HomeMy WebLinkAboutPermit Mechanical 1986-09-22APPLICATION/PERMIT
225 Notth |th Street
Springfield, )regon 97477
Buildtng Diuiston
7 26-37 53
t!
SPFTINGFIELD
[,M,4";]
qQffi ' ,
"l,ili,tl
, 1,,atfi
4u{,"/-ot
QC
'I
Signed
Date:Q-? 2-?G
Scnitary saser capped et ptoperfu Lite
Septic tank pu:rped and fi.Lled trtth gra;sel
Final - h4ten abooe i.tene are canpleted
and uhen danoll ti.on is cotnplete o? atta,2-
ture mooed and. przmLses cleaneC up.
Le
Blocking otd Set-up
Plunbing eonnecti,ons -- aettet otd t'tatet
Electrical Ccnneeti.on - Bloeki,ng, set-up
and plunbing connections tntst be qptctted
before requeeting eleclrtcal inspection
Acceesory- Buitding
. r l.
Pinal - Aftet pct'ehee, ek|rting, deeks'
etc. a"e conpleted.
Page 1 of 2
Job Loeaticn:
Assessore Map #
Subdittision:
Otmer:
Addt,ess:
City:
Additian
Remodel
Date of
General
fi
Tas lat #
Le G & Muriel L. Pauls n
Phone
S rfn field OR zip: 91 47 7
Describe h'ot:k:
Iour Citg Desigruted Job Nunbet, fs:
nwxber,, job a&iress, type of i,nspeeli.cn
nunber. P.equests receis;ed befcne 7:00 en
Daad-<-(pi<
")2-8 lalue # gao_-
1d OR 7 477
TNSULATION /VAPOR BARRIER IIISPECTION :
To be nade after aLL insulaticn and
required oapor barrie?a dre in pl.a.ce
but before ary Lath, gApsun boatd or
rnLL couerina is applied, and before
ay tnsulation is eoncealed.
DRIWALL TNSPECTI)N: Tc be madeiliet ilT-6yuatTl.s in plaee,
but pt,ior to any taping.
IAASON!?L: Steel Loeation, bond
beone, grouttng or oerticals in
accordotce Ltith U,B.C. Section
2415.
1
It ie the reeponaibiLity of tle penrlt hold.et, to see that aLL inspections are nade at the F;?oper tine, that eceh cddtees is teaCnhle
fronr the stteet, and that the permtt catd ie Located at the front of the properta*Buitding Diuision appro'^ed plan shalt remain on tle Buildtng Site'at aLL' tilnes.-
Consttwction Lender
SITE INSPEC?ION:
eecauation, but
PROCEDUPE FOR INSPECTI2\\ R9QUEST:CALL726-3769(recorder) state your City designated job
ne.qucsted <znd w!:en gou uiLL be readg for inspection, contrdctors ob anners nctne and plnne
*-iLL be nade the sane dcg, ?equests mcde after 7:00 an urLLL be made the neat,aotking day,I aca
To be made aftet,
ptiot, tc set up of
FOOTfN} & FOUNDATICN: To be rnaCe;fie r tr;;;C;-a";;ieats ated and.
forms ate erected" but prior to
pouring ecnerete.
,]
I
l
decking.
--- ROUGH PLU(BIIIC. ELECTRTCAL & MECH-
I
untLL these anspeetlons ha0e beeTi
made and aooroued.
1 rrntpuct, t+.i.oo to placirg facingI *"1n;;;7" and before'fronin| l:n"pnl-
tion.
-1 ERutrur;: ttusL be requested after
) app"orr"L of rough plinbing, eiectni-
cal & neclnnical. ALL roofing' btaeing E ehittmegs, etc. rntst be
. eornpleted. llo acrk ia to be eon-
., cealed untiL this inspection has'been made anC approued.
forme
ANDERSLAB PLAMBING, ELECTRICAL &
lvtECHl-llICAL: Io be made before any
uork ie eottered.
UNDERGR)UUD PLUMEING, SEr,tER, W.4TER,
DRAIilAGE: Ta be nade prior to fil-Tfr-tGnches.
UTIDERFLOOR PLUI,IB ING & MECI|ANICAL :
of
fToor ineulation or deeking.
P)ST AND BEAM: To be made priot, toinstallation of floon insulation or
Kw After installation is
CURB & APPBCACH APPON: After fonns6'eZCAA-6ut nio" to pouring
con:rete.
SIDEWALK & DRIVEWAI: For aLL con-
;"et;n6@ uAEn street right-
ef-uaA, to be made atter aLL erca-
oating canplete & fotn wtk & sub-
base material in place.
IEfiCE: hrhen conplete -- PtouiCe
gatiei ot, mouable sectione through
P,U.E.
X ?tw')r,,,'",
,--:-
ect eonditiona, sueh as the installation of street trees" co,tpleti.on of the
' Landscaping, etc., truet be satisfied before the BUILDI\IG FINAL can be neqteeted.l
xl-l
FINAL PLUMBING
PINAL MECHANICAL
FINAL ELECTRICAL
ALL proj,
required
PINAL BUILDING: The Final Building Inepection mtet be requeated alter the Fi.nal Plwnbing
\_/ Eleatrieal, anC Mecharical Inspect:.ons have been made and approved.
*AT,L LIANHCL,ES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTIIETII TO BE I4,4DE r'.T NO COST TO CITY
I tlt
JOB NO.SOLAR A ESS REQ.-0 L-CO d
eat
Aceess
th
t
DT House
Lot Faces -Lot Sq. r@.
% of Lct Cooeraga
# of Stories
Total Height
Topography
Intericr
Corner
PanhandLe
CuL-de-sac
LCT ?YPE
--F
Building Vcllue & Permit
Th.ts petmit is.grante,d on the erp?ess eond.ition tlat the sciid.eonstntction
shall-, in all r:eapeets, conform'to the 1rdinanee edopted 6y the Citg of
Springfield, including the Zoning Crdinance, regulating the ccnstracticn
and use of buildings, and may be suspended or reuokeC at cnA time upon oic-
Lation of any prcuisione of said 1rdinances.
Value
TOTAL VALUE
?ee:
Date Paid:
FTC x
Signed:
S.D.C. 7.5 c
Building Perm[t
?otal Charges
State
Plumbing Perrnit i
No person slwll eonstntct, inetalL, alter or elwnge anA ned cr eristing
pltrnbing or drainage eyetan in uhole or in pant, unless eueh pereon is the
Legal possessor of a oalid pltunbez,'s License, eacept that a pe?aon ndA do
plwnbing uork to property uhich is otmed, Leased or operated by the appli-
cant.
N0.CIlARCE
*
Fietures
Residential (1 bath)
Scni Seuer
Plwnbing Penrit
State
Electricq I Perm it
llhere State La,s requires that the eleetrieaL uork be done by an Electrieal
Conl:raetor, the eleettical portion of thts permit srwll not be ualil untilthe Label has been signed by the ElectticaL Conttacto?.
*
Nau/Eetend Circuits
Set'uice
State
Iotal
oo
-- ENCROACHMENT --
N'M NC.CIIARCE
C
.U
Mechqnicol Permit
5 ,'o
Erhanst Hood.
Vcodstooe
Vent Fot
Permlt fssuanee
Mechanicel Penntt
Sec,tz,ltg Dzposit
Stotage
Mainten4nce
Permit
Cttybcut
Sidet:alk
Fenee
Mobile Hone
PLan Enanlnez,uaxe
Total
I HAW CAREFULLy nXAjtINED tle eornpleted applteation for permit, dnd. dohereby eertify that aLL information hereon ie ttae and. ebruect, and Ifurther certifg that any ard aLL uork perfozned slnll be done in aocor.-
danee urith the 1rdinanees of the city of springfield, and the Lae of the
Itat-9 ol -019gon p-ertaining to the uork ceseribicd herein, and ttut No occa-
::yl:_"rtl, u.::1: o! a1a- sttuctw,e uithout permiesion Ly ti" ai;tatrs DL-DLs7.n. r lu,the" eelt-ifu that only eontracT0rs md enplcgees uho are ineazpliance uith )RS ?01.7ss uiLL be"used on this [r"in,i't--"-"" -'
?-;"? -
|'u'!AL At"tOtlNT DUE: *30 ,60 Date
8b
*