Loading...
HomeMy WebLinkAboutPermit Building 1991-06-13CO M M ERCIAL/ I N DU ST RIA!- PERMIT APPLICATION 225 Fillh Street, Springfield, Oregon 97477 LOCATION OF PROPO ED ASSESSOBS MAP SPRINGFIELO zfr, - JOB NUMBER INSPECTION LIN E: 726-3769 OFFICE: 726-3759 , olL TAX LOT:-0 ,!/) -r{/ -270 1PHONE: l1'l* ?7/7 r-ZIP:STATE: 9( n2 At ql CITY: ADDRESS: OWNER VALUE:l/ADDITION DEMOLISH OTHER DESCRIPTION OF WOR NEW- REMODEL ARCHITECT: CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE PLUMBING: MECHANICAL: PHONEADDRESSNAME -7q/- / <oq G EN ERAL:/1/Dy'UZ-/ ELECTRICA PLUMBING NO.FEE CHARGE Single Fixture Relocated Bld (new fix. addtl s ) Water Service ft. Sanitary Sewer ft. Storm Sewer tt// Backf low Device TOTAL PERMIT MECHANICAL NO trFF EHA RGF Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler I Vent Fan/Sinole;;:;i'i;';,;'i s*.2) Vent f rom sys AC tem apart- or htg. Mechanical exhaust hood and duct Zuo.,/ .z-.7zize ,M*/s:e Permit lssuance $10.00 TOTAL PERMIT n a-# -45 - -"59&) LAND USE WATER HEATER * OF UNITS: LIGHTING POWER BUDGET: HANDICAP ACCESS: FLOOD PLAI ZONING: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPEr HEAT SOURCE: VALUESQ. FT.$/SQ. FT. TOTAL VALUE OF PROJ @ i X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE 5zz= BUILDING PERMIT 2?-:;b PLU MBI NG DEMOLITION 57o State Surcharoe /- /a 5% State Su rcharoe MECHANICAL ?**FENCE VALUE $ 5% State Surcharoe 1.zr SIDEWALK FT. SUBTOTAL PERMITS PAVI N G CURBCUT FT. SYSTEMS DEVELO PMENT l/../ . TOTAL PERMIT FEES EXCLUDING ELECTRICAL t SCJDa--,, REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726'3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be readyfor inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be madethe following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, butprior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNOERGROUN D: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ROUGH ptU+UA+*e; ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterlor, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owneri Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTU RAL CONCRETE: In excess of 2500 P.S.t. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 I) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.1'l & Chapter 29) cLU.LAM BEAMS: tnspection Certificate by an approved agency, furnished to the City,s Building Division before beams are placed. (2501 U.B.C. sTDS. 25-10,11). STRUCTURAL MASONRy: (306 a.Z) "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, Clty or Development Code. ^ ,, FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot striping, etc. must be completed beforerequesting this i nspection. X FINAL BUILDING: Requested after the final plumbing, electrical,mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until aCertificate of Occupancy has been issued by the Building Divisionand posted on the premises. -/ F.NAL ELEcrRrcAL, -L F,NAL ME.HANTcAL r' PLANS REVIEWED D^rE 6-/a-?/ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all DateSignature times during constru ton VALIDATION FBct sf . ?3 G-t'\-q t 2.o AMOUNT RECEIVED RECEIPT #RECEIVED BY: DATE PAID: ]- ADDITIONAL COMMENTS: € /zt qt