Loading...
HomeMy WebLinkAboutStudies APPLICANT 8/24/2021HORACE STREET APARTMENTSDRAINAGE STUDY July 27, 2021 SITE CHARACTERISTICS The subject properly is identified on County Assessor's Maps as 18-20-05-23-0204. It is located on the south side of Horace Street, east of Filbert Sl. The site is an open field and consists of about 0.74 acres. EXISTING HYDROLOGY The site is relatively flat and portions of the site drain to the north. PROPOSED HYDROLOGY There is approximately 18,204 square feel of impervious area that will be directed towards a filtration planter on site. The required size of the filtration planter was determined by the City of Eugene Stormwaler Surface Filtration/Infiltration Facility Sizing Spreadsheet and was sized for flow control. The required filtration planter is 1,450 square feel, with 1,589 square feel provided. Attached are the calculations. CONCLUSION Based on my calculations and the proposed drainage system is sized properly and will provide the necessary flow control. 20182410 OFFS ES, �o� PE'f' r OREGON J ti11.199h (VQ- /Vy �. FPS EXPIRES DEC. 31. 2021 ji1j.d.�— Stormwater Surface FiltrationAnfiltration Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type 1 A Rainfall Distribution City of Eugene Name: Horace St.2 Unit Apmtmr Address: Horace Impervious Area CN=l Sorinafield. OR [Zip Codel or: Anthony J. Fayreau TY: The Fmmeeu Group Date: 7/8/2021 Permit Number: Permit CatchmentlD: Entire Subdivision Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach. Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate calculations with the facility. The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF) =or infiltration facilities in Class A or B soils where no infiltration testing has been per romed use an infiltration rate of 0.5 in/for. For all facilities use a maximum soil infiltration rate of 2.5 in/hr for lommi/growing medium. loses'Ym' from the dmpdown loxes below next to the design standards requirements for this facility. Pollution Reduction (PR)Yes Flow Control (FC)j Yes Destination(DT) No 'Animiio-ationkciiiry rnuA1vrhsenas memr1l1Vrvem rroOcivsonmion 2qui2rrow Total Square Footage Impervious Area= =5 sgfl Total Square Footage Pervious Area= 14209 sqN Impervious Area CN=l 98 Flow Control Pervious Area CN=l 85 Total Square Footage of Drainage Area= 31925 sfi Time of Concentration Post Development= min Weighted Average CN=l 92 Pre�Development CN= 85 Time of Concentration Pre�Development= 10 min Tested Soil Initiation Rate= 1 rotor (Soo role 4) Destination Design=®iNhr Design Soil Infiltration Rate=Iin/hr Soil Infiltration Rate R uirement Rainfall De h Desi nStorm Stoma P011otlonlVuIlon 1.4inches Water Flow Control 3.6 inches Flood Control Destination I 3.6 inches Flood Control Facility Max. Ponding Depth in Stormwater Facility= Depth of Growing Medium (So ]/2]/2021-3:24 PM Facility Surface Facility Surface Pern Facility Bottom Facility Bottom Pern Ratio of Facility Area to Basin Vc Pollution Reduction-Calculation Results Peak Flow Rate to Stormwater Facility = 0.136 cfs Pik Facility Overflow Rate= 0.000 cfs Total Runoff Volume to Stormwater Facility 193] cf Total Overflow Volume= 0 cf Max. Depth of Stormwater in Facility= 2.0 in Drawdown Time= 02 hours Yes Facility Sizing Meets Pollution Reduction Standards? VES Meets Requirementof No Facility Flooding? VES Meets Requirement for Maximum of 18 Hour Drawdown Time? Flow Control-Calculation Results Peak Flow Rate to Stormwater Facility = 0.579 cfs Peak Facility Overflow Rate= 0.358 cfs Total Runoff Volume to Stormwater Facility= 718 cf Total Overflow Volume= 3297 cf Peak Off -Site Flow Rate Max. Depth of Sierra in Facility= in Filtration Facility Underdrain= 0.034 cfs Drawdown Timms hours Pre-Development Runoff Data Peak Flow Rate = 0.362 cfs Total Runoff Volume =1 5597 cf =Facility Sizing Meets Flow Control Standards? VES Meets Requirement for Post Development offsite flow less or equal to Pre-Development Flow? VES Meets Requirement for Maximum of 18 Hour Drawdown Time? Destination-Calculation Results Peak Flow Rate to Stormwater Facility = N/A cfs Peak Facility Overflow Rate= N/A cfs Total Runoff Volume to Stormwater Facility= N/A cf Total Overflow Volume= N/A cf Max. Depth of Stormwater in Facility- N/A in Drawdown Time= N/A lours N/A Facility Sizing Meets Destination Standards? =Meets Requirement of No Facility Flooding? L.2LAJMftt, Requirement for Maximum of 30 hour Drawdown Time? 7/0/2021-3:24 PM