HomeMy WebLinkAboutStudies APPLICANT 7/28/2021TAX LOTS 17-02-33-42-00300 & 00700, SPRINGFIELD INFILTRATION RATE
June 11, 2021
The site is a vacant lot with mowed grass. NRCS soil classification maps identify this site as having Class C soils.
One test hole was dug onsite in the approximate location of one of the proposed infiltration rain garden. The test hole
was dug to approximately 6 feet deep. Ground water was not encountered. The infiltration rate was conservatively
determined to be about r per hour. For purposes of determining the rain garden size, an infiltration rate of 0.5" per hour
was used.
FACILITY SIZING
An open drainage channel exists on the south side of B Street, although the City has determined that this drainage
channel has not been sized to accommodate runoff from this private development. Because of this, the proposed
stormwater system has been broken up into several facilities.
There will be three private soakage trenches sized to accommodate runoff from each home plus 1/3 of the driveway
surface area. Since DEQ does not consider driveway runoff clean, the driveway will first drain towards a surface rain
garden that is sized to treat the entirety of the driveway runoff during the water quality storm. Please see attached SIM
form demonstrating proper sizing for the treatment of the driveway for treatment only. For events larger than the water
quality storm, runoff from the driveway will enter into an overflow that will be piped to the inlet pipe for the soakage
trenches, where the runoff will be mitigated up to the 25 -year storm (see attached soakage trench sizing calculations).
These facilities will be constructed underneath the proposed driveway and will have separation between each of them
for maintenance and ownership purposes. An overflow pipe from the most downstream soakage trench will be
constructed that will connect to the existing drainage channel on the north side of B Street. This overflow should only be
utilized for events larger than the 25 -year storm.
Based on this narrative and provided calculations and details, the proposed stormwater system complies with the City's
stormwater criteria,
5��4�p PROFESS
�� � mnFE k /oZ
w
OREGON
s 1a
N`* FP. T2, 15 J
rC J. FAV Pf'P
i FJPIIES �2iNTl f
SIM FORM: 2014 (Simplified Approach for Stormwater Management)
Application Chad Wilson Partition (Driveway) Build Ing Permitil
Address 5524 R St
Springfield, OR 97478 CResidential ommercial
Tax Loaf 17-02-33-42-00300 & 00700 lar<ieone)
NRCS Soil Type or
Measured lnfiltraiton Rate 0.5"/hr
Total Proposed Newer Replaced Impervious Surface Area 1 2079 Box 1
Impervious Area Reduction
Permeable Pavements If
Eca-Roof If
Contained Planter If
Tree Credit If
Facility Sizinefor Water Quality Flow -Control and Flood Control"' Only for use in Tvne A&BSolis
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Total Impervious Area Reduction
sf x
Box 2
P2079Box
Total Impervious Area Requiring Stormwater Managemment
Stormwater Planter
>
0.11
=
Sand Filter
If x
Facility Sizing for Water
Quality Only
Sum of Total
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
2079 IF
x 0.05 =
104
Stormwater Planter
sf
z 0.03 =
Swale
If
x 0.06 =
Over flow [o gu[terlweephole)
Vegetated Filter Strip
sf
x 0.2 =
Sand Filter
If
x 0.03 =
Facility Sizing for Water
Quality and Flow Control
Overflow to Open Drainage
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
sf
x 0.11 =
Stormwater Planter
If
x 0.07 =
Sand Filter
If
x 0.07 =
Facility Sizinefor Water Quality Flow -Control and Flood Control"' Only for use in Tvne A&BSolis
Surface Facilities
Impervious Area Managed
Sizing Factor
Faclity Surface Area
Rain Garden
sf x
0.13
=
Stormwater Planter
If x
0.11
=
Sand Filter
If x
0.11
=
Sum of Total
Impervious Area Managed
2079
Box4
Point of Discharge (check one)
IBo%4 must be equal or
greater than Sox 3)
Over flow [o gu[terlweephole)
Overflow to public storm drain pipe
Overflow to Open Drainage
X
fa
Subsurce Infiltration
g
2014 SIM FORM: Tree Credit and Rainwater Harvesting Worksheet
See "Tree credits" section for more information regarding the use of trees to most stormwater Impervious Area Reduction.
New Evergreen Trees
To receive Impervious Area Reduction Credit, new evergreen trees must be planted within 25 fear of the new or replaced impervious
Surfaces. New trees cannot be credited against rooftop areas. Minimum tree height(at the time of plasmas) to receive credit is 6 feet
Enter number of new evergreen trees that meet qualification requirements in Box A �Bo%A
Multiply Box by 200 and enter result In Box B Bax B
New Deciduous Trees
To receive Impervious Area Reduction Credit, new large deciduous trees must be planted within 25 feet of the new or replaced
impervious surfaces and new small deciduous trees must be pla and within 39 feet of new or replaced impervious surfaces. New
trees cannot be credited against rooftop areas. Minimum tree caliper (at the time of planning) to receive credit is 2 inches.
Enter number of new deciduous trees that meet qualification requirements in Box C H
BoxC
Multiply Box C by 100 and enter result in Box D Box D
Existing Tree Canopy
To receive Impervious Area Reduction Credit, existing large tree canopies must be Within 25 feet and exerting small tree canop'ees
must be within 10 feet of ground-level impervious surfaces (cannot be credit against rooftop surfacesl. Exist ng tree canopy
credited towards Impervious Area Reduction must be preserved during and after construction throughout the life of the development.
Minimum tree caliperto receive credit is 4 inches. No credit will be given to existing tree canopy located within environmental
conservation areas.
Enter square footage of existing tree canopy that meet qualification requirements in Box E. Box E
El
Multiply Box E by 0.5 and enter result in Box F. Box F
Total Tree Credit
Add Boxes B, D and F and enter the result in Box G Box G
Multiply Box 1 of Form SIM by 0.1 and enter the result! n Box H.
Enter the lesser of Box G and H In Box I. (This Is the amount to be entered as "Tree Credit" on Form SiM.)
SIM FORM 2014 Instructions
1. Enter square footage (sf) of total impervious area being developed into BOX 1.
2. Enter square footage (sf) for impervious area reduction techniques.
3. Enter sum of the impervious area reduction techniques into BOX 2.
4. Subtract BOX 2 from BOX 1 to find BOX 3, the amount of impervious area that requires stormwater management.
S. Select appropriate stormwater management facilities.
6. Enter the square footage of impervious area managed that will flow into each facility type.
7. Multiply each impervious area managed by the corresponding sizing factor. Enter this area as the facility surface area,
This is the size of faclity required to manage runoff
9. Where selecting facilities that will overflow, select the point of discharge location.
10. Enter the sum of the total of all the impervious area managed into BOX 4. BOX 4 must be greaer than or equal to BOX 3.
SOAKAGE TRENCH CALCULATIONS FOR
5524 B Street, Springfield, OR
DRAINAGEAREA=
AVERAGE RUNOFF COEFFICIENT (C) _
LENGTH OF DRYW ELL =
WIDTH OF DRYW ELL =
DEPTH OF DRYW ELL =
VOID RATIO OF DRYWELL=
AVERAGE PERMEABILITY OF SOIL =
SURFACE AREA OF BOTTOM=
SURFACE AREA OF SIDES -
OUTFLOW CAPACITYOF DHYWELL-
MAXIMUM STORAGE CAPACITY OF DPMELL
ELL =
DRYWELLVOLUME= 93.3 CUBIC YARDS
2,950 Si
0,90
10 FEET
36 FEET
7 FEET
31%
0.50 INCHES/HR
360 SO, FT,
644 SQ. FT.
0.068 ACRES
Sea Infiltration Repod by:
A1.1nad
15.0 CU, FT/HR= 1.87 GALLONS PER MINUTE
781.2 CU. FT. OF WATER
ED PROP
��� HGINEE Fss
W
OREGON jr
F J•FA t2 .1Gi J J
9lC J. FAVPEP
' ewleery tLaYa
25YEAR
TOTAL
RECURRENCE
RAINFALL
TOTAL
OUTFLOW
DURATION
DURATION
RAINFALL
DURING
STORM EVENT
FROM
STORAGE
OF STORM
OFSTORM
INTENSITY
STORM
RUNOFF
DRYWELL
REQUIRED
DRYWELL
IN MINUTES
IN HOURS
IN/HR
INCHES
CU FT.
CLL FT.
CU, FT,
SIZING
5
0.08
3.45
0.29
64
1
62
OK
10
0.17
2.37
040
87
3
85
OK
15
0.25
1.90
0.48
105
4
101
OK
20
033
1,56
052
115
5
110
OK
30
0.50
1.36
068
150
8
143
OK
60
1.00
0.81
081
179
15
164
OK
120
2.00
0.56
1.12
248
30
218
OK
180
3.00
0.49
147
325
45
280
OK
240
4.00
0.44
1.76
389
60
329
OR
360
6.00
0.37
2.22
491
90
401
OK
480
6.00
0.34
212
602
120
482
OK
600
10.00
0.31
3.10
686
150
536
OK
720
12.00
028
336
743
180
563
OR
900
1500
0.25
3.75
330
225
605
OK
1,080
18.00
0.23
4.14
916
270
646
OK
1,260
21.00
0.22
4.62
1,022
315
707
OK
1,440
2400
0.21
504
1,115
360
755
OK
ED PROP
��� HGINEE Fss
W
OREGON jr
F J•FA t2 .1Gi J J
9lC J. FAVPEP
' ewleery tLaYa
TYPICAL SOAKAGE TRENCH DESIGN FOR
CHAD WILSON PARTITION
- PROPOSED DRIVEWAY
4" AC ON 12" CRUSHED ROCK 4" DIA. OPEN
GRATEICLEANOUT
CHANNEL SOAKAGE TRENCH
SOAKAGE TRENCH DETAIL
NO SCALE
SOAKAGE TRENCH NOTES:
1. SOAKAGE TRENCH = 36'X 10'X TOR EQUIVALENT SQUARE FOOTAGE. SOAKAGE
TRENCHES HAVE BEEN SIZED FOR THE 25 -YEAR STORM PER ATTACHED CALCULATIONS.
2. TOTAL IMPERVIOUS AREA DRAINED = 2,950 SQUARE FEET PER SOAKAGE TRENCH.
3. SEE THE CITY OF EUGENE STORMWATER MANAGEMENT MANUAL FOR ADDITIONAL
INFORMATION.
4. FILTER FABRIC MUST BE ONE OF THE FOLLOWING TYPES/BRANDS: LINQ 125EX; LINO
TYPAR3201; TNS E040; TNS R035; TNS R040; TNS R042; AMOCO 4535; MARAFI 140NL.
5. DRAINAGE ROCK SHALL BE A MINIMUM 2 112" TO 1 112" DRAIN ROCK.
6. THE PIPE WITHIN THE TRENCH SHALL EITHER BE PCV D2729 OR HDPE LEACH FIELD
PIPE.
7. THE TRENCH BOTTOM IS TO BE INSTALLED LEVEL IN ALL DIRECTIONS.
WILSON PARTITION T
4GE TRENCH DESIGN
�;p PRpgFss/
Wu eta y
� r r
O
s
F � � 12,2
J
FtC J. FA40
oo-w� Wada
PER PLAN
ZONES _ __
ZGNEA
20NEG
PER PIAN
TOP OF
31 SLOPE2.
-OVERFLOW
"\FALI[1TT
OWY DETAILS
PER PLAN
TYPICAL FREEBOARC
ELEVATION
I IN
\
m
`PaiG
—
12"TOPSOIL
NATIVE SOIL
e
� III
q' PIPE TO SCARAGE
TRENCH
_
PER PLAN
FILTER FABRIC
SURROUNDING
ROCK LAYER
1 W SQUARE FEET IN ZGNEA
THE RAIN GARDENS WILL BE FILLED WITH 12" OF TOPSOIL [TWAT MILO VEGETATION
IN THE RAIN GAROEN5 SHALL BE PLANTED PER SCHEME I OF THE CITY OF EUGENE
STORMWATER MANUAL SECTION 2.39. PLANTS TO BE T ON CENTER.
ESTIMATED PLANT COUNT.
ZONEA ZONE.
CPRE%OBNUPTA 52-4 POTS CAMASSIA OUAMASH 26-6"POTS
JUNCUSPATENS 4-q'POB DESCHAMPSIACAEBPITBY4 2Y 4 -POTS
CHAD WILSON PARTITION (DRIVEWAY)
INFILTRATION RAIN GARDEN DETAIL