HomeMy WebLinkAboutApplication APPLICANT 7/27/2021City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Land Division Tentative Plan
Partition, Subdivision
SPRINOFI�
1
Partition Tentative Pre -Submittal: Subdivision Tentative Pre -Submittal: Application Type (Applicant: check ,❑
Partition Tentative Submittal: Subdivision Tentative Submittal:
Required Project Information (Applicant; complete this section)
Applicant Name: F A/Z Phone: lv?-34RZ
Company; Fax:
Address: 02,5 C 4 tsli5 GL//y
Applicant's Rep.:
Phone:
Company:
Fax:
Address:
Property Owner: - G E%L
Phone:
Company:
Fax;
Address:
ASSESSOR'S MAP NO: /7 -0?) -:33,/-1
TAX LOT NO 5 : 600
Property Address: S O G
Size of Property: f / Acres ❑ Square uare Feet
Proposed Name of Subdivision:
Description of if you are filling in this form by hand, please attach your proposal description to this application.
Proposal: 2G G / To 40T P/i/L7-/7_/4141/
Existing Use: .6FS / En! 7--/1414-
Total acreage of parcels/
# of Lots/Parcels: allowable density:
Proposed #
Dwell units
Signatures: Please si. n and Print your name and date in the agorooriate
Required Project Information (City Intake Staff.,
Associated Applications:
box on the next a e.
complete this section)
signs:
Pre -Sub Case No.: df'���� Ol'
e: -I 2O�
Reviewed b
�Q
GLL�
Case No.:
w
Date:
Reviewed b :
U
Application Fee: $
Technical Fee: $
Posta a Fee: $
TOTAL FEES: $ ��
PROJECT NUMBER:Gli__2A"
Revised 1/7/14 kl 1 of 10
Owner Signatures
This application form is used for both the required pre -submittal meeting and subsequent
complete application submittal. Owner signatures are required at both stages in the application
process.
An application without the Owner's original signature will not be accepted.
The undersigned acknowledges that the information in this application is correct and
accurate for scheduling of the Pre- Submittal Meeting. If the applicant is not the
owner, the owner hereby grants permission for the applicant to act in his/her behalf.
I/we do hereby acknowledge that I/we are legally responsible for all statutory
timelines, information, requests and requirements conveyed to my representative.
7—
Signaturt
natu
Z—
I represent this application to be complete for submittal to the City. Consistent with the completeness check
performed on this application at the Pre -Submittal Meeting, I affirm the Information identified by the City as
necessary for processing the application Is provided herein or the information will not be provided if not otherwise
contained within the submittal, and the City may begin processing the application with the information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 22].1]8 pertaining to a
complete application.
Date:
Signature
Revised 1p/14 kl 2 of 10
Land Division Tentative Application Process
1. Applicant Submits a Land Division Tentative Application for Pre -Submittal
• The application mus onform to the Land Division Tentative Submittal Requirements
Checklist on page 4-6 f this application packet.
• A pre -submittal meeting to discuss completeness is mandatory, and pre -submittal
meetings are conducted every Tuesday and Friday, from 10:00 am - noon.
• Planning Division staff strives to conduct pre -submittal meetings within five to seven
working days of receiving an application.
2. Applicant and the City Conduct the Pre -Submittal Meeting
• The applicant, owner, and design team are strongly encouraged to attend the pre -
submittal meeting.
• The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division and is scheduled for 30 to 60 minutes.
• The Planner provides the applicant with a Pre -Submittal Checklist specifying the items
required to make the application complete if it is not already complete, and the
applicant has 180 days submit a complete application to the City.
3. Applicant Submits a Complete Application, City Staff Review the Application and
Issue a Decision
• A complete application must conform to the Land Division Tentative Submittal
Requirements Checklist on pages 4-6 of this application packet.
• A Type II decision, made after public notice, but without a public hearing, unless
appealed, is issued within 120 days of submittal of a complete application.
• Mailed notice is provided to property owners and occupants within 300 feet of the
property being reviewed and to any applicable neighborhood association. In addition,
the applicant must post one sign, provided by the City, on the subject property.
• There is a 14 -day public comment period, starting on the date notice is mailed.
• Applications are distributed to the Development Review Committee, and their
comments are incorporated into a decision that addresses all applicable approval
criteria and/or development standards, as well as any written comments from those
given notice.
• Applications may be approved, approved with conditions, or denied.
• At the applicant's request, the Planner can provide a copy of the draft land use decision
prior to issuing the final land use decision.
• The City mails the applicant and any party of standing a copy of the decision, which is
effective on the day it is mailed.
• The decision issued is the Final decision of the City but may be appealed within 15
calendar days to the Planning Commission or Hearings Official.
Revised 1/7/14 kl 3 of 10
Land Division Tentative Submittal Requirements Checklist
NOTE:
• ALL of the following items MUST be submitted for BOTH Pre -Submittal and Submittal.
• If you feel an item on the list below does not apply to your specific application, please
state the reason why and attach the explanation to this form.
XApplication Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. Any applicable application, technology, and postage fees are collected
at the pre -submittal and submittal stages.
,)Kr Land Division Tentative Application Form
Narrative explaining the purpose of the proposed development, the existing use of the
property, and any additional information that may have a bearing in determining the
action to be taken. Density - list the size of property (acres), maximum allowable density
and the density proposed.
❑ Copy of the Deed
Copy of a Preliminary Title Report issued within the past 30 days documenting
ownership and listing all encumbrances.
X Copy of the Land Division Plan Reduced to SVa"x 11", which will be mailed as part of
the required neighboring property notification packet.
❑ Right -of -Way Approach Permit Application provided where the property has frontage
on an Oregon Department of Transportation (ODOT) facility.
❑ Three (3) Copies of the Stormwater Management System Study with Completed
Stormwater Scoping Sheet Attached - The plan, supporting calculations, and
documentation must be consistent with the Engineering Design Standards and Procedures
Manual.
❑ Three (3) Copies of the Traffic Impact Study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 A.A. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, metro plan and state land use and transportation policies and
objectives.
Four (4) Copies of the Following Plan Sets for Pre -Submittal OR
Three (3) Copies of the Following Plan Sets:
❑ All of the following plans must include the scale appropriate to the area involved
and sufficient to show detail of the plan and related data, north arrow, and date of
preparation.
All plan sets must be folded to 81h" by 11" and bound by rubber bands.
a. Site Assessment of Existing Conditions
❑ Prepared by an Oregon licensed Landscape Architect or Engineer
Revised 1/7/14 kl 4 of 10
'Vicinity Map
XThe name, location, and dimensions of all existing site features including buildings,
curb cuts, trees, and impervious surface areas, clearly indicating what is remaining and
what is being removed. For existing structures to remain, also indicate present use
and required setbacks from proposed property lines.
The name, location, dimensions, direction of flow and top of bank of all watercourses
and required riparian setback that are shown on the Water Quality Limited Watercourse
Map on file in the Development & Public Works Department
,X The 100 -year floodplain and floodway boundaries on the site, as specified in the latest
adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment
or Letter of Map Revision
❑ The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead
Protection Areas Map on file in the Development & Public Works Department
Physical features including, but not limited to trees 5" in diameter or greater when
measured 4 1/2 feet above the ground, significant clusters of trees and shrubs, riparian
areas, wetlands and rock outcroppings
❑ Soil types and water table information as mapped and specified in the Soils Survey of
Lane County. A Geotechnical Report prepared by an Engineer must be submitted
concurrently if the Soils Survey indicates the proposed development area has unstable
soils and/or a high water table
b. Land Division Tentative Plan
Prepared by an Oregon licensed Land Surveyor
❑ City boundaries, the Urban Growth Boundary, and any special service district
boundaries or railroad right-of-way which cross or abut the proposed land division
❑ Location and width of all existing and proposed easements on and abutting the
proposed land division
❑ Boundaries of entire area owned by the property owner, of which the proposed land
division is a part, as well as dimensions and size of each parcel and the approximate
dimensions of each building site indicating the top and toe of cut and fill slopes to scale
❑ Location and type of existing and proposed street lighting, including type, height, and
area of illumination
❑ Location, widths, conditions, and names of all existing and proposed streets, alleys,
dedications or other right-of-ways within or adjacent to the proposed land division.
Proposed streets should also include approximate radius of curves and grades and
relationship to any projected streets as shown on the Metro Plan, TransPlan,
Conceptual Development Plan, or Conceptual Local Street Map.
❑ Location of existing and required traffic control devices, fire hydrants, power poles,
transformers, neighborhood mailbox units and similar public facilities
❑ Location and dimensions of existing and proposed driveways
❑ Location of existing and proposed transit facilities
❑ Location and width of all existing and proposed sidewalks, sidewalk ramps, pedestrian
access ways and bike trails
❑ Location, size and type of plantings and street trees in any required planter strip
Revised 1/7/14 kl 5 of 10
❑ Location and size of existing and proposed utilities on and adjacent to the site including
sanitary sewer mains, stormwater management systems, water mains, power, gas,
telephone, and cable TV. Indicate the proposed connection points
❑ The locations of all areas to be dedicated or reserved for public use, with the purpose,
condition or limitations of the reservations clearly indicated
❑ Future Development Plan where phasing or large lots/parcels are proposed as specified
in SDC 5.12-120 E.
c. Stormwater Management Plan
❑ Prepared by an Oregon licensed Civil Engineer
❑ Planting plan prepared by an Oregon licensed Landscape Architect where plants are
proposed as part of the stormwater management system
❑ Roof drainage patterns and discharge locations
❑ Pervious and impervious area drainage patterns
❑ The size and location of stormwater management systems components, including but
not limited to: drain lines, catch basins, dry wells and/or detention ponds; stormwater
quality measures; and natural drainageways to be retained
❑ Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for
land with a slope over 10 percent, the contour lines may be at 5 foot intervals)
❑ Amount of proposed cut and fill
❑ Additional Materials That May be Required
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL
STANDARDS/APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE
APPLICANT SHOULD CONSIDER UTILIZING PRE -DEVELOPMENT MEETINGS AS
DISCUSSED IN SDC 5.1-120:
❑ Proposed deed restrictions and a draft of any Homeowner's Association Agreement
❑ Additional plans and documentation for submittal of a Cluster Subdivision proposal
as specified in SDC 3.2-230
❑ Riparian Area Protection Report for properties located within 150 feet of the top of
bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the
top of bank of any direct tributaries of WQLW
❑ A Geotechnical Report prepared by an engineer must be submitted concurrently if
there are unstable soils and/or a high water table present
❑ Where the development area is within an overlay district, address the
additional standards of the overlay district
❑ If five or more trees are proposed to be removed, a Tree Felling Permit as specified
in SDC 5.19-100
❑ A wetland delineation approved by the Oregon Division of State Lands must be
submitted concurrently where there is a wetland on the property
❑ Any required federal or state permit must be submitted concurrently or evidence
the permit application has been submitted for review
❑ Where any grading, filling or excavating is proposed with the development, a Land
and Drainage Alteration permit must be submitted prior to development
ReviSed 1/7/14 kl 6 of 10
❑ Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100
and 5.21-100
❑ An Annexation application, as specified in SDC 5.7-100, where a development is
proposed outside of the city limits but within the City's urban service area and can
be served by sanitary sewer
❑ All public improvements proposed to be installed and to include the approximate
time of installation and method of financing
Rovmod 1p/14 kl 7 of 10
SPRINGFIELD
225 FIFTH STREET
DEVELOPMENT AND PUBLIC WORKS oaeooN SPRINGFIELD, OR 97477
PHONE: 541,726.3753
FAX 541 7361021
wwwspdngfraldocgov
December 6, 2013
REQUIRED STORMWATER SCOPING SHEET USE POLICY:
In October 2003, Springfield Public Works released a trial "stormwater scoping sheet," provided to help
engineers and developers meet stormwater requirements in the Springfield Development Code (SDC) and
Engineering Design Standards and Procedures Manual (EDSPM). After a five month trial period, it became
apparent that users of the scoping sheet submitted much more complete applications than non-users. An added
bonus was a decrease in the overall review time spent on the applications, resulting in quicker notice of
decisions.
As a result of the benefits of the scoping sheets, the City has decided to make their use a mandatory process.
Current city policy is that the use of stormwater scoping sheets is required for all applications which require
development review. All applications submitted to the City shall provide a copy of a completed stormwater
scoping sheet with the application packet Attached with this letter is the latest version of the scoping sheet,
which reflects changes requested by the development community.
PLEASE NOTE: SUBMITTED APPLICATIONS WILL NOW BE REQUIRED TO SUBMIT A
COMPLETED STORMWATER SCOPING SHEET, STORMWATER STUDY AND PLANS IN
CONFORMANCE WITH THE SCOPE REQUIREMENTS
DIRECTIONS FOR USING STORMWATER SCOPING SHEETS ARE AS FOLLOWS:
1.) Obtain souping sheet from application packet, city website, or other location.
2.) Fill out project information (top half of front sheet) prior to commencement of work on stormwater study.
(Note: Do not sign scoping sheet until it is received from the City with requirements checked.)
3.) Mail, fax, or email all pages to: City of Springfield, Development and Public Works Dept., Ann: Clayton
McEachern.
4.) Receive completed scoping sheet (filled out by the City) indicating minimum requirements for a complete
SWITTMI ter study.
5.) Include four (4) copies of complete seeping sheet (signed by engineer at the bottom of page 2), stormwater
study and plans that comply with the minimum required scope with submittal of application packet. The
seeping sheet shall be included as an attachment, inside the front cover of the stormwater study.
Stormwater scoping sheets can be found with all application packets (City website and the DPW front counter)
as well as on the Engineering and Construction Resources webpage located at: htae//wwwspringfield-
or.aov/DP W/EngineerinuandConstructioliResources.hmi under the Public Improvement Permit Projects Forms
section. Thank you in advance for working with the City of Springfield with this new process.
Sincerely,
Clayton McFachern, PE
City of Springfield, Development and Public Works
Email: cmceachem@springfield-or.gov
Phone: (541) 736— 1036
Fax: (541) 736-1021
DEVELOPMENT AND PUBLIC WORKS
SPRINGFIELD
225 FIFTH STREET
SPRIOREGON 7477
PHONE 5417 OR 53
PHONE , 726 1 6.3753
FAX 541,726 1021
wwwspangiOldor gov
STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK
------------------------ (Area below tide' line filled,an' by Applicant) - ------------------
(Please rehan to Clayton McEachera @ Cay ofSpringfield Developmear and Public Works, Far # 736-1021, Phone # 736-1036),
email: cmceachern('gs'pringfield-or goo
Project Name:
Applicant:
Assessors Parcel #:
Date:
Land Use(s):
Phone #:
Project Size (Acres):
Fax #:
Approx. impervious Area:
Email:
Project Description (Include a copy of Assessor's map):
Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary:
Proposed Stormwater Best Management Practices:
------------------------ (.area helm, th& /in, filled our by the City and Returned to the A ntlicami --------------------
Nt a minimum, all boxes checked by the City on the frons and back of this sheet shall be submitted
for an application to be complete for submittal although other requirements maybe necessary).
Drainage Study Type (EDSPM Section 4 03 2)� (Note, UIl may be substituted for Rational Method)
❑ Small Site Study — (use Rational Method for calculations)
❑ Mid -Level Development Study — (use Unit Hydrograph Method for calculations)
❑ Full Drainage Development Study —(use Unit Ilydrograph Method for calculations)
Environmental Considerations:
❑ Wellhead Zone: ❑ Hillside Development:
❑ Wetland/Riparian: ❑ Floodway/Floodplain:
❑ Soil Type: ❑ Other Jurisdictions
Downstream Analvsis:
❑ N/A
❑ Flow line for starting water surface elevation:
❑ Design HGL to use for starting water surface elevation:
❑ Manhole/Junction to take analysis to:
Return to Clayton McEachern @ City of Springfield, email: cmceachom@springfield-or,gov, FAX: (541) 736-1021
COMPLETE STUDY ITEMS of ommai useo iw.
a Based upon the information provided on the front ofthis sheet, the fallowing represents a minimum of iehat is neededfor an
application to be complete for submittal with respect to drainage; however, this list should not be used in lieu code Springfield
Development Code (SDC) or the City's Engineering Design Manual Compliance with these requirements does not constitute site
approval; Additional site specific information may be required. Note. Upon scoping sheet submittal, ensure completedform has been
signed in the space provided below:
Interim Design Standards/Water Quality EDSPM Chapter 3
Req'd N/A
❑ ❑ All non -building rooftop (NBR) impervious surfaces shall be pre-treated (e.g. multi-chambered catchleasin w/oil filtration
media) for siormovaler quality. Additionally, a minimum of 50% of the NBR impervious surface shall be treated by
vegetated methods.
❑ ❑ Where required, vegetative stormwaler design shall be consistent with design standards (EDSPM Section 3.02), set forth
in Chapter 2 ofthe Eugene Stonnwater Management Manual.
For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified
by the Eugene Stormwater Management Manual (Sec2.4.1).
If a stormwaler treatment Swale is proposed, submit calculations/specifications for sizing, velocity, flow, side slopes,
bottom slope, and seed mix consistent with City of Springfield or Eugene's Slormwstar, Management Manual.
Water Quality calculations as required in Section 3.03.1 of the EDSPM.
❑ ❑ All building rooftop mounted equipment, or other fluid containing equipment located outside ofthe building, shall
U U Existing and proposed contours, located at one fool interval. Include spot elevations and site grades showing how site
drains.
Private stormwater easements shall be clearly depicted on plans when private stormwaler flows from one property to
another.
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to
the wehsite: lem:','o w, dcq.state.or.us/wcyuiciric hon for more information.
Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events.
"This form shall be included as an atfachmenq inside the front cover, of the stormwater study.
* IWPORTAM'. ENG4vh'FR PLF.4SF READ BFZOW AND S/GAR
As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study
and plan set. Signature Date
Tom Version 5: June 2015
Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon.
A complete drainage study, as required in H)SPM Section 4.03.1, including a hydrological study map.
❑
❑
Calculations showing system capacity for a 2 -year stout event and overflow effects of a 25 -year storm event.
❑
❑
The time ofconcentration(Tc) shall be determined using a 10 minute start time for developed basins.
Review of Downstream System EDSPM Section 4.03.4.0
A downstream drainage analysis as described in EDSPM Section 4.03.4.0 On-site drainage shall be governed by the
Oregon Plumbing Specialty Code (OPSC).
❑
❑
Elevations ofthe HGL and flow lines for both city and private systems where applicable.
Design of Storm Systems (EDSPM Section 4.04).
Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set.
F
Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or
proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,00016load
without failure ofthe pipe structure.
❑
❑
Manning'., "a" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to
achieve a minimum velocity ofthree (3) feet or second at 0.5 eine full invasion Table 4-1 as well
U U Existing and proposed contours, located at one fool interval. Include spot elevations and site grades showing how site
drains.
Private stormwater easements shall be clearly depicted on plans when private stormwaler flows from one property to
another.
Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs, with the exception of
residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to
the wehsite: lem:','o w, dcq.state.or.us/wcyuiciric hon for more information.
Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events.
"This form shall be included as an atfachmenq inside the front cover, of the stormwater study.
* IWPORTAM'. ENG4vh'FR PLF.4SF READ BFZOW AND S/GAR
As the engineer of record, I hereby certify the above required items are complete and included with the submitted stormwater study
and plan set. Signature Date
Tom Version 5: June 2015
80-60'0
BN
s
g
�
d
v
�
B
W'
�
33
G� G
pEg6
End •
g�$
� g
sL
iq65
o
W
@�za
o6
Y_
All
Rix
w
e=
�
w
n
s
&
em
:
€aN
=
PRO
��
Oar
g
�:5 =
9
LLJ
g e
= OeN
Wo
Z
W
mg
W
1006L
woos
z �
00'08
�
9LZL
SZ'CS
au.
— Z
-
W
3
W'
Q
wo
�
1r—
tL,'�
_�
5
—
—aHa—
w
���qqq
�o'ac� wnax
xo
n:
soon
M,
s>
�MiC
'� 0
� �
3N1'7
NOSX3QNV
`'n
Qe I31] wltl m50dOtla
L1 $9=NOLLtlM313 3NI1 MOV
310HMT1
tlLtlM13NM 0350dOtld