.11" 75.32% Pervious= 1.990 ac 24.68% Impervious = 0.652 ac Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 03-25 Year Rainfall=4.80" Prepared by (enter your company name here) Printed 10/12/2021 HydroCAD® 10.10-5a s/n 04993 ® 2020 HydroCAD Software Solutions LLC Pace 20 Summary for Subcatchment 6S: Existing Conditions Runoff = 0.63 cfs @ 8.28 hrs, Volume= 0.436 af, Depth> 2.63" Runoff by SBUH method, Split Pervious/Imperv., Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Type IA 24 -hr 03-25 Year Rainfall=4.80" Area (ac) CN Description 1.990 79 Pasture/grassland/range Poor HSG B 1.990 79 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (f /ft) (ft/sec) (cfs) 52.4 300 0.0067 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 3.30" 9.5 200 0.0025 0.35 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos 61.9 500 Total Subcatchment 6S: Existing Conditions 0.7 _ _ _ ■RunWf 0.65 -- - - -- - --- - -Type [A 24 -hr 0.6 5.55- -Q3-25Yeal•Ranfatl=4.8p" 9.5 _ _ _ .Runoff Area=1.990ac 045 _ _ Runoff Volume=0.436 of °° Runoff Depth>2.63" 0.36 Flow Length=500' u 0.3 _ --Tc=61.9mirt- 0.25 0.2 - --- ----CW7910- 0.15- 0.1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Thurston Storm Analysis 06-30-2021 Type IA 24 -hr 03-25 Year Rainfall=4.80" Prepared by {enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s!n 04993 0 2020 HydroCAD Software Solutions LLC Paw 21 Summary for Subcatchment 12S: Impervious ROW Runoff = 0.70 cfs @ 7.98 hrs, Volume= 0.248 af, Depth= 4.56" Runoff by SBUH method, Split Perviousflmperv., Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Type IA 24 -hr 03-25 Year Rainfall=4.80" Area (sf CN Description ` 23,908 96 Impervious ROW 4,500 98 Driveways 28,408 98 Weighted Average 28,408 98 100.00% Impervious Area Tc Length Slope Velocity Capacity Description 0 Total, Increased to minimum Tc = 10.0 min Subcatchment 12S: Impervious ROW ■ RunoR 0.] TYPe IA -24 -hr 03-25 Year Rainfall=4.80" 03 OW Runoff Are&28,408 sf 06- Runoff volume=0.248 of Runoff Depth=4.56' LL o.35 Tc=10.O min 03 CN=0/98 or 0.15 0.1 0. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 15 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Time (hours) Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 03-25 Year Rainfall=4.80" Prepared by {enter your company name here} Printed 10/12/2021 HydroCA0010.10-5a s/n 04993 02020 HydroCAD Software Solutions LLC Page 22 Summary for Reach 12R: Discharge Inflow Area = 0.652 ac,100.00% Impervious, Inflow Depth = 1.32" for 03-25 Year event Inflow = 0.19 cfs @ 8.52 hrs, Volume= 0.072 of Outflow = 0.19 cfs @ 8.52 hrs, Volume= 0.072 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Reach 12R: Discharge M 0 1 2 3 4 5 fi ] 8 9 10 it 12 13 id 15 16 iZ 18 19 20 21 22 23 24 - _, ' - - - - ■In0ow 0.21 °"" -Inflow Area=0.652-ac os o,a 916. -- - ------ �- 015- _ - ---- -- 014 a,a' 012- - - _- - - - - 0.11 01" 0.09-- - o.ofi: - __ - ..-- - - - -- ..... 007 0.as 005- 0 M 0 1 2 3 4 5 fi ] 8 9 10 it 12 13 id 15 16 iZ 18 19 20 21 22 23 24 Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 03-25 YearRarnfall=4.80" Prepared by (enter your company name here) Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 ® 2020 HydroCAD Software Solutions LLC Paas 23 Summary for Pond 5P: Pond Tract Inflow Area = 0.652 ac, 100.00% Impervious, Inflow Depth = 4.56" for 03-25 Year event Inflow = 0.70 cfs @ 7.98 hrs, Volume= 0.248 of Outflow = 0.32 cfs @ 8.52 hrs, Volume= 0.248 af, Atten= 54%, Lag= 32.6 min Discarded = 0.13 cfs @ 8.52 hrs, Volume= 0.176 of Primary = 0.19 cfs @ 8.52 hrs, Volume= 0.072 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-32.00 hrs, dt= 0.05 hrs Peak Elev= 525.16'@ 8.52 hrs Surf.Area= 2,247 at Storage= 1,753 cf Flood Elev= 525.90' Surf.Area= 2,638 sf Storage= 2,722 cf Plug -Flow detention time= 79.5 min calculated for 0.248 of (100% of inflow) Center -of -Mass det. time= 79.7 min ( 741.4 - 661.7 ) Volume Invert Avail.Storage Storage Description #1 522.40' 2,493 cf Open Storage (Irregular)Listed below (Recalc) #2 521.40' 32 cf Growing Medium (Irregular)Listed below (Recalc) 320 of Overall x 10.0% Voids #3 520.40' 197 of Rock Chamber (irregular)Listed below (Recalc) 564 cf Overall x 35.0% Voids cf Total Available Storage Elevation SUrf.Area Perim. Inc.Store Cum.Store Wet.Area (feel) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -ft) 522.40 128 61.0 0 0 128 522.90 238 87.0 90 90 436 523.90 564 127.0 389 480 1,126 524.90 995 159.0 769 1,249 1,868 525.90 1,510 183.0 1,244 2,493 2,543 Elevation Surf.Area Perim. Inc.Store Cum.Store Wet.Area (feet) (sq -ft) (feet) (cubic -feet) (cubio-feet) (sq -fl) 521.40 128 61.0 0 0 128 522.40 564 127.0 320 320 1,120 Elevation Surf.Afea Perim. Inc.Stors Cum.Store Wet.Area (feel) (sq -ft) (feet) (cubic -feet) (cubic -feet) (sq -fl) 520.40 564 127.0 0 0 564 521.40 564 127.0 564 564 691 Device Routing Invert Outlet Devices #1 Discarded 520.40' 2.500 in/hr Exfiltration over Surface area #2 Primary 521.48' 12.0" Round 12" Pipe L= 180.0' RCP, rounded edge headwall, Ke= 0.100 Inlet/Outlet Invert= 521.48'/ 520.94' S=0.0030'/' Cc= O.900 n= 0.011, Flow Area= 0.79 sf #3 Device 2 523.40' 1.5" Vert. 1.5" Orifice C=0.600 Limited to weir flow at low heads #4 Device 2 523.90' 2.0" Vert. 2" Orifice C=0.600 Limited to weir flow at low heads #5 Device 2 525.40' 24.0" W x 24.0" H 18° 24" Grate C= 0.600 Limited to weir flow at low heads Thurston Storm Analysis 06-30-2021 Type /A 24 -hr 03-25 Year Rainfa/1=4.80" Prepared by (enter your company name here} Printed 10/12/2021 HydroCAD®10.10-5a s/n 04993 @ 2020 HydroCAD Software Solutions LLC Page 24 Discarded OutFlow Max=0.13 cfs @ 8.52 hrs HW=525.16' (Free Discharge) t-1=Exfiltration (Exfillration Controls 0.13 cfs) Primary OutFlow Max= -0.19 cfs @ 8.52 hrs HW=525.16' TW=0.00' (Dynamic Tailwater) 'L2=12" Pipe (Passes 0.19 cfs of 4.99 cfs potential flow) 3=1.5" Orifice (Otifice Controls 0.08 cfs @ 6.27 fps) =2" Orifice (Orifice Controls 0.11 cfs @ 5.22 fps) =24" Grate ( Controls 0.00 cfs) Pond 5P: Pond Tract Rom - Inflow /krea=0.652 ac 0.75 Peak Elev=525.16' o, 0.0 -- - �- - -Storage=1;753 cf 0.6- - - -. - - - - US E OAS - 00- a u 0.3 0.25 nes Rom July 16, 2021 Jed Truett Metro Planning, Inc. 846 A Street, Springfield, OR ied@metroolannine.com RE: SITE INFILTRATION TEST RESULTS 7399 THORSTON ROAD EUGENE, OREGON 97402 BRANCH ENGINEERING INC PROJECT NO. 21-412 Branch E-NIGINEERING: 5lnce ter, Branch Engineering Inc. (BEI) has performed infiltration testing in one hand -auger test hole located in the area of a proposed pond infiltration facility; see Infiltration Testing Map, Figure 1, for approximate location of the test. The purpose of our testing was to provide a site-specific infiltration rate for the design of on-site infiltration facilities for the disposal of stormwater generated from new impervious surface areas. Field Work and Site Description One approximately 8 -inch diameter hand -auger hole was advanced to a maximum depth of 42 - inches below ground surface (BGS) and pre -saturated with water on July 14, 2021. On July 1.5, 2021, a Falling Head Infiltration Test was performed in accordance with the 2014 City of Eugene Stormwater Manual. Infiltration testing of the 6 -inch diameter cased holes commenced for three successive trials with water added between each trial; field data is attached. At the time of testing, the site had one existing residence in the northern extent of the lot, with associated garages and storage buildings located throughout the property. The central and southern portions of the lot were unmaintamed, with tall unmoved grasses and vegetation growing on the majority of the property. soils The soil in the test hole was visually classified using the American Society of Testing and Materials (ASTM) Method 1-2488. Soil conditions at the location of Infiltration Test 1 (IT1) consisted of a topsoil horizon of soft, light brown silt with roots and gravel from approximately 0- to 4 -inches BGS, followed by a layer of loose medium brown clayey silt with medium plasticity from 4- to 36 -inches BGS. This was underlain by a layer of loose, tan -brown sandy silt from 36 - to 42 -inches BGS. The NRCS Web Soil Survey maps the site entirely as Chapman -Urban land complex (25). This soil unit is described as well drained and derived from alluvium from mixed sources. Field log summaries and nearby well logs are attached, indicating subsurface conditions are consistent with our observations. Groundwater Ground water was not encountered in the site borings, and a well log on the northeastern - adjacent property indicates static groundwater levels at 11 -feet below the surface; see attached well logs. A 5 -foot buffer is generally recommended between the bottom of the soakage trench and recorded static high groundwater level. p:503-779-2577 I www. branchen gi neering. com 7399 Thurston Road, Eugene BEI PN 21-412 Summary of Field Infiltration Test Results The results of our July 15, 2021 field testing are summarized below in Table 1. The hydraulic conductivity is based on the infiltration rates measured in the field and summarized on the attached Infiltration Testing Field Data. The rates shown below have no factors of safety applied and represent the slowest infiltration rate measured of the three trials. Table 1: Location Depth of Test Measured Rate of Hydraulic (In) Conductivity, k (in/hr) IT -1 42 16.5 Recommended Infiltration Design Rates Using the recommended factor of approximately safety of 2, a design infiltration rate of 8 in/hr is suggested for development on this site. Safety factors may be applied at the discretion of the designer and the 2014.City of Eugene Stormwater Manual. Conclusions Based on our field findings and infiltration testing results, disposal of stormwater via infiltration facilities on the site is feasible. If you have any questions regarding the test method, data analysis or design, please contact the undersigned. Sincerely, Brunch Engineering Inc, F9 #16,170�� OREGON 'P6SF'oT15, ygCA7. o�P FXPIRES:12/31/2021 Ronald Derrick P.E. G.E. Principal Geotechnical Engineer Attached: Figure -1 Infiltration Testing Map Infiltration Testing Field Data MRCS Site Soil Mapping Nearby Well Logs Branch Engineering, Inc anch INEERING� 1.ltoajera739 iauaaan Ruas Projat 7399 .7/15g 0 Rwd Etgm¢ Oregou TU W.jL9te Ifea,. 21 BD Rojed Wrmbs. LY912 1 eat 1-0 a adeRtiJ Falling H�aJ In fillratlon r �=neramlrIlhl Hzo fu®tratl®Test l lYWl l pse Ilhl.... Time (miu) Mu[ere(Ip) Rot a (lymlo) (N/hl) As Rate of Fall T 1(m ) stets i Hlameler(e 5 0 395 1dI Stand f He ht—(it) i8 2 400 20.0 025 iso Terlll. Nla, ", 42 5 41.5 As 050 30.0 Volvmc of Nater eRo,I al 2 10 438 16.3 0..15 220 Cloektlme at Ilan 12'.32 20 460 14.0 023 13.5 214 ASTAISWIT (MH mlu®tleat at l It1ol2 pae ffer rowa"" cp alar o [a wren F Time([mn) smfaae0o) (io) (wane, flag) Avg Rate of Fell T-2 m/br) Vomme of wait' Aaaea ail 1 0 30.0 21.0 Qot$ime 131W - 4L5 18.5 O.AI 300 10 43.3 16a 035 210 20 453 lab 020 12.0 165 WHIVatlon Tm(1 irial3 MIT,Depth oR Rote,Rate Iime fmlul Aurlee'n (ire (a) (la/mi, Ga/hr) A Rate of Pell T-4 R.Ala) Volume of watt, -1. ap 1 0 380 22.0 It.'Wme 1332i 239.0 21. OW 300 4 3Y5 295 025 ]50 to I 420 ]80 042 25.0 zo450 15.0 030 1a0 25 43.3 118 025 1'0 18.5 Rateco Wever Leiel Pell iraff, o s an �,nh m n m Soil Map—Lane County Area, Oregon (21-012 soil map) mono se � oam � sero mem servo maw a p f'�`�-': 1:1,llOSph �mApotrtl[(e5'x ll')SMN. '� p Nan p q N 0 15 3l ® 9p A o 0 `A 1W 3p Nap Grvk'aMn: NkU Mc[&II CVlrxm�NM®: NG581 Cb#Y :111MZ lOn NGS&1 Sim Natural Resources Web Soil Survey 7/13/2021 Conservation Service Nabonal Cooperative Soil Survey Pagel of3 � }� ! , �: �) f! \■ }!{_ )!*;!!; \ . (( / E §I;; ! �° !■ ! n .- r-=\ � !/ /\\)'I\!§! E \\\ \ ! J2 g d ! ! ,! ! , �: �) f! \■ }!{_ )!*;!!; \ . (( / E Soil Map—Lane County Area. Oregon Map Unit Legend 21412 soil map I�Sps Natural Resources Web Soil Survey 7/132021 i Conservation Service National Cooperative Soil Survey Page 3 of Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 25 118 Totals for Area of Interest Chapman -Urban land complex Salem gravelly silt loam 4.9 0.0 0.9 99.9% 0.1% 100.0% I�Sps Natural Resources Web Soil Survey 7/132021 i Conservation Service National Cooperative Soil Survey Page 3 of Map Unit Oescnpron: Chapman -Urban land complex ---Lane County Area, Oregon 25 soil description Lane County Area, Oregon 25—Chapman-Urban land complex Map Unit Setting National map unit symbol., 2360 Elevation: 300 to 1,000 feet Mean annual precipitation: 40 to 60 inches Mean annual air temperature: 52 to 54 degrees F Frost -free period: 165 to 210 days Farmland classification: Farmland of statewide Importance Map Unit Composition Chapman and similar soils: 45 percent Urban land. 40 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chapman Setting Landfomr: Stream terraces Landform position (three-dimensional): Tread Down-slope shape: Linear Across -slope shape. Linear Parent material., Alluvium from mixed sources Typical profile Hf - 0 to 8 inches: loam H2 - 8 to 42 inches: loam H3 - 42 to 50 inches: gravelly sandy loam H4 - 50 to 60 inches., very gravelly sandy loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Drainage class: Well drained Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 inlhr) Depth to water table., More than 80 inches Frequency oftloordng. RareNone Frequency ofponding. None Available watercapacity: Moderate (about 8.1 inches) Interpretive groups Land capability classification (irrigated): 1 Land capability classificabon (nonirrigated): 1 Hydrologic Soil Group., 8 Forage suitability group., Well drained < 15% Slopes (G002XY0020R) Othervegetative classification: Well drained < 15% Slopes (GCO2XY0020R) nr11 Natural Resources Web Soil Survey 7/13/2021 i Conservation Service National Cooperative Soil survey Page 1 of 2 Map Unit Description: Chapman -Urban land complex --Lane County Area, Oregon 25 soil description Hydric soil rafing. No Description of Urban Land Properties and qualities Slope. 0 to 3 percent Frequency of floor6ng. RareNone Interpretive groups Land capability classification(in'igated): Nonespecifed Land capability classification (nonirrigated): 8 Hydric soil rating: No Data Source Information Soil Survey Area: Lane County Area, Oregon Survey Area Data: Version 17, Jun 11, 2020 1� Natural Resources Web Soil survey 71132021 Conservation Service National Cooperative Soil Survey Page 2 of 2 �;�0� STATE OF OREGON - 1 WATER SUPPLY WELLREPORT (xwW' by W833 7" (1) OWNER: Well Nu N. Rick Maberry ❑&wy Wd ❑Cob). ❑A.Sar 1 -i (l `�D.mxfia ❑Carrimiwy ❑bli.MW ❑hrig.tim T KW ❑lnjxum❑Livuto& ❑0dw (5) BORK HOLE CONS] RVON: ■ ■ Sp.dd Camhu4an.ppm.4 ❑YWXN. D*ffi dCmp[dW %H A( _R ESp1.4wa.md ❑Ya. N. Type ApxuLL HOLE SEAL q.xw.. Fmx IN M.xrW P.am n e wpxw S 12 6" 30 60 Now wx wlplewW Me ❑A ❑B XC ❑D ❑S Omu Dnr.rnA p1eaW9am _ R m_ a MYerid GNwlphww#x. Rb a Si dg d (6) CASEWYLLNER. B4vwr Fran T. Daax sw Pwle We T ww ❑ ❑ ❑ ❑ Lbr ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 -i ■ M ■ ■ _ (E) WELLTESTS: SOBimwmbeslRg umelelemr Fow .g ❑Poop ❑Beilx C&4k ❑A.beim nda w w..a.w. d■wmd m �c 60 An Ib Tampexh.ed.d S7' Npth w ien R.WFm d _ Wm aw.w mdyaia dvwR ❑ W. By Whin DMeey atrusamxin weux m. xiWN. far iru.dW axv ❑Tm style ❑Sdty ❑Muddy ❑Odx ❑Cabral ❑Oahu DrWhdmra ORIGINAL - WBLLI.D.#r. 161AR STARTCARD# 126112 (9) bDCAnONOFWELLSy Ivyl MecelpHw: cmmy Lane Ledaw. L..®mdQ 4 TowmNp 17 N ar 3 02 Bat a Seaim i5 1/4 IN TULd SOD La Bio s.6diviix" sm Adbexdweu(x"mxna ) 7450 Thurston.._toad A 11 abalm lmd somas. Due 10/14/09 Avxeia.pxuue W. .par "Nue baB. nam (11) AO DgAawhidtvr .rR fa F. I Eg.m dFbWRete ISWL 70 80 25 11 (12) WELL LOO: Gmmd Moe In d. 1,K* Md mtlwm.m.ctloq ehxubq uemWmmme d WweR u i. wmptl.me MW Qega"wYea.epply well a..mutdm Rmdvd.. .d Wfi uxdeW i.fmvmmrNarw above r<txem tlx bratdmyimaWW4a mdheBet /1.1 _ . — WWcNm 1564 WWcNx 1553 COPY -CUSTOMER SPRINGFIELD DEVELOPMENT AND PUBLIC WORKS 1901 225 FIFTH ST REET OREGON SPRINGFIELD, OR 97477 PHONE 541.726.3753 FAX: 541.726.1021 www.springfield-or.gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK __ ----- —__------ —_____________—__ (Area belaw this line filled out by Applicant) (Please return to Clayton McF,aehem (a, City ofSprfrtgJield Development and Public Works, Far 4 736-1021, Phone 4 736-1036), email: cmceachern@springfield-oegov Protect Name: Thurston Road Subdivi cion Annlirant. A&O Engineering, LLC Assessors Parcel #: 17-02-35-00-02700 Date: 06/22/2021 Land Use(s): Single Family Residential Phone #: (541)302-9790 Project Size (Acres): 1.99 Fax #: Approx. Impervious Area: 1.5 acres Email: kylemoms@ao-enc .coni Project Description (Include a copy of Assessor's map): Construct single family residential subdivision with publicly owned roadways and necessary utilities. Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: It is proposed to construct new storm main along Thurston Road west of the site and connect into existing public storm piping/curb inlets at the northwest corner of the Elementary School (schematic attached). Proposed Stormwater Best Management Practices: Stormwater on-site is proposed to be collected via curb inlets and piping and treated via either street bumpout planters or common stormwater pond within tract. Design details to be dialed in once infiltration testing is completed. --------- (Area below this line billedow by theCity d Ref d t th A a!i ra) ------__— (At a minimum, all boxes checked by the City on the front and back ofthis sheet shall be submitted or an a lication to be complete for submittal, although other re « irements m,ry be necessa . Drainage Study Type (EDSPM Section 4.03.2) (Note. UH may be substituted for Rational Method) ❑ Small Site Study — (ace Rational Method for calculations) Mid -Level Development Study — lase Unit Hydrograph Method for calculations) ❑ Full Drainage Development Study — (use Unit Hydrograph Method for calculations) Environmental Considerations: E]❑HiWellhead Zone: 20 year time of travel n/a llside Development: ❑ Wetland/Riparian: ❑ Floodway/Floodplain:— ❑ Soil Type: 25 Chapman Hydrologic group n ❑ Other Jurisdictions ane oun y or � Downstream Analysis: in onRElnfiltration or detention used to limit V N/A runoff ❑ Flow line for starting water surface elevation: F-1Design HGL to use for starting water surface elevation: ❑ Manhole/Junction to take analysis to: � county portion of hThurston road Return to Clayton McEachern @ City of Springfield, email: cmceachern@springfield-or gov, FAX: (541) 776.1021 COMPLETE STUDY ITEMS a Rased upon she in/mvnatian prm'iJed ore the fit w of lhi.s sheet. 1he (ollmving repreceats a ,nminrum q1 n=hm is needed. jw an application to be enmplelefo, svlvnwal a-uh respect to dninagc: hwrer, er, this $fl shmdd nor be used it, net, ofthe Springfield De ,clapn'enr Code rSDCI or the Cm's EngirteeringDesign MarmaL Compliance with these rrquirentents does not constitute site approwl. Additional site speeific in1amialiotnam be required. ,Yate: Upau scoping.shretsubaunral ensure completed fora' bas been signed in the space prm'ided helou': InterLn Desi Standards!\Vater Quality (F:DSPM Chapter 3 Req'd N/A All non -building rooftop (N BR) impervious surfaces shall be pre-treated (e.g, multi-chambered catchbasin w/oil filtration medial for stotmwater quality. Additionally, a minimum of50%ofthe NBR impervious surface shall be treated by vegetated methods. Where required, Vegetative stornnvater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stomrwater Management Manual E]❑ For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stommater Management Manual (See2A.I). E] Fj IN smmnvatm weatment Swale is proposed, submit calculations'specifications for sizing. velocity, flow, side slopes, bottom slope. and seed mix consistent with City of Springfield or Eugene's Slormwnter Management Manual. E] E] Waiter Quality calculations as mprired in Section 3.03.1 ofthe EDSPM. All building rooftop mounted equipment, or other fluid containing equipment located outside of the budding, shall Lj ❑ Drainage Study prepared by a Professional Civil Engineer licensed in the state of Oregon. QF-1 A complete drainage study. as required in EDSPM SW.iou 4.03.1, including a hydrological study map. Calculations showing system capacity for a 2 -year norm event and overflow effects of a 25 -year storm event. E] ❑ The time of mncentration (TO shall be determined using a 10 minute start time fm developed basins. °This form shall be included as an attachment, inside the front cover, of the starmwarer study. " IMPORTANT.- ENGINEER PLEASE READ BELOW AND SIGN.' As the engineer of record, 1 hereby certify the above /required �'zterns�yanre c_omplem and included with the submitted stomtwater study and plan set. Signature r7" t " t9r��7` Date l° bi ja Form Version S: .lune 2015 A downstream drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). M ❑ Elevations of the HGL and now lines for both city and private systems where applicable. ❑ ❑ Design of Storm Systems (EDSPM Section 4.04). ❑ ❑ Flow lines, slopes. rim elevations, pipe type and sizes clearly indicated on the plan set. ❑ ❑ Minimum pipe weer shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 60,000 Ib load without failure of the pipe structure. ❑ Manoing's "n" values for pipes shall be consistent with Table 4-1 of the EDSP..All storm pipes shall be designed m achieve a minimum velocity of three 13) feet per second at 0.5 pipe full based on Table 4-1 as well. Other(Miseelieneous Existing and proposed contours, located at one foot interest. Include spot elevations and site grades showing how site drains. Private stormwater casements shall be clearly depicted on plans when private swrmwater flows from one property to anodrer- D 3mvIls shall not receive runoff from any surface w!o being treated by one or more BMPs; with the exception of residential buildingroofs (EDSP Section 3.03,4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: run'itw dea.smte.or.us/ivqluicluic-him for more information. F] [j [Mention ponds shall be designed to limit mnoff to pre -development rates for the 2 through 25 -year storm events. or infiltration °This form shall be included as an attachment, inside the front cover, of the starmwarer study. " IMPORTANT.- ENGINEER PLEASE READ BELOW AND SIGN.' As the engineer of record, 1 hereby certify the above /required �'zterns�yanre c_omplem and included with the submitted stomtwater study and plan set. Signature r7" t " t9r��7` Date l° bi ja Form Version S: .lune 2015