HomeMy WebLinkAboutPacket, DRC PLANNER 6/15/2021Pre -Submittal Meeting
Development and Public Works Department
Reem 616
PRE -SUBMITTAL MEETING DATE:
Tuesday, June 22, 2021
11:00 a.m. - 12:00 p.m.
DPW GenfelFence Room 616
Pre -Submittal (Site Plan Review) #811 -21 -000150 -PRE 811-21-000152-PROJ
Springfield School District
Assessor's Map: 17-03-26-34 TL: 6200
Address: 326 Centennial Blvd.
Existing Use: School baseball field
Applicant has submitted plans to rebuild existing baseball field with artificial turf
Planner: Andy Limbird
Meeting: Tuesday, June 22, 202111:00 — 12:00 via MS Teams
JI I C
VICINITY MAP
811 -21 -000150 -PRE Pre -Submittal Meeting
17-03-26-34 TL 6200
326 Centennial Blvd.
Springfield School District
City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477
Site Plan Review
SPRINGFIELD
W 6
Application Type (Applicant. check
Site Plan Review Pre -Submittal: Major Site Plan Modification Pre -Submittal,
❑
Site Plan Review Submittal: Ma'or Site Plan Modification Submittal:
Required Project Information (Applicant. complete this section)
Applicant Name:Brett Yancey Phone:
❑
Company: Springfield School District
Email:er�trancerc��dngaxtz.«.0
Address:640 A Street, Springfield, OR 97477
Applicant's Rep.: Anthony J. Favreau
Phone:541-683-7048
Com an :The Favreau Group, LLC
Email: favreaugmup@msn.com
Address: 3750 Norwich Ave., Eugene, OR 97408
Property Owner: Same as applicant
Phone:
Company:
Email:
Address:
ASSESSOR'S MAP NO: 17-03-26-34
TAX LOT NO(S): 6200
Property Address:
Size of Property: 3.8 Acres ❑ Square Feet ❑Dwelihno
Proposed No. of
Units per acra'O
Proposed Name of Project: Hamlin School Baseball Field
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Rebuild existing baseball field with artifcal turf
Existing Use: Hamlin School Baseball Field
New Impervious Surface Coverage (Including Bldg. Gross Floor Area): 14,000
sf
Si natures: Please sign and Drint Mour name and date in the aDDroDriate
Required Project Information (City Intake Staff.,
Associated Applications:
box on the next
complete this section)
Signs:
a e.
Pre -Sub Case No.:
Date:
Reviewed by:
Case No.:
Date:
Reviewed by:
Application Fee: $
Technical Fee: $
Posta a Fee: $
TOTAL FEES: $
1 PROJECT NUMBER:
Revised 1/7/14 Id 1 of 11
June 10, 2021
Assessor's Map: 17-03-26-34 Tax Lot 6200
NARRATIVE
Applicant: Springfield School District
640 A Street
Springfield, OR
Brett Yancey
Applicant's
Representative: The Favreau Group
3750 Norwich Ave.
Eugene, OR 97408
541-683-7048
Atm: Anthony Favreau
LAND USE REQUEST
The applicant is seeking approval of the reconstruction of the existing baseball field and adjacent
walks on the subject site.
SITE AND SURROUNDING CHARACTERISTICS
The subject site currently is a natural turf baseball field with dugouts and concrete walks. This
proposal is to replace the existing natural turf on the baseball field with artificial turf, along with
adding bleachers, new dugouts and concrete picnic areas adjacent to the baseball field.
No increase in stormwater runoff is anticipated. In fact, the open rock under the artificial turf will
add about 46,000 cubic feet of additional stormwater storage in the event the current drainage
system backs up.
SITE PLAN APPROVAL
The applicant is seeking an approval of this baseball field and adjacent walks reconstruction. The
total area of disturbance is about 140,000 square feet.
The site will be landscaped with natural lawn in the disturbed areas outside of the baseball field.
The proposed development is compatible with the surrounding developments because the site will
remain a baseball field.
There will be no hazardous materials stored on site as a part of this reconstruction