HomeMy WebLinkAboutPermit Building 2000-02-09SPRINGFIELD
Paoe 1 of 2- TRANS*:01-0000526
DATE:FEE O? ?OOO
AllT RE[D: ? $ 61 .60
IHANEE:
[fiEHiER:004€n
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
225 North Fifth Street
Springfield, OR97477
Location Of Proposed Site: 1650 00028th St Spr
AssessorsMap#: 17032541
Lot: Block: Addition:
Job Number: 00-00229-01
Office:726-3759
lnspection Line: 726-3769
Tax Lot#: 00100
Subdivision:
ctrY oF SPRINGFIELD, OREGON
Owner: Springfield lndoor Soccer Corp.
Address: 1650 28th Street
Scope Of Work: Lease Space
add exit door
Phone Number:
City/State/Zip:
Alteration
541-744-2255
Springfield, OR97477
Value: $1,200
Contractor Type
GeneralContr
ElectricalContr
Contractor
Essex General Construction lnc
3764 W 11th Ave, Eugene, OR
97402-3010
Reynolds Electric lnc
2175W 2nd Ave, Eugene, OR
97402-7103
Registration #
54531
Expiration Date
11t10too
Phone
541-342-4509
541-343-7297172522t8t01
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Office Use
-
Land Use:
Zoning Code:
Bedrooms:
Range:
# Of Buildings:
Occupancy Group:
Heat Source:
Sq. Footage:
To request an inspection call the 24 hour recording at726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
working day.
Framing
Final Fire
FinalBuilding
Rough Electrical
Final Electrical
Required Inspections
-Prior to cover.
-When all Fire Department requirements have been met.
-When all required inspections have been approved and the building is complete
Electrical
-Prior to cover.
-When all electrical work is complete.
Buildinl
Job# 00-00229-91
Page2 ol2
Construction Types:
Occupancy Groups:
# Of Buildings:
# Of Bedrooms:
Handicap Access?
(sq.
Main:Accessory:
# Of Stories:
Current Units:
Census Code: Does not apply
Total:
Height (feet):
Proposed Units:
Fee Paid On Receipt# Value/Quantity Fee Amount
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
02t09t2000
02t0912000
02t09t2000
0000526
0000526
0000526
1,200 $21.00
$1.47
$.63
$23.10
Electrical
Branch Circuits WO Feeder or Service
State Surcharge For Electrical Permit
Electric Administrative Fee
Total Electrical
02t09t2000
02t09t2000
02t09t2000
0000526
0000526
0000526
1 $35.00
$2.45
$1.05
$38.s0
Grand Total
during construction
$61.60
A^r-n*
Date
Job# 00-00229-01
o2/tt/sE L0:22 SSOA 726 3689 SPFD DEY. SER
zoning, and does not require specific land
approval
Zoning
Date
Authorized Signature
@ oor
SPRIATGFIELO
225 YIFtg SlTEEf,
sPRIlrGEIErJr, ORgGOlr 97477
INSPBcfToN REQIIESI: 726-3769
OPEICE: 726-3759
EIACMTCAL PBRI{IT APPIJCAITON
City Job fiwberP ^222.2? ^ O/
CICI{PIJf,E PEB SCEEDI'I.E BBIOIT
Nev Residential-Single or
Hulti-Family per dvelling unit.
Service Included:Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or Portion
thereof
Each l{anuf 'd Hone. or
-l{odular 'Dvelling
Sertice or Peeder
$ 85.00
$ 15.00
$ 40.00
Servj.ces or Feeders
Ins tallation, Alterations
or Relocation:
1. TOCATION OT INSIALIATION/6€a -1-4'1'> '
3
A
IJGAL DESCRIErIOI/?2? Z€r/. .AA )@ Sum
Permits are non-transferablelf sork is not started uithin
of lssuance or lf vork is sus
180 days.
2. C0NmACTOR $lsf,ArulTroN
Electrical Contractor
Address
Ci ty
I Supervisor
I
cense Number
Expi ration Date C)t
Constr Contr. Nunber \faS}
Exp iration Date b
SigBature of Blectrlcian
Address /612 a
Ci ty . Phone
OgNER
AE}
nstallation is being nade on
rty I ovn vhibh is not intendedp
f,'or sale, lease or rent.
Orners Signature:
DATE:
Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps'r less S 40.00
over 4b1 to 6oo aups
-
S 8o.oo
0ver 600 amps or 1000Efts see ,Br aE-o-
Branch Circui ts ; ..
Nev, Alteration or Extension Per Panel
one Circuit t S 35.00 7A??Each Addltional
Cireuit or vith Service
or Feeder Pemit _ S 2.00
tliscellaneous (Service/feeder not included)
200 amps or less
201'an-ps to 400 anps
-401 amps to 600 anps
60tr anps to 10O0 anPs
0ver 1000 amps/volts
Reconnect Only
-Each installation
Pump or irrlgation
Sigir/Outline - Ligh t ing-
Limi ted Energ?/Res
Llmited EnergY/Conn
SUBTOTAL OF AEOVE
fZ sate Surcharge'32 Adninistrative Fee
TmAt
anfl expire
180 days
pepded for
.B
\
e_
c
E
$ 50.00
$ 60.00
$100.0Q
s130.00
$300.00s 40.00
The I
roPe s 40.00
$ 40.00
s 20.00
$ 36.00
5
C'TY OF OREGON
RBCEII/ED
tr -