Loading...
HomeMy WebLinkAboutPermit Mechanical 1991-03-26ELE' JOB NUMBER q\DA@RESIDENTIAL PERMIT APPLICATION lnspections; 726-3769 Office: 726-3759 LOCATION OF PROPOSED WO ASSESSORS MAP: LOT: 225 Fifth Street Springfield, Oregon 97 477 TAX LOT BLOCK;SUBDIVISION PHONE:OWNER: ADDRESS: CITY:ZIP:STATE: DEMOLISH OTHER DESCRIBE WORK NEW- REMODEL ADDI tA-t ,l ADDRESS EXPI RES PHONECONTRACTOR'S NAME CONST. CONTBACTOR # MECHANICAI ELECTRICAL: GENERAL: PLUMBING SE_ 1',?11 Eq - oFFrc # OF BDRMS RANGE: r OF UNITS: LAND USE: ZONING CODE: FLOOD PLAIN WATER HEATER * OF BLDGS: QUAD AREA SECONDARY HEAT SQUARE FOOTAGE: CONSTR. TYPE: HEAT SOURCE: OCCY GROUP: # OF STORIES To request an inspection, you must call 726-3769. This is a24hour recording. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS l--l Temporary Electric t-___l Rough Mechanical - Prior to cover. Final Plumbing - When all plumbing work is complete. Site lnspection - To be made after excavation, but prior to setting forms. Rough Eleclrical - Prior to Final Electrical - When all electrical work is complete.cover, Underslab Plumbing/ Electrical / Mechanical - Prior to cover. Electrical Service - Must be approved to obtain permanent electrical power. Final Mechanical - When all mechanical work is complete. Footing - After trenches are excavated.Fireplace - Prior to facing materials and framing lnsp. Final Building - When all required inspections have been approved and building is Masonry - Steel location, bond beams, grouting. completed v Other Foundation - After forms are erected but prior to concrete placement.Wall/Ceiling lnsulation - Prior to cover. Underground Plumbing - Prior to filling trench.Drywall - Prior to taping MOBILE HOME INSPECTIONS Underlloor Plumbing/ Mechanical - Prior to insulation or decking. Post and Beam - Prior to floor insulation or decking.lnserl - After fireplace approval and installation of unit. Blocking and Set-Up - When all blocking is complete. Floor lnsulation - Prior to decki ng.Curbcut & Approach - After forms are erected but prior to placement of concrete. Plumbing Connections - When home has been connected to water and sewer. Sanitary Sewer - Prior to filling trench.Electrical Connection - When blocking, set-up, and plumbing inspections have been approved and the home is connected to the service panel. Storm Sewer - Prior to filling trench. Sidewalk & Driveway - After excavation is complete, forms and sub-base material in place. Water Line - Prior to filling trench. Rough Plumbing - Prior to cover. Street Trees - When all required trees are planted. Final - After all required inspections are approved and porches, skirting, decks, and venting have been installed. l r E E E E r tl E l--l Framing - Prior to cover. Wood Stove - After installation. E E r E l--l Fence - When completed. T r Lot faces Lot sq. ftg. Lot coverage Topography Total height Lot Type - lnterior - Corner - Panhandle - Cul-de-sac '< THE PROPOSED WORK IN THE HISTORICAL DISTRICT, OR ON THE HISTORICAL REGISTER? - lf yes, this application must be signed and approved by the Historical Coordinator prior to permit issuance. APPROVED: P.L,HSE GAR ACC N S E VALUE (A) X $/SQ. FT. Total Value Building Permit Fee State Surcharge Total Fee BUILDING PERMIT ITEM SQ. FT Main Garage Carport BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances. Receiot Number: Plans Reviewed By Date Plan Check Fee Date Paid Received By SYSTEMS DEVELOPMENT CHARGE (SDC) (B) Systems Development Charge is due on all undeveloped properties within the City limits which are being improved. ITEM Fixtu res Residential Bath(s) Sanitary Sewer Water Storm Sewer Mobile Home FEE (t) N0 FT. FT. PLUMBING PERMIT Plumbing Permit State Surcharge Total Charge ADDITIONAL COMMENTS Wood Stove/ lnsert/ Fi replace Unit Dryer Vent (D) O OO N0Vent Fan Mechanical Permit lssuance State Surcharge Total Permit MECHANICAL PERM!T Furnace Exhaust Hood By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information hereon is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I f urther agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front ti co the a set of Signat Date -76- duri of the property, on the site at al plans will remain tion. MISCELLANEOUS PERMITS Mobile Home State lssuance State Surcharge Sidewalk - ft Curbcut _ ft Demolition State Surcharge Total Miscellaneous permits (E) TOTAL AMOUNT DUE (exctuding etectricat)(A, B, C, Q and E Combined) SrlJ 3 VALIDATION RECEIPT NUMBER DATE PAID AMOUNT RECEIVED RECEIVED BY FT.