Loading...
HomeMy WebLinkAboutPermit Building 1996-04-11CO M M E RCIAL/ IN DUST RIAL PERMIT APPLICATION 225 Fitih Street, Springfield, Oregon 97477 SPNINGFIELO JOB NUMBER INSPECTION LINE: 726.3769 OFFICE: 726-3759 tu*= LOCATION OF PROPOSED WORK ,4 l TAX LOT:.41a2>ASSESSORS MAP:/7-o2-2?^Z { NEW - REMODEL ,f ADDITION DEMOLTSH OTHER PHON E: STATE:ztP VALUE: a- 4 2 DESCRIPTION OF WORK: CITY: ADDRESS: OWNER: ARCHITECT: PLUM BI NG: MECHANICAL: NAME ADDRESS PHON E ADD RESS EXPI RES PHON ECONTRACTOR'S NAME ELECTRICAL: GENERAL: CONST. CONTRACTOR # PLUMBING NO.FEE CHARG E Single Fixture Relocated Bldg (new lix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NO FFF EHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stalionary evap. cool er Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ ZONING LAND USE HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATEB: * OF UNITS: OCCY GROUP: # OF STORIES QUAD AREA: C OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER ?-7,RCPT#PLAN CHECK FEE DATE BY BUILDING PERMIT ./5.*PLUMBI NG DEMO LITION 5% State Surcharqe rz 2l;5% State Su rc h arge M EC H AN ICAL FENCE VALUE $ 5% State Su rch are e SIDEWALK FT, SUBTOTAL PE RM ITS PAVI N G CURBCUT FT SYSTEMS D EV ELO PM ENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL 25.?{ REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.g269 (recorder), state your City designated.iob number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. : SITE INSPECT|ON: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBtNG, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. section 306 0f the state specialty code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & 6y the Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: ETDEDT A^E. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' - STRUCTURAL CONCRETE: ln prior to placing concrete.' / FRAMING: To be made after excess of 25oo P.S.l. (306 a.1) coNcRErE SLAB: ro be $:J;:lii[J'3['Jlfli,'X,? ," srRUcruRAL wELDS: made after all inslab building place aid all pipes,ihimneys Performed on the iob. \2722 f) service equipment, conduit, and vents are'complete and :i?X,?;""",",:il{!T ?[i:'::J :X? H::[i]iiil:,X'iJ;[3:1: [l?,:f;?E]?l*,'",o,]l]i^.in place but before any tightening operations. (306 concrete is placed. INSULATION & VApOR . a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barrlers are ln place but FIREPROOFING: U.B.C. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is pribr to covering or filling applied. S'EC,AL GRAD'NG, t re nc hes. ,NDERFL..R: p,umbins [:::,S""l^?m'J3[Ht"' ifiiJqiil-:ii''5Jh']T'"* electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH ANDTOR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. BOARD: To be made after all Certif icate by an approved lathing and gypsum board, agency, furnished to the city's posr & BEAM: To be made interiol and exierior, is in Building Division before priortolnstallationoffloorplacebutbeforeanybeamsareplaced'(2501U.Bc. insulation, decking or f loor plastering is applied or before STDS' 25-10'11)' sheathing. gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7\ VAPOR BARRIERS: To be made prlor to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. NAILING: Prior to installing erected but prior to placing any roof covering. concrete. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure iompliance with the Building, City or Development Code. stru ct By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertainlng to'the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. Signatu Date fu errth eto UNS re ahatgree re red n Squ oti Sn arepec UE atted hereq rop pe hat ro eme,ad resdp readS ab e mro h etreeSt,he ocat aed he ntro o eth dan hev,propert rovedpap SC of ansp rem nal on eh ate almdU VALIDATION '7,/o f<-RECEPT s. RECEIVED BY: DATE PAID: AMOUNT RECETVED: ?5:?5 FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested af ter the final plumbing, electricat, mechanical and Fire Department inspectlons are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY E tithatIS wil ?-: >-