HomeMy WebLinkAboutApplication APPLICANT 8/10/2021City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Site Plan Review
SPRINGFIRIM
I&
Application Type (Applicant. check
Site Plan Review Pre -Submittal: Major Site Plan Modification Pre -Submittal, ❑
Site Plan Review Submittal: Ma'or Site Plan Modification Submittal: ❑
Required Project Information (Applicant. complete this section)
Applicant Name: William A. Randall Phone: 541-344-3332
Company: Arbor South Architecture, PC
Email: bill@arborsouth.com
Address: 380 Lincoln Street, Eugene, Oregon 97401
Applicant's Rep.: William A. Randall
Phone: 541-344-3332
Company: Arbor South ArchitecturePC
Email: bill@arborsouth.com
Address: 380 Lincoln Street Eu ene Oreon 97401
Property Owner:
Phone: 541-746-2790
Com an NORTHWOOD CHRISTIAN CHURCH barbar
uttgnorthwoodchristim.org
Email:
Address: 2425 Harvest Lane, Springfield, Oregon 97477
ASSESSOR'S MAP NO: 17-03-25-11
TAX LOT NOS : 02300
Property Address: Mohawk Road and V Street Sprinkrfield, Oregon
Size of Property: 8.152 Acres ® Square Feet ❑
Proposed No. of
N/A
Proposed Name of Project: Northwood Christian Church
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Church Facility
Existing Use: Vacant
New Impervious Surface Coverage (Including Bldg. Gross Floor Area): sf
Si natures: Please sign and Drint Mour name and date in the aDDrociriate
Required Project Information (City Intake Staff.,
Associated Applications:
box on the next Que.
complete this section)
Signs:
Pre -Sub Case No.:
Date:
Reviewed by:
Case No.:
Date:
Reviewed by:
Application Fee: $
Technical Fee: $
Posta a Fee: $
TOTAL FEES: $
PROJECT NUMBER:
Revised 1/7/14 Id 1 of 11
Owner Signatures
This application form is used for both the required pre -submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process.
An application without the Owner's original signature will not be accepted.
The undersigned acknowledges that the information in this application is correct and
accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the
owner, the owner hereby grants permission for the applicant to act in his/her behalf.
I/we do hereby acknowledge that I/we are legally responsible for all statutory
timelines, information, requests and requirements conveyed to my representative.
Date:
Signature
I represent this application to be complete for submittal to the City. Consistent with the completeness check
performed on this application at the Pre -Submittal Meeting, I affirm the information identified by the City as
necessary for processing the application is provided herein or the information will not be provided if not otherwise
contained within the submittal, and the City may begin processing the application with the Information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a
complete application.
Date: 2 Aug 2021
Signaturle IN
Barbara Utt
Revised 1/7/14 KL 2 of 11
Site Plan Review Application Process
1. Applicant Submits a Site Plan Review Application for Pre -Submittal
• The application must conform to the Site Plan Review Submittal Requirements
Checklist on pages 4-7 of this application packet.
• A pre -submittal meeting to discuss completeness is mandatory, and pre -submittal
meetings are conducted every Tuesday and Friday, from 10:00 am - noon.
• Planning Division staff strives to conduct pre -submittal meetings within five to seven
working days of receiving an application.
2. Applicant and the City Conduct the Pre -Submittal Meeting
• The applicant, owner, and design team are strongly encouraged to attend the pre -
submittal meeting.
• The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division and is scheduled for 30 to 60 minutes.
The Planner provides the applicant with a Pre -Submittal Checklist specifying the items
required to make the application complete if it is not already complete, and the
applicant has 160 days submit a complete application to the City.
3. Applicant Submits a Complete Application, City Staff Review the Application and
Issue a Decision
• A complete application must conform to the Site Plan Review Submittal Requirements
Checklist on pages 4-7 of this application packet.
• A Type II decision, made after public notice, but without a public hearing, unless
appealed, is issued within 120 days of submittal of a complete application.
• Mailed notice is provided to property owners and occupants within 300 feet of the
property being reviewed and to any applicable neighborhood association. In addition,
the applicant must post one sign, provided by the City, on the subject property.
• There is a 14 -day public comment period, starting on the date notice is mailed.
• Applications are distributed to the Development Review Committee, and their
comments are incorporated into a decision that addresses all applicable approval
criteria and/or development standards, as well as any written comments from those
given notice.
• Applications may be approved, approved with conditions, or denied.
• At the applicant's request, the Planner can provide a copy of the draft land use decision
prior to issuing the final land use decision.
• The City mails the applicant and any party of standing a copy of the decision, which is
effective on the day it is mailed.
• The decision issued is the final decision of the City but may be appealed within 15
calendar days to the Planning Commission or Hearings Official.
Revised 1/7/14 Ia 3 of 11
Site Plan Review Submittal Requirements Checklist
NOTE:
• ALL of the following items MUST be submitted for BOTH Pre -Submittal and Submittal.
• If you feel an item on the list below does not apply to your specific application, please
state the reason why and attach the explanation to this form.
XX Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. Any applicable application, technology, and postage fees are collected
at the pre -submittal and submittal stages.
® Site Plan Review Application Form
® Narrative explaining the purpose of the proposed development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. The narrative should also include the proposed number of employees
and future expansion plans, if known. Density - if applicable, list the size of property
(acres), maximum allowable density and the density proposed.
® Copy of the Deed
® Copy of the Site Plan Reduced to 81/2"x 11", which will be mailed as part of the
required neighboring property notification packet.
® State or Federal Permits Required - The applicant must demonstrate that an
application has been submitted for any required federal or state permit and provide a copy
of the application upon request.
® Completed Attached Scoping Sheet
® Four (4) Copies of the Following Plan Sets for Pre -Submittal OR
Four (4) Copies of the Following Plan Sets for Submittal:
® All of the following plans must include the scale appropriate to the area involved and
sufficient to show detail of the plan and related data, north arrow, and date of
preparation.
® All plan sets must be folded to 61/2" by 11" and bound by rubber bands.
Please Note:
• These plans must provide enough information to enable the City to
determine that the proposed development is feasible, but are not
necessarily required to be detailed construction level documents.
• The City's Engineering Design Standards Manual, while not land use
criteria, may be used in whole or n part, by the City Engineer to determine
the feasibility of a proposed plan.
• Nothing herein should be interpreted as implying any requirement in
contradiction of Oregon Statute or Oregon Administrative Regulation.
Revised 1/7/14 KL 4 of 11
a. Site Assessment of Existing Conditions
® Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
® Vicinity Map
® The name, location and dimensions of all existing site features including buildings, curb
cuts, trees and impervious surface areas, clearly indicating what is remaining and what
is being removed. For existing structures to remain, also indicate present use, size,
setbacks from property lines, and distance between buildings.
® The name, location, dimensions, direction of flow and top of bank of all watercourses
and required riparian setback that are shown on the Water Quality Limited Watercourse
Map on file in the Development & Public Works Department
® The 100 -year floodplain and floodway boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment
or Letter of Map Revision
® The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development & Public Works Department
® Physical features including, but not limited to trees 5" in diameter or greater when
measured 4 '/3 feet above the ground (stands of more than five (5) trees may be
shown as a cluster with mix of trees species noted), riparian areas, wetlands and rock
outcroppings
b. Site Plan
® Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
® Proposed buildings: location, dimensions, size (gross floor area applicable to the
parking requirement for the proposed use(s)), setbacks from property lines, and
distance between buildings; measured setbacks shall be prepared by an Oregon
licensed Surveyor when minimum setbacks are shown.
® Location and height of existing or proposed fences, walls, outdoor equipment, storage,
trash receptacles, and signs
® Location, dimensions, and number of typical, compact and ADA parking spaces;
including aisles, wheel bumpers, directional signs, and striping. ADA routes from public
rights-of-way whall be designated including at grade connections
® Dimensions of the development area, as well as area and percentage of the site
proposed for buildings, structures, parking and vehicular areas, sidewalks, patios, and
other impervious surfaces
N7& Observance of solar access requirements as specified in the applicable zoning district
® On-site loading areas and vehicular and pedestrian circulation
® Access to streets, alleys, and properties to be served, including the location and
dimensions of existing and proposed curb cuts and curb cuts proposed to be closed
® Location, type, and number of bicycle parking spaces
® Note location of existing and planned Lane Transit District facilities (within '/1 mile)
Revised 1/7/14 Ia 5 of 11
Ni% Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces, recreational areas, and other similar public and semi-public uses
N7% Phased Development Plan - where applicable, the Site Plan application must include a
phasing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase. Phasing must progress in a defined sequence
addressing street connectivity between the various phases and accommodating the
logical extension of other required public improvements, including but to limited to,
sanitary sewer, stormwater management, water and electricity. The applicant must
clearly indicate which phases are proposed for approval under the current Site Plan
application and which are deferred to future review procedures.
c. Existing Improvement and Public Utilities Plan
® Prepared by an Oregon licensed Architect, Landscape Architect, Civil Engineer or
Surveyor
® Location and width of all existing easements
® Location, widths (of paving and right-of-way), and names of all existing streets, alleys,
dedications or other right-of-ways within or adjacent to the proposed development,
including jurisdictional status other than City. Indicate connection points for roof
drainage.
® Location and type of existing street lighting
® Location of existing and required traffic control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units, waterline backflow preventers and similar
public facilities
® Location, width, and construction material of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways, and trails
® Location and size of existing utilities on and adjacent to the site including sanitary
sewer mains, stormwater management systems, water mains, power, gas, telephone,
and cable TV. Indicate the proposed connection points. Detail must be proportionate
to the complexity of the proposed project.
® Show existing and proposed spot elevations or contours, and direction of drainage
patterns.
d. Proposed Grading, Paving, & Utilities Plan
® Prepared by an Oregon licensed Civil Engineer, except where noted below
® The approximate size and location of storm water management systems components
® Location, widths (of paving and right-of-way), and names of proposed streets, alleys,
dedications or other rights -of -ways within or adjacent to the proposed development
® Location and width of all proposed easements
® Location and type of proposed street lighting
® Information on existing slopes over 5% shall be prepared by an Oregon licensed
surveyor and be drawn with one foot contour interval lines; land with a slope over 10
percent shall be shown with 5 foot contour interval lines
Revised 1/7/14 Ia 6 of 11
e. Landscape Plan
® Prepared by an Architect, Landscape Architect, or other Landscape Professional
approved by the Director
® Location and dimensions of landscaping and open space areas to include calculation of
landscape coverage
® Where applicable, screening in accordance with SDC 4.4-110
® Location of existing and proposed street trees
f. Architectural Plans
® Where abutting residentially zoned properties, exterior elevations of all proposed
structures over 140 square feet for the development site, including height, shall be
shown
g. On -Site Lighting Plan
® Location, orientation, and maximum height of exterior light fixtures, both free standing
and attached
® Type and extent of shielding, including cut-off angles, and type of illumination,
wattage, and luminous area
Additional Materials That May be Deferred at the discretion of the applicant until
Final Site Plan or Building Permit Submittal:
® List in chart form the proposed types of landscape materials (trees, shrubs, ground
cover). Include in the chart genus, species, common name, quantity, size and spacing
® Where plants are proposed as part of the stormwater management system, a planting
plan shall be provided.
❑ Irrigation Plan showing of irrigation lines, required backflow preventers and above
ground utilities.
® Photometric test report for each light source.
® An applicant may submit conceptual floor plans in order to have staff address
Resolution of potential nuisance conflicts
Additional Materials That May be Required by the Director:
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE
APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS
DISCUSSED IN SDC 5.1-120:
® Copy of a Preliminary Title Report issued within the past 30 days documenting
ownership and listing all encumbrances.
N/[A] A developer may be required to prepare a Traffic Impact Study (TIS) to identify
potential traffic impacts from proposed development and needed mitigation
measures.
Revised 1/7/14 Ia 7 of 11
N/91 Where a multi -family development is proposed, any additional materials to
demonstrate compliance with SDC 3.2-240
N/® Riparian Area Protection Report for properties located within 150 feet of the top of
bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the
top of bank of any direct tributaries of WQLW
N/[P] A Geotechnical Report prepared by an engineer must be submitted concurrently if
the Soils Survey indicates the proposed development area has unstable soils and/or
a high water table, or if required by the City Engineer
N/® Where the development area is within an overlay district, address the additional
standards of the overlay district on plans and narratives
N/[A] Where physical aspects of a proposed development, including but not limited to
scale, odor noise, glare or vibration, will impact less intensive surrounding uses,
the Director may request submittal of conceptual floor plans or other information
necessary to determine compliance with applicable standards.
N/[P] If five or more trees are proposed to be removed, a Tree Felling Permit as specified
in SDC 5.19-100
N/[P] A wetland delineation approved by the Oregon Division of State Lands must be
submitted concurrently where there is a wetland on the property
N/® The applicant must demonstrate that an application has been submitted for any
required federal or state permit and provide a copy of the application upon request
N/[] Where any grading, filling or excavating is proposed with the development, a Land
and Drainage Alteration permit must be submitted prior to development
IN /Z] Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100
and 5.21-100
N/® An Annexation shall be submitted prior to submission of application, as specified
In SDC 5.7-100, where a development is proposed outside of the city limits but
within the City's urban service area and can be served by sanitary sewer
Revised 1/7/14 Ia 8 of 11
380 LINCOLN STREET
Srg.m. Orvgen 97401
541-344-3332
www.arborsouth.com
14 June 2021
NORTHWEST CHRISTIAN CHURCH I MARCOLA ROAD &V STREET,
SPRINGFIELD, OR I SITE PLAN REVIEW I NARRATIVE
17-03-25-11-02300
Following is the narrative related to the above Site Plan Review.This narrative accompanies
the drawings also related to the Site Plan Review.
GENERAL REQUIREMENTS I SDC S.17 -120(A)
The attached Site Plan (sheet A01) contains the bulk of the information requested in this
section. Existing wood and chain link fences run across the northern portion of the west
property line and the entire north property line, providing adequate screening from
residential as required by SDC 4.4-110.
The proposed facility anticipates a maximum of 25 to 30 employees on-site.The only future
expansion plan being considered is a 3,200 SF building on the west side of the site across
the slough. Solar Access requirements do not apply in the MUC Zone (SDC 5.18-105) and
no area is being conveyed, dedicated or reserved for common open spaces: the playground,
picnic area and amphitheater are all dedicated for church use.All other requested
information is contained on the drawings.
SITE ASSESSMENT I SDC S.17-120(6)
The overall Site Assessment is found in the attached drawings from The Favreau Group
(sheet C 1).
ACCESS, CIRCULATION AND PARKING PLAN I SDC S.17 -120(C)
The requirements of the Access, Circulation and Parking Plans are conveyed on our Site Plan
(sheet A01). Exterior lighting is noted on the attached lighting plan from Builders Electric,
Inc. (sheet E01). There are no existing or proposed transit facilities on the site, but there is
an existing LTD transit stop approximately 85 -feet west of the site.A Right -of -Way
Approach Permit and Traffic Impact Study are not required.
LANDSCAPE PLAN I SDC S.17 -120(D)
The Landscape Ran, provided byThe Satre Group, is attached (sheet 1100). All requested
information is included on that sheet.
IMPROVEMENTS PLAN I SDC S.17 -120(E)
The Improvements Plan is found in the attached drawings from The Favreau Group (sheets
C1, C2 and C3).
GRADING, PAVING AND STORMWATER MANAGEMENT PLAN I SDC 5.17-120(F)
The Grading Paving and Stormwater Management Plan is found in the attached drawings
from the Favreau Group (sheet C2).
PHASED DEVELOPMENT PLAN I SDC 5.17-120(G)
The project is not phased, so this section does not apply.
ON-SITE LIGHTING PLAN I SDC 5.17-120(H)
Lighting is noted on the Site Lighting Ran provided by Builders Electric, Inc. (Sheet EI).
Lighting specifications and photometrics are enclosed as attachments to this document.
ADDITIONAL INFORMATION I SDC 5.17-120(1)
• The existing property is vacant, and the proposed use of the site is a new building and
supporting facilities for Northwood Christian Church.
• Written permission from the owner is provided on the submittal application.
• AVicinity Map is included in the attached drawings.
• Items 4 through 9 are not required.
• The (Irving) Slough runs across the north and west sides of the site, but the City of
Springfield GIS maps classifies it as a"Not Significant Wetland;' so we are under the
impression that an approved wetland delineation is not required.
• A Geotechnical Report is included in the attachments, but there is no evidence of unstable
soils or a high water table.