HomeMy WebLinkAboutPermit Plumbing 1998-09-09I{GFIELr}RESIDENTIAL
PERMIT APPLICATION
lnepcctlons: 72647A9
Office: 726-3759
JOB NUMBER
225 Fifth Street
Spri ng f teld, Oregon 97 477
LOCATION OF PROPOSED WORK:
ASSESSoFS uee: /?€7-A.eS -2/TAX LOT / 2aa
LOT BLOCK:SUBDIVISION
NEW
-
REMODEL ADDITION DEMOLISH OTHER
-=
PHONE:
STATE:ztP t€----
OWNER:
ADDRESS:
CITY:
DESCRIBE WORK:
MECHANICAL:
-
ADDRESS
CONST.
CONTRACTOR #EXPIBES 4, PHONECONTRACTOR'S NAME
ELECTBICAL:
GENERAL:
PLUMBING
r OF BDRMS:
_ OFFICE USE -
WATER HEATEFI:
* OF UNITS:ZONING CODE:
FLOOD PLAINQUAD AREA:
* OF BLDGS:
SECONDARY HEAT:
SQUARF. FOOTAGE:
OCCY GROUP:
* OF STORIES:
CONSTR. TYPE:
HEAT SOURCE:
To request an.lnspectlon, you must call 726-3769. Thls ls a24hour recordlng. All lnspections requested before 7:00 a.m. wlll be
made the same worklng day, lnspections requested after 7:00 a.m. wlll be macle the following work day.
REOUIRED INSPECTIONS
Temporary Electric Rough Mechanlcal - Prior to
cover.
Flnal Plumbing - When all
plumbing wgrl< is complete.
Slt€ lnspectlon - To be made
after excavatlon, but prior to
settlng forms.
Rough Electrical - Prior to Final Electrical - When all
electrical work is complete.cover.
Underslab Plumblng / Electrical /
Mechanlcal - Prlor to cover.Electrical Servlce - Must be
approved to obtain permanent
electrlcal power.
Final Mechanical - When all
mechanical work is complete.
Footlng - After trenches are
excavated.Flreplace - Prlor to faclng
materlals and framlng lnsp.
Final Building - When all
required lnspections have been
approved and building is
completed.Masonry - Steel locatlon, bond
beams, groutlng.Framlng - Prlor to cover.
Foundatlon - After forms are
erected but prlor to concrete
placement.Wall/Celling lnsulatlon - Prlor to
cover.
Underground Plumblng - Prior
to fllllng trench.Drywall - Prior to taplng
MOBILE HOME INSPE TIONS
Underlloor Plumblng/ Mechanlcal
- Prlor to lnsulation or decking.Wood Stovo - After lnstallation
Post and Beam - Prior to floor
lnsulatlon or decking.lnserl - After flreplace approvgl
and lnstallatlon of unlt.
Blocking and Set.Up - When all
blocklng ls complete.
Floor lnsulalion - Prior to
decklng.Curbcul & AJrproach - After
forms are erected but prior to
placement of concrete.
Plumbing Connectlons a When
home lras been connected to
water and sewer.
Sanitary Sewer - Prior to filling
trench.Electrical Connection - When
blocking, set-up, and plumblng
lnspections have been approved
and the home is connected to
the servlce panel.
Storm Sewer - Prior to filling
trench.
Sidewall< & Driveway - After
excavation is complete, forms
and sub-base materlal in place.
Water Llne - Prlor to filling
trench.
Strsot Trees - When all requlred
trees are planted.
Final - After all required
inspections are approved and
porches, skirting, decks, and
ventlng have been installed.
Rough Plumbing - Prior to
cover.
RANGE:
LAND USE:
E
tl
E
E
E
E
tl
tl
tl
E
4
fl
E
tl
tl
l-_l fence - Vvhen cofnpleted.
E
[-_l other
Lot faces
Lot sg. ftg.
Lot coverage
Topography
Total height
Lot Type
-
-
lnterior
-
Corner
-- Panhandle
-
Cul-de-sac
Se IS THE PROPOSED WORK TN THE -
HISTORICAL DISTRIfi, OR ON
THE HISTOBICAL REGISTER?
-
lf yes, this applicatlon must be slgned
arrd approved by the Historlcal
Coordinator prlor to permit issuance.
APPROVED:
PL.HSE GAR ACC
N
S
E
VALUE
(A)
Main
Carport
Garage
Total Value
Building Permit Fee
State Surcharge
Total Fee
X $/SO. FT.
BUILDING PERMIT
ITEM SO. FT.
.! i.
BUILDING VALUE, PLAN CHECK
AND BUILDING PERMIT
This permit is granted on the express condition that the said
construction shall, in all respects, conform to the Ordinance
adopted by the City of Springfield, including the
Development Code, regulating the constructlon and use of
buildings, and may be suspended or revoked at any tlme
upon violation of any provisions of said ordinances.
Receipt Number:-
Plans Reviewed By Date
Date Paid
Received By:
Plan Check Fee:
SYSTEMS DEVELOPMENT CHARGE (SDC)
(B)
Systems Development Charge is due on all undeveloped
properties within tlre City limits which are being improved.
ITEM
Fixtures
Residential Bath(s)
Sanitary Sewer
Water
Storm Sewer
Moblle Home
FEE
rL€2:/*
FT.
.2
fr.2-2(c)
-O
PLUMBING PERMIT
Plumblng Permit
State Surcharge
Total Charge
ADDITIONAL COMMENTS
MECHANICAL PERM!T
Furnace
Exhaust Hood
Vent Fan No ,
-Wood Stove/ lnsert/ Flreplace Unit
Dryer Vent
Mechanical Permit'
(D)
lssuance
State Surcharge
Total Permit
By slgnature, I state and agreg that I have carefully examlned
the completed application and do hereby certlfy that all
lnformation hereon iS true and correct, and I further cerilfy
that any and all work performed shall be done in accorrJance
with the Ordinanccs of the City of Sprlngfield, and the Laws
of the State of Oregon pertainlng to the work descrlbed
hereln, and that NO OCCUPANCy will be made of any
structure without permission of the Buildlrrg Safety Divislon.
I further certily that only contractors and erhployees who
are ln compliance with ORS 701.055 wlll be used on thls
proiect.
I further agree to ensure that all required lnspectioris are
reguested at the proper time, that each address ls readable
from the street, that the permlt card ls located at the front
Signature
I
Date
all times U
8Kr
property, and the a set of plans will remain
structlon
of the
on the
MISCELLANEOUS PERMITS
Mobile Home
State lssuance
State SUrcharge
Sidewalk
-
ft
Curbcut
-
ft
Demolition
State Surcharge
Total Miscellaneous Permits (E)
TOTAL AMOUNT DUE (excluding electricat)
(A,. B, C, Q and E Comblned)
REcErPr NUMBER ?t 7o
VALIDATION
?-
DATE PAID
AMOUNT RECEIVED
RECEIVED BY
€-7-2e
NAME OR COMPANY
JouRNAr.- oR JoB no. ?3 rt < I
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
/A t€L h/r c9o
LOCATION Z>+f {r u
DEVELOPMENT TYPE:oo
BUILDING SIZE:OT SiZ
1. STORM DRAINAGE
IMPERViOUS SQ. FT X $0.227 PER SQ FT. $
2. SANITARY SEWER-CITY
NO. OF PFU'S It X $47.14 PER PFU
(See Reverse Side)
3. TMNSP0RTATi0N
NO OF UNITS X TRIP RATE X COST PER TRIP
x x $475.32
Ft
$
X x $475.32 $
4. SANITARY SEI,\IER-MWMC
A. REIMBURSEMENT COST:
NO. OF FEU'S X
B. IMPROVEMENT COST:
NO. OF FEU'S X PER FEU
l4l^lMc CREDIT IF APPLICABLE (SEE REVERSE)
MhIMC ADMINISTRATIVE FEE
5. ADMINISTRATIVE FEES
BASE C
SDC Coord'inator
ATTACH 'A. tdPD
PER FEU s &--
$e-
<$
TOTAL-MI^JMC SDC
$ 10.00
$o-
SUBTOTAL (ADD ITEMS 1,2,3 & 4) $ </8 .
'+
TOTAL ABOVE) X .05 $.?Z
Date: ?-?-?tr
TOTAL SDC $ 5+4 .+:
$ f( %,(4
FIXTURE UNIT CALCUT ATION TABLET Number of New Fi>
(NOTE: For remodels, calculate on _ re NET additional fixtures)
NUMBER OF
FIXTURE TYPE NEW FIXTURES
Bathtub.....
Drinking Fountain
Floor Drain.
lnterceptors For Grease/Oil/Solids/Etc..
lnterceptors For Sand/Auto Wash/Etc..
Laundry Tub/Clotheswasher......
Clotheswasher - 3 Or More.....
Mobile Home Park Trap (1 Per Trailer).......
Receptor For Refrigerator/Water Station/Etc........
Receptor For Commercial Sink/Dishwasher/Etc..
Shower, Single Stall.....
Shower, Gang.
Sink: Bar, Commercial, Residential Kitchen..
Urinal, Stall/Wall...
Wash Basin/Lavatory, Single.....
Toilet, Public lnstallation
Toilet, Private.......
Miscellaneous:
TOTAL FIXTURE UNITS
rs X Unit Equivalent = Fixture Units
UNIT FIXTURE
EOUIVALENT UNITS
L-
--T
ead
2
1
2
3
6
2
b
6
1
3
2
1tH
2
2
1
6
4
CREDIT CALCULATION TABLE:Based on assessed value. lf improvements occurred after annexation date in table
calculate credits se arates
Credit for Parcel or Land Only lf Applicable
lmprovement (if after annexation date)
X$
(Rate X Assessed Value)x $_:
(Rate X Assessed Value)
. CREDIT TOTAL $
Rate per $1,OOOYear
Anne
Year
Annexed
Rate per $1,OOO
Assessed Value
1 980
1 981
1982
1 983
1 984
1 985
1 986
1 987
1 988
4.18
4.12
3.99
3.83
3.68
3.48
3.18
2.82
2.42
979 or before 1 989
1 990
1 991
1 992
1 993
1 994
1 995
1 996
1 997
$1.98
1.55
1 .15
o.96
0.83
o.67
o.52
0.38
o.21
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating purposes Onlyl
FIXUNIT.WPD IMPERVIOUS AREA : TOTAL LOT SIZE X RUNOFF COEFFTCTENT
(
u
-
L-
\
I