HomeMy WebLinkAboutPacket, DIM PLANNER 9/1/2021DEVELOPMENT ISSUES MEETING FORM
APPLICANT: Matt Hannigan, Les Schwab
MEETING DATE/TIME: Thursday, September 23, 2021, 1:30 — 2:30
PLACE: Virtual via Microsoft Teams
CONTACT PERSON: Drew Larson
Current Planning Staff: L Miller, A Limbird, M Rust,DSI r5 q, M Carino
Jeff Paschall, City Engineer, DPW
7 Kyle Greene, Managing Civil Engineer—DPW
_ Ken Vogeney, Emergency Manager (DPW)
Clayton McEachern, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
_ Kristi Krueger, Principal Engineer, Development & Public Works
L( Michael Liebler, Transportation Planning, Civil Engineer, Development & Public Works
Eric Phillips -Meadow, Deputy Fire Marshall 2, Fire & Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
_ Eric Adams, Planning, Willamalane Park and Recreation District
Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
_ Greg Miller, Springfield Utility Board (Water)
Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
Amy Chinitz, Springfield Utility Board (DWP)
Thomas Jeffreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Willamalane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2pla n mg r@odot. state. or. us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities & Operations; Springfield Public Schools
_ Safe Routes to School, Springfield Public Schools
Chris Carpenter, DPW Building Official
Rick Lewis, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, CenturyLink
Tom Boyatt, Community Development Manager, DPW
_ Jeff Paschall, AIC DPW City Surveyor
Y Sunny Washburn, Program Coordinator, Environmental Services
Sasha Vartanian, Lane County Transportation (Steve Gallup, cc only)
Tom Boyatt, Interim Development and Public Works Director
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Water Resource Coordinator, ESD
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Courtney Griesel, Senior Management Analyst (EDM)
Brenda Jones, Administrative Specialist (DIM Annexations)
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 06/08/2020
DEVELOPMENT ISSUES
MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITYHALL
225 FIFTH STREET
Meeting Date; 77im"day, September 23, 2021 1:30-2;30
1. DEVELOPMENT ISSUES MTG #811 -21 -000232 -PRE 811-21-000235-PROJ Les Schwab
Assessor's Map: 17-02-31-31 TL 4200, 4201, 4500, 4600, 4700, 4701, 4800 & 4900
Address: 3294 Main Street
Existing Use: Tire Store
Applicant has submitted proposal to remodel existing tire store.
Planner: Drew Larson
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserfiche website: www.springfield-or.gov/weblink8/browse.aspx
VICINITY MAP
811 -21 -000232 -PRE Development Issues Meeting
17-02-31-31 TL 4200, 4201, 4500, 4600, 4700, 4701, 4800 & 4900
3294 Main Street
Les Schwab
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
SPRINGFIELD
W 0#/
Required Project Information (Applicant: complete this section)
Prospective
Matt Hannigan an Applicant Name: 9 Phone: 541-416-5238
Company: Les Schwab Fax:
Address: 20900 Cooley Road Bend, OR 97701
Prospective
Suzannah Stanley
971-346-3808
Applicant's Rep.:
Phone:
Company: Mackenzie I
Fax:
Address: 1515 SE Water Ave Ste 100 Portland, OR 97214
Property Owner: Same as applicant
Phone:
Company:
Fax:
Address
1702313104200, 1702313104201,1702313104500, 1702313104600,
ASSESS R'S MAP NO: 1702313104700,1702313104701,1702313104800,1702313104900
Propert Address: 3294 Main Street
Size of ro ert: 157,742 SF 3.62 AC Acres Square Feet
Descrlp Ion of If you are filling in this form by hand, please attach your proposal description to this application.
Propos I: see attached letter
Existin Use: Tire store
# of Los Parcels: 8
Avg. Lot Parcel Size: N/A sf
Densit : N/A du/acre
Prospe ive
Applicant: /�/� August 26, 2021
Date:
Signature
Matt Hannigan
Print
811 -21 -000232 -PRE 08/31/2021
Case Noi. Date: Reviewed b
646
Applicat on Fee:
Technical Fee: 0
Posta a Fee: 0
646 811-21-000235-PROJ
TOTAL EES: $ PROJECT NUMBER:
Revised 5/21/13 KL 1 of 3
MACKENZIE.
August 27, 2021
City of Springfield
Attention: Development & Public Works
225 Fifth Street
Springfield, OR 97477
Re: L5027 Springfield OR Due Diligence - SD
Development Issues Meeting Request
Project Number 2210232.00
Dear Development & Public Works
Les Schwab Tire Center is planning a remodel of their existing store at 3294 Main Street. A Development Issues Meeting for a
project at this site was held in 2017 (notes enclosed), though the scope has since been reduced. This letter describes the project
and questions from the applicant team.
Site Information
The site area is approximately 157,742 SF (3.62 AC). The total existing parking and vehicular area is approximately 59,991 SF.
The total landscaping and open space area is 46,937 SF. There are currently 77 parking spaces including 3 accessible spaces.
The subject site currently contains three buildings totaling approximately 18,740 SF and three canopies totaling approximately
6,060 SF (24,800 SF total). Per the City's definition of "building," the canopy area is already considered building area.'
Proposed Alterations
The proposed project is a within -the -walls remodel, also infilling most of the existing canopy area. Exterior work will likely be
limited to refresh of materials and a potential entry enhancement. The tire wash station will be moved from outside the building
to inside. Accessible parking spaces may be moved around near the new entry as required by the building code. No changes are
proposed to other parking or paved areas, access points, trash areas, signs, utility connections, or stormwater.
We understand improvements will be required to 33rd Street but no right-of-way dedication will be needed. In the 2017 DIM,
staff stated that there is a 2004 improvement agreement on the Les Schwab lots which could be modified to limit the scope of
the frontage improvements to stop at the northern edge of the building (limits of the work) and no longer cover the full lot
frontage.
As no building area will be added with the remodel, it is expected that fire sprinklers will not need to be added. A fire alarm is
in place and will be updated as required.
During construction, Les Schwab will likely use temporary tents and/or trailers for customers and employees to use
' Building. Any structure used or intended for sheltering any use or occupancy.
03.224.9560 • F503.228.1285 • W MCx NZE.COM • RiverEast Center, 1515 SE Water Avenue,#100, Portland, OR 97214
oo.tar-a�o�e.shtetENGINEERING. a o.E Pa nw...auo..uuu ...uM.oEARCHITECTURE
M. G5ndOegonV�wangon-Satle w
City of Springfield
LS 015 Hood River Due Diligence - SO
Project Number 2210233.00
August 27, 2021
Page 2
PROCESS
We understand if only interior alterations are proposed, no Site Plan Review will be required and zoning compliance review will
be completed under the building permit. If the proposal includes an increase in building area with minor parking and site
improvements, the review would be completed through a Type II Site Plan Review (SPR) Modification since the site has
previously undergone an initial Site Plan Review in 20D4. However, enclosing the canopy should not be considered adding
building area.
QUESTIONS
1. The site abuts low-density residential zoning to the north. However, the project will be concentrated inside and on the
south side of the southernmost building, and will not impact the residential zone. If SPR Modification is required, please
confirm this project can be reviewed through a Minor SPR Modification.
2. Will a Drinking Water Protection review be required for this project, with its scope limited to enclosing building area,
changing an entry, and remodeling the interior?
3. Will the proposed scope of work require an oil water separator?
4. Wall/building signage is planned to be replaced on at least the main building and alignment building. The mansard
portion of the roof is anticipated to be removed on all portions of the building. Prominent locations will have a vertical
fascia at a similar proportion to the existing mansard. Will the vertical fascia be considered "wall" for the purposes of
sign mounting? Are the signage requirements calculated per building?
5. Please describe any landscape upgrades that may be required as well as the triggers. Will these be required for this
limited scope remodel project? Will the 10' landscaped setback be required between the building and 33rd Street even
if the remodel does not affect this area? Will maintenance of the existing stormwater facilities on lot 4200 be required
even if no increase in impervious area is proposed? Will maintenance of any other previously installed landscaping be
required? If so, what is involved?
Please contact me at sstanlev(amkcnze.com if you have any questions.
Si c rely, Inil/�Suzanny I�`---
Land Use Planner
Enclosure(s): Aerial Map
Block Plans
Alta Survey
2017 DIM Notes
c: Matt Hannigan— Les Schwab Tire Centers
Julie Bradshaw — Mackenzie
M.
LES SCHWAB #027
3294 Main Street
Springfield, Oregon
Legend
Subject Site
Parcels
cu roust ���
Nr,
nfi
Eugene
(Springfield AND 0
2010mi.oft OOOrpo t o
MACKENZIE.
P 306.790.9995 • F 306.709.5565 • W MCKNZE.COM
Logen Builtlin9.500 Vnion SL L,9565, 5eeL11e, W 98101
O pu MACKENZIE ALL R10—R-WEo
e«
o w
6o zzo
linch=60 feet
N
wxhdmnioxn
cu roust ���
Nr,
nfi
Eugene
(Springfield AND 0
2010mi.oft OOOrpo t o
MACKENZIE.
P 306.790.9995 • F 306.709.5565 • W MCKNZE.COM
Logen Builtlin9.500 Vnion SL L,9565, 5eeL11e, W 98101
O pu MACKENZIE ALL R10—R-WEo
i
----- -moi
I �
. EXISTING
DETENTION
FACILITY
I
I,
IIt
I
U
Z
O
I � m
JI
,liI
I
I
I
BUILDINGS,
MACKitiWIi., I C , Les Schwab #027 - Springfield
Les Schwab Tires 03/20/21
F �L
Parlun
Existing: 77 Spaces
Proposed: 77 Spaces
Existing: 3,583 SF
Proposed: 1,925 SF Option A
Proposed: 1,905 SF Option B
service BaVs:
Existing: 5Interior (Building B)
4 E derior (Building A)
Proposed: 9Interior
(4 Interior at Building A,
5Interior at Building B)
LEGEND
SHOWROOM
■ BACK OF HOUSE
SERVICE BAYS
WAREHOUSE
-------
PROPERTY LINE
- --
OVERHEAD
11
LIFT
NOTE: All structural elements in RED'
'Disclaimer: Identified structural elements are
based on existing facilities information provided
by Owner and non-destructive observations
only. Actual structural elements may differ from
those depicted.
EXISTING SITE PLAN AWO
® L1
EQUIPNENT
II 645 SF
❑ - WAREHOUSE
V
1389 SF
E _J
Gr7
EQUIPNENT
485 SF
TRAINING
109 SF
CUSTOMER_
_J LOUNGE
SERVICE 764 SF
11
BAYS
1700 SFL ACCESSIBLE UNISEX WAREHOUSE
D
895 SF
__U V5W
6 SF
SES
1161 SF (/\\\ ch
182 SF
BLOCK PLAN - OPTION A
1" - 1fylY'
OBJECTIVES
MET
NOT
MET
COMPROMISED*
Enclose Service Bays
X
��
SERVICE BAYS
Move Entry from Service
Bays
X
Upgrade Exterior Brand
X
Increase Operational
Efficiency
Upgrade Showroom /
Lounge
X
Add Service Bay Count
X
Improve Parking and Site
Circulation
Address Deferred
Maintenance
Eliminate Ofr-Site Storage
'IF COMPROMISED, SEE NOTES ON PLAN
PROS:
• Optimum bay depth, increased baywAdth
• Utilizes existing restroom plumbing with revision of
door placement and wall location
• Replacement of canopy structure allows far optimum
doorwidths
• Entrance remains in existing location
• Largest dedication space to sales and customer
lounge
• Manager and Trenng receive eDdenor windows
CONS:
• Not a prototypical layout
• Display walls furthest from sales and minimal site
lines to the back wall
•
New bays require relocation of structure and removal
of extenor wa l
pa,".typical intemet bar .and shape
Existing: 77 Spaces Existing: 5 Interior (Building B)
Proposed: 77 Spaces 4 Exterior (Building A)
Proposed: 9Interior
Shoxrcarrr (4 Interior at Building A-Nev,
Exalting: 3,583 SF 5 Interim at Building B - ExaEng
Proposed: 1,925 SF Condition)
LEGEND
SHOWROOM
------- PROPERTYLINE
■ BACK OF HOUSE
OVERHEAD
��
SERVICE BAYS
II 1�1 LIFT
■ WAREHOUSE
NOTE: All structural elements in RED*
*Disclaimer: Identified structural elements are
based on existing facilities information provided
by Owner and non-destructive observations
only. Actual structural elements may differ from
those depicted.
M AC I< E N Z I E , Les Schwab #027 - Springfield BLOCK PLAN - OPTION A A001Les Schwab Tires 062021
W
OBJECTIVES
MET
NOT
MET
COMPROMISED*
Enclose Service Bays
X
SERVICE BAYS
Move Entry from Service
Bays
X
■ WAREHOUSE
Upgrade Exterior Brand
X
Increase Operational
Efficiency
Upgrade Showroom /
Lounge
X
Add Service Bay Count
X
Improve Parking and Site
Circulation
Address Deferred
Maintenance
Eliminate Ofr-Site Storage
'IF COMPROMISED, SEE NOTES ON PLAN
PROS:
• Optimum bay depth, increased bayvddth
• Utilizes existing restroom plumbing with revision of door
placement and wall location
• Replacement of canopy structure allows far optimum door
widths
• Entrance remains in existing location
• Mlanagerreceivesmdenorvdndows
• Allows better space in Warehouse #2
• Display walls in front of Sal es area
CONS:
• Not a prototypical layout
• New bays require relocation of structure and removal of
extenorwal
• Customer lounge is compact
• Reduces floor area for equipment adjacent to service lifts
P�arldm: Service Bays:
Existing: 77 Spaces Existing: 5 Interior (Building B)
Proposed: 77 Spaces 4 Exterior (Building A)
Proposed: 9lntenor
Shoxroa (4 Interior at Building A-Nev,
Existing: 3,583 SF 5 lntenor at Building B - Existing
Proposed: 1,905 SF Condition)
LEGEND
SHOWROOM -------
PROPERTYLINE
■ BACK OF HOUSE
OVERHEAD
SERVICE BAYS
Imo'
LIFT
■ WAREHOUSE
NOTE: All structural elements in RED*
*Disclaimer: Identified structural elements are
based on existing facilities information provided
by Owner and non-destructive observations
only. Actual structural elements may differ from
those depicted.
M AC I< E N Z I E , Les Schwab #027 - Springfield BLOCK PLAN - OPTION B JI"�VVL
Les Schwab Tires OarM21