Loading...
HomeMy WebLinkAboutItem 03 Downtown Project Request and SUB Property AGENDA ITEM SUMMARY Meeting Date: 1/11/2021 Meeting Type: Executive Session Department: CMO Staff Contact: Courtney Griesel, Economic Development S P R I N G F I E L D ECONOMIC Staff Phone No: (541) 726-3700 DEVELOPMENT AGENCY Estimated Time: 30 Minutes ITEM TITLE: DOWNTOWN PROJECT REQUEST AND SUB PROPERTY ACTION REQUESTED: Provide direction to staff regarding requested acquisition, redevelopment support and disposition of Downtown property located at 17-03-35-32 taxlots 5100, 5000, and 4900 (236-248 Main Street). ISSUE STATEMENT: Masaka Properties LLC (Masaka) has requested SEDA support in the acquisition of redevelopment property from Springfield Utility Board (SUB) as well as funding for preliminary project assessment work related to the property and redevelopment vision. The requested SEDA investment includes; • $76,000 in financial support to Masaka LLC for assessment work • $790,000 for acquisition by SEDA of real property currently owned by SUB ATTACHMENTS: Attachment 1 – 29 October 2020 Masaka Request Letter Attachment 2 – SUB Property Purchase Memo Attachment 3 – Queen Bee Tenant Property Purchase Letter of Interest DISCUSSION/ FINANCIAL IMPACT: Masaka proposes to redevelop a portion of SUB owned Downtown property and is requesting SEDA financial assistance in early stage assessment of the project in an amount of $76,000 (ATT 1). The proposed development will require/provide; • SEDA acquisition of lots 4900, 5000 & 5100 from SUB (ATT 2) in an amount not to exceed $790,000 • Future transfer of lots 5000 & 5100 to Masaka in a yet to be determined amount • Likelihood of tenant relocation costs to SEDA • Opportunity to support existing tenant interest (ATT 3) in acquiring lot 4900 • SUB acquisition of City owned property adjacent to the site and SUB offices Early Masaka redevelopment concepts envisioned a mix of hotel products. This has been updated to now reflect ground floor commercial and upper floors of market rate residential. In order to better understand the project feasibility and proforma, Masaka is requesting $76,000.00 in SEDA funding support to complete; - $39,500 - Project Optimization & Infrastructure Study: Funds architecture (Campfire Collaborative) and engineering (Branch/SystemsWest/Cultivate) study. - $22,000 - General Contractor Construction Cost Estimate & Analysis: Funds construction cost estimates by general contractor Ryan Thomas Construction. - $14,500 - Economic Feasibility Assessment: Funds local market assessment and proforma study (Len Blackstone), grant/incentive research (Lori Bumgardner), and investor/bank funding strategy development (Masaka) This work is intended to inform product type and feasibility of the project. Limited SEDA support on initial code and massing analysis has been provided on past similar projects. The SEDA Board is requested to discuss and direct staff to; a) Fund all, a portion, or none of the current Masaka request for assessment funds; b) Authorize SEDA acquisition of SUB property (Map 17-03-35-32; Taxlots 4900, 5000 & 5100) in an amount up to $790,000.00 and as outlined in Attachment 2 and direct this authorization as contingent or not contingent on outcomes of Masaka assessment work related to redevelopment of taxlots 5000 & 5100; c) If not contingent, authorize initial discussions and negotiations with Queen Bee (tenant) related to their expressed interest in purchase of taxlot 4900. M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” 29 October 2020 Springfield Economic Development Agency (SEDA) City of Springfield, Oregon 225 Fifth Street Springfield, OR 97477 Dear SEDA Board: On behalf of Masaka Properties LLC, thank you for your ongoing investment of time, consideration, and resources to support our prospective project at 248 Main Street, the first new construction project in the downtown core in nearly 15 years. Envisioning this project as a show piece of downtown, Masaka’s development team has explored numerous options for the scale and scope of this mixed-use development. We are now writing this letter to request assistance from the SEDA board to fund a more detailed cost and feasibility study for this project. This will provide the necessary information to enable Masaka to “right-size” the project based on the economic viability, and reveal where an insertion of gap-funding by the City would enhance the project to make the highest and best use of this site. Masaka Properties LLC has been instrumental in the efforts to revitalize our downtown core, refurbishing living units and developing new commercial spaces which have attracted a new and vibrant community to what was once a stagnant area. Masaka Properties LLC and partner DNL Properties LLC have self-funded our many projects to date, investing nearly 2.5 million dollars in renovations to properties negotiated from previous owners who were holding valuable and underutilized buildings blighted with much “deferred maintenance”. From our renovations over five significant downtown buildings, we’ve not only increase the tax revenue of the 300 block three-fold but also have provided inspiration and motivation to other holdout investors to believing in the potential of downtown Springfield. All of this new activity would have never been possible if not for a strong partnership with the City of Springfield. The SDC buyback program has had a significant impact on our ability to make these projects pencil. We are grateful for the knowledgeable and problem-solving staff at the permit office, along with shared excitement with city-elected staffers. Community and renovation isn’t built by individuals, but by a dedicated team, to which the city of Springfield has been invaluable. We see the tremendous potential for this new development at 248 Main Street to “up the game” with respect to downtown development, creating a positive impact that will undoubtedly be a catalyst for other developers to seek opportunities to invest in downtown Springfield. Together with Campfire Collaborative: Architecture & Design we have envisioned a build that would bring many more people and businesses to an underdeveloped and underutilized property. This is not a generic mixed-use urban infill project. Our proposed design is inspired by the history of this site as the home of the Springfield Hotel ( from ~1890 until the late 1950’s) and the original Springfield City Hall and police/fire station. The historical and cultural assets of this site reveal a rich narrative of early Springfield industry, politics, and social activities. This project is an opportunity to build a modern landmark, creating new commercial and living spaces downtown while also showcasing notable points of interest about the City’s past, making a project that is very specific and appropriate for this site. Last August (just over 14 months ago), Masaka Properties brought this grand new vision to the SUB board meeting to request the opportunity to purchase the property. It then turned into a “swap” of city owned parking for the benefit of SUB who, for the collective goal of downtown economic development, first Attachment 1, Page 1 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” considered the sale of the four properties (including the Masonic Lodge). Masaka Properties LLC underwent extensive contract revisions to iron out a suitable and transparent deal with City legal, but since has been reconsidered due to the positive involvement the SEDA board participation could offer. Masaka Properties to date has invested $32,500 into exploring various approaches in scope and design, opportunity zone investigations, legal fees for an original contract negotiation with the city of Springfield (which now is changed beyond completing), and countless project management time with meetings and correspondence. Some of the deliverables our development team has compiled to date include: • Architectural massing studies for design options exploring 2/1, 4/1, 5/1, with variations for parking and on-site amenities (as well as earlier hotel scheme that included remodel of Masonic Lodge as part of the scope) • Typical unit designs for studio and 1-bedroom apartments (as well as typical room designs from the earlier hotel scheme) • Drone photography of the site to analyze views/site lines from prospective floor elevation heights • Extensive historical research, including coordination of an oral history interview with the most recent private owner whose family owned/operated the original hotel from ~1910 until its closure in the late 1950’s Our goal remains clear. We wish to build a mixed-use building, consisting of four to five ground-level commercial spaces, a “three-to-four over one” building of 45-50 living spaces with the future potential of a later additional roof floor for either a river view public event space/restaurant or penthouse units depending on market trend. What we have investigated thus far is the workability of three plans. A modest “two-over one”, “three-over- one” with a later fourth potential, and a grand statement for the city, a “five-over-one”. Ballpark estimates for construction prices per square foot has put the range of all these ideas around 6-16 million dollars based on like kind projects ranging from $225-$250 a square foot. We already have a few major components of the project accomplished. There is a clean Phase 1 environmental done by SUB which requires no further follow-up. The look, design and basic floor plans for both studio and one-bedroom units have been roughed out to reflect major selling points we have learned by our leasing experience and market testing which our own downtown lofts have provided a working lab model. The additional historical homage to items around the city (the old fire bell at city hall for example) we are planning to be placed on the location which would attract interest and relevance for this developments connection to the city community. Our budgeting research has determined that, including the helpful incentives from the city (i.e. SDC buy backs and property purchase pricing), if the project were to be built to the grandest scale it would likely require some “gap” funding. If we build to the “three-over-one” with the structural capacity to add an additional floor in the future, our need would not be as great or at all. To determine a solid game plan whereby SEDA, the city of Springfield and Masaka Properties would come to a better understanding of the development and shared risks, we would like to request assistance money to further architectural/engineering studies to be able to narrow in on construction methodologies that affect cost estimating, do a comprehensive cost assessment reflecting BOLI wages, along with pro-forma and economic feasibility analysis, and some tighter financial commitments from our local banks. This will prove to all involved the viability and fine tune for us if the project pencils enough to engage. Attachment 1, Page 2 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” Masaka Properties LLC has invested $32.5K into design/feasibility work to get to this point, and would like to request funds from SEDA in the amount of $76,000 to complete the proposed optimization study. On the next page you will find a breakdown of the scope elements of the proposed study and associated costs for each item, including: • Design Optimization & Infrastructure Study – Architectural refinement to create enough definition for cost estimating and pro-forma study; includes coordination with Engineering consultants to determine infrastructure needs and options. • Construction Cost Estimate & Analysis – Estimated budget pricing for new construction with variations for number of stories, and with add-on options for rooftop amenities and/or a future additional floor level • Economic Feasibility Assessment –CMA, Pro-forma study, grants/tax incentives research, and funding strategy for project implementation. Should funds be approved, work would begin immediately and earnestly with a goal for assessment completion by March/April 2021 and targeted construction commencement by the end of calendar year 2021. We are enthusiastic about a partnership with like-minded visionaries like yourselves to see to it that Springfield’s downtown momentum continues and flourishes for the future. Thank you for your interest, consideration and trust in what Masaka Properties LLC has done and will continue to do with your gracious help. Respectfully, David B. Loveall, Partner Masaka Properties LLC Attachment 1, Page 3 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” Design Optimization & Infrastructure Study 8-12 weeks $39,500 total Architectural Services 20,000$ Campfire Collaborative Site Survey 3,500$ Branch Engineering Civil consultant 1,500$ Branch Engineering Geotech consultant 2,000$ Branch Engineering Structural consultant 5,000$ Branch Engineering MEP consultant 5,000$ Systems West Engineers 2,500$ Cultivate, Inc. Construction Cost Estimate & Analysis 3-5 weeks $22,000 total 22,000$ Ryan Thomas Construction Economic Feasibility Assessment 3 weeks $14,500 total 7,500$ Len Blackstone 3,000$ Lori Bumgardner 4,000$ Masaka Properties Identify opportunity zone investors, bank lenders, & other funding sources; explore tax abatement options; compile & analyze data from Pro-Forma & develop funding strategy; identify thresholds for financial viability of project, determine optimal building heights/unit counts that 'pencil' & whether there is a funding gap. Funding strategy analysis Establish market conditions for new development based on comparison/analysis of similar developments in the area, considering proximity, development cost, unit types/counts, rental revenue, occupancy rates, etc. Consider additional units from other proposed developments and evaluate rental capacity/saturation point. Compile detailed pro-forma for project, to include hard and soft development costs, loan servicing costs, and projected rental incomes and operating costs. Evaluate improved energy performance opportunities, sustainable product sourcing, waste stream, etc. Outline parameters for pursuing LEED or other green building certification. Sustainability consultant Research grant opportunities (age-friendly community, main street/downtown, historic/cultural, etc.), energy/sustainability incentives, explore eligibility requirements for affordable housing $$$ (mixed income development?) Grants/tax incentives research Competitive Market Analysis & Pro-forma study Construction cost estimating for 3/1 and 5/1 structures, to include systems and design elements generated from architectural analysis. Construction Cost Estimate Topographic survey with property corner boundary control, but without a recorded/filed survey.  Document existing conditions including physical features, elevations, and abutting utilities adequate for civil engineering design. Refine previously explored massing models and develop hybrid 3/1 scheme, with program concepts inclusive of an optional rooftop meeting/event venue. Land use & building code analysis. Coordinate with consultants & integrate input into design schemes. Work closely with contractor & financial consultants to inform construction cost estimate & pro-forma study, and adjust architectural concepts in response to budget findings to determine optimized schemes. Review existing infrastructure, supply, drainage, power, alley restrictions. Soil anlaysis, water table, soil types/characteristics, clay structure, bedrock depth, soil bearing capacity. Evaluate sizing and material options for structure for 3/1 and 5/1 buildings, and/or other variations as determined by architectural or financial studies . MEP systems options and sizing for 3/1 and 5/1 structures; evaluate capacity of existing infrastructure & determine utility service requirements for new development. Fire sprinkler system sizing/supply/access. OPTIMIZATION STUDY SCOPE Attachment 1, Page 4 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” SITE INFORMATION ( ( ( ( ( ( ( ( ( ( ((( ( ( ( ( ((( ( ( ( ( ( (((( ( ( ( (((( ( ( (((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((((( ( (((( ( (((((((((((R ( ( (120'50' 80'3.27 CH64.61' 2 N65° 0 5 ' W 51' 3 49'66'NORTH24' 15' 66' 2 ( 1 0 8 . 4 4 ' ) 4 95'63.20'(80.0')66'6.0' "B" 20'N01°35'07"E450'50' 57.6' 5 55'14'1 R=915' 65.5' (187.0') 57.13' 143'60'71.04'33'7 66' 6 4 60' 4.51' N72°0 4 ' W33'66' OF 48.39'STREET49' 66.04' 21' 100' 10 . 0 9 ' 5 STREET 1 50' 86' 50.0' 66' 46' 0.66'45.94'SOUTH63.5'21 363.33'30' (61') 136' 70.30' 66' 100' 40.7' 66' 55' 1 33'14'11 N86°59'05"W 63.63'120'31' 7 33' 66' 3 164'(96.33')8 33'80'49'66' 2 74'15' 50' 60'S00°47'30"W60' 9 33'59' M/L16'51' 45' 7 MILL256.97'40'70.03'S88°02'04"E 199 LK = 131.34'140'66' 6 3 16.5'64.61' 132.10' 18 66'113'7 92' 53 38'3.97'4.46'VACATED 50' 2'120'60'136' MILL 66'60'22' 143.00'33'689.60' 249' 264' 4 12 177.87' 60' 1 45' 2 50'20'2 STREET63.30' 6 95.82'60' 74.4' 57.6'74'33'66'78'120'3 69.96'1 4 67'72.52' 20' 267' 60' 8 66'50'66' 3 35'63.33'STREET 6000 6 1 . 7 7 '17'200'16' 7 N0°32'36"E122' 66' 464.61' 105' 167' 20' 19 13.66' 10 VACATED(S89°45'30"E)120'20'66' 9 80'485.89' 24' 143.00' 191.40' 51' S.38735 50' 34.06' 863.5'R=447.46'S86°21'28"E 80' 6 5 27'BRIDG E ( W E S T B O U N D) 5 65.5'80'50' 66' 46' 2.98 CH = 143'220'66' 65.5' 62.70' 68.28' 50' 8 2 33' STA 387+80 7 66' 51' 66' S.29695 47' 164'STREET25.5' 1.48'107'100' 3 120'84.63'90'63.5'SOUTH 66' 2 153.0'127'127'4 257.80' 3 N86°51'35"W 46' N89°47'30"W121.40'45 27' 150' 10 33'53.20'33'35' 162.0'63.5'8 S65°15' W 50'120'106' (138') 10.29' 33' 33' 9 66'80'150' 4 (123') 614'1 74'33'6 65.5'200'(185.0') 95' 8.4' 66' 1 66' (115.0') 20'145'33'37'15' S.29695 "A"2NDN75° 1 3 ' 3 0 " W 24' 66' S88°02'04"E 78.30' 7 2 66'40.0'63.5'14. 6 5 ' 8 4 39 5 (60') 69.37' 50.09' 64.79'90'99.01'25'63.5'5 83' D 65.0'60'49.23'(122') 143.00' 59.5 5 '127'40.00'7 92' 66' S89°45'30"E 27' 3 50' 15' 1 66' 282.63' 66' 3 30'95'200'STREET 66' S89°45'30"E (30.00')94' M/L63.33'1 S89°44'E 204' 5 N79°23'30" W 50' 4 66'120'66' 150'57'SPRI N G FI E L D 4 30' 112' 57.09' 17' 7.0' N2°13'11É 3RDN3 1 ° 4 5 ' 5 "W S86°21'28"E 48.39' 1 72.6 5 '63.33'66' STREET 5 S85°08'W 235.74' 100' 20' RACE120'63.33'2 N84°34'45"E 51' D 25'120'143.00' 191.40' 15' 8 2.90 CH = 40.7' 50' S86°21'28"E63.5'27' 6 7 143'66' 65.0' 66'27'120'33'10'50' 4 (63.33')96.33'BRIDG E ( E A S T B O U N D) 46' 2 66' 65.5' 64.79' 69.1 1 ' 8 6 60'(59')63'66' 66'35.03'N0°32'36"E30'14'90'NE COR BLOCK 1964.61' MAIN 63.33'2 N65° 1 8 ' W N89°16'W 90'66' 100.32'92'127'36' 66' 87.31'120.60'46 50'66'74'(28') 164.20'(63.33')120'2 10 EAST 164.0 25.5' 3 1 S89°52'30"E (50') 11'120'143' 83'(61') MAP 50'36'5 (130.0') 51' 4 33'57.70'119.91'3 74'10'27'72.6'(125.0')63'14' 2 91.50'60' 16'120'VACATED PER R1624/90-15284SOUTH "A" N72°2 9 ' W 104' 66' 14.57' 3 N69° 1 1 ' W N87°08'50"W 30' (35') 33' 430' 840.0'71.04'63.5'20 "A" 107' 13.66' 94.86' 66' VACATED 67015' 50' 50'63.33'VACATED STREET74.59'LC=82.75' (163.50')95'(28')(22') PLAN O F SPRI N G FI E L D S.37381 50.03' S86°21'28"EN84°26'46"E 45.19'S87°57'33"E 98.16' N48°00'19"W 6.28'SOUTH178.24'SOUTHN74°05'14 " E R=995' 0.3 AC 0.15 AC0.35 AC0.18 AC0.31 AC 0.4 AC 0.14 AC 0.34 AC 3.76 AC 0.15 AC0.06 AC0.38 AC 0.24 AC 0.98 AC 0.08 AC 0.06 AC 0.04 AC 0.31 AC0.33 AC 0.15 AC 0.18 AC0.15 AC0.24 AC 0.18 AC0.14 AC 0.49 AC0.36 AC0.18 AC0.18 AC0.2 AC2.8 AC 0.42 AC 0.36 AC0.43 AC 0.22 AC 0.3 AC0.12 AC0.11 AC0.18 AC 0.28 AC 0.19 AC 0.22 AC 4.94 AC 0.05 AC 0.22 AC 0.13 AC 0.54 AC 6100 48004700460045004300 6200 5900 8100 7800 7600780278047801 7805 7400 760167008500 6601 7500 7501 72006900700068006600 6101 5200530055005700 5100 5000 4900 35003801 3000310032003300340036003900 2800 1101 2700260025001900 1100 1006007008009001000 12001601 8201 64006500 4100 2900 4200 8300 11021103 8400 8200 8000 7300 4000 019-99 SEE MAP 17033523 SEE MAP 17033444 SEE MAP 17033441 SE E MAP 17033531 SEE MAP 17033533 SEE MAP 17033534 SEE MAP 17033524 FOR ASSESSMENT ANDTAXATION ONLYN.W.1/4 S.W.1/4 SEC. 35 T.17S. R.3W. W.M.Lane County1" = 100' CANCELLED 200-500 1300-1600 1700 1800 2000-2401 3700 3800 4400 5400 5600 5800 6000 6300 7100 7700 7803 7900 17033532SPRINGFIELD SPRINGFIELD 17033532 LCATJCG - 2018-11-06 08:20REVISIONS09/20/2011 - LCAT113 - CONVERT MAP TO GIS08/07/2017 - LCAT174 - PTN OF TL 5500 & TL 5900 INTO ROAD08/15/2018 - LCAT174 - MAP CORRECTION TL 400011/06/2018 - LCAT174 - ACRE AND MAP CORRECTION TL 4000 DevNW Project Site Mason Lodge Right: View of site looking Northwest, from intersection of Main Street and Pioneer Parkway E Right: Site includes buildings/ lots at 230 & 240 Main Street and adjacent parking lot along Pioneer Pkwy E. Right: Site is comprised of two tax lots, #5000 & #5100 Zoning Information: Total site area: 11,150 s.f. (93’ x 120’) Zoning: Mixed Use Commercial Setbacks: Zero setbacks for buildings Building height: 90’ allowable, no shading restrictions Parking: Parking exempt, but project intends to provide as much parking as feasible on-site Proposed address to reclaim street number of 248 Main Street, the original address of the Springfield Hotel (not currently assigned/in use.) Attachment 1, Page 5 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” DRONE IMAGERY Aerial view of the site looking South/Southwest Aerial view of the site looking North/Northeast Aerial view of the site looking Northwest Attachment 1, Page 6 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” View @ 30’ DRONE IMAGERY View @ 40’ View @ 50’ View @ 60’ View @ 70’ Attachment 1, Page 7 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time”13' - 6"26' - 6" MIRRORED DOOR ON CLOSER 5' - 0"WARDROBE DESK/TV KITCHENETTE DESK/TV STUDIO APARTMENT DBL QUEEN HOTEL RM WARDROBE DESK/TV KITCHENETTE KING/BIZ. HOTEL RM FAMILY SUITE RM. DESK/TV BUNK Project number Date Schematic Room Layouts 19018 SPRINGFIELD HOTEL 2020.06.17 DN DN DN UP - - 1 1 2 2 3 3 6 6 a e g 4 5 5 27' - 0"6' - 0"27' - 0" 21' - 4"21' - 4"21' - 4" f20' - 5 3/8"13' - 6"13' - 6"13' - 6"13' - 6"13' - 6"13' - 6"18' - 6 5/8"d c b 536 SF Suite[202] 310 SF King[204] 310 SF King[206] 310 SF Queen x2[208] 310 SF Queen x2[210] 310 SF Queen x2[212] 526 SF 2K Deluxe[214]227 SF Single Queen[213] 435 SF 2Q Deluxe[209] 310 SF Queen x2[207] 310 SF King[205] 304 SF King[203] 471 SF King Deluxe[201] 256 SF King[216]256 SF King[217] 239 SF Bunk Rm[220] 193 SF Queen + Bunk[221] 186 SF Queen + Bunk[222] 289 SF Office/Staff[251] 15' - 7 1/4" 23 SF Elect.[252]5' - 0"40 SF Utility[253]5' - 0"5' - 0"3' - 2"253 SF Queen x2[218] 253 SF Queen x2[215] 239 SF Bunk Rm[219] 277 SF Common Area[250] 886 SF Lounge/Circulation[200] 295 SF Balcony[42] 11' - 1 1/4" 232 SF Single Queen[211] JOB SCALE DRAWN BY CHECKED BY DATE REVISIONS:PLOTTED ON:CAMPFIRE COLLABORATIVE: ARCHITECTURE & DESIGN, PC541.914.0334hello@campfirelab.comwww.campfirelab.com 1" ACTUAL IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE TO BE ENLARGED OR REDUCED AFFECTING ALL LABELED SCALES. 1/8" = 1'-0" 12/13/2019 11:16:42 AMA1.02 19018 Author CheckerOwnerSPRINGFIELD HOTELLevel 2 Floor Plan248 Main Street, Springfield2019.12.13 No. Description Date 1/8" = 1'-0"1 Level 2 Floor Plan MASSING STUDY - 2 over 1, with rooftop terrace Commercial: 6027 s.f. w/ 5 tenant spaces; plus 1908 s.f. shared lobby/bar/meeting space on ground floor Living/sleeping units: 34 units, 186-671 s.f. ea Parking: 21 stalls along alley This was our earliest scheme, which incorporated the Masonic Lodge as part of the scope, aligning the second floor plates of the existing & new buildings for shared access to the new elevator/egress stair. Attachment 1, Page 8 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” UP -- - - - - 1 1 2 2 3 3 6 6 a a g g 4 4 5 5 16' - 9 3/4"16' - 6 1/2" f d c b 776 SF Tenant Space[140] 785 SF Tenant Space[130] 775 SF Tenant Space[120] 692 SF Lounge/ Circulation[100] 211 SF Trash[104] 18 parking stalls4 commercial tenant spaces h h 26' - 0 7/16"24' - 6" m 1471 SF Tenant Space[105] JOB SCALE DRAWN BY CHECKED BY DATE REVISIONS:PLOTTED ON:CAMPFIRE COLLABORATIVE: ARCHITECTURE & DESIGN, PC541.914.0334hello@campfirelab.comwww.campfirelab.com 1" ACTUAL IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE TO BE ENLARGED OR REDUCED AFFECTING ALL LABELED SCALES. 1/8" = 1'-0" 9/4/2020 2:48:53 PMA1.01 19018 JLF N/AMAIA HARDY & TAYLOR LARSONSPRINGFIELD HOTELGround Floor Plan1145 6TH STREETSPRINGFIELD, OR 974772020.09.04 1/8" = 1'-0"1 Ground Floor Plan No. Description Date DN - - 1 1 2 2 3 3 6 6 a g 4 4 5 5 45' - 1 3/4" 16' - 9 3/4"16' - 6 1/2" f 83' - 7 1/4"36' - 5"d c b Balcony[42] 24' - 4" h h m 1764 SF Courtyard[315] 10 One-Bdrm Loft Units1 2-Bdrm Loft Unit + Podium-level courtyard+ Public balcony @ Main St. JOB SCALE DRAWN BY CHECKED BY DATE REVISIONS:PLOTTED ON:CAMPFIRE COLLABORATIVE: ARCHITECTURE & DESIGN, PC541.914.0334hello@campfirelab.comwww.campfirelab.com 1" ACTUAL IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE TO BE ENLARGED OR REDUCED AFFECTING ALL LABELED SCALES. 1/8" = 1'-0" 9/4/2020 2:49:12 PMA1.02 19018 Author CheckerMAIA HARDY & TAYLOR LARSONSPRINGFIELD HOTELLevel 2 Floor Plan1145 6TH STREETSPRINGFIELD, OR 974772020.09.04 No. Description Date 1/8" = 1'-0"1 Level 2 Floor Plan UP UP WasherDryerWasherDryer DESK/TV7' - 5 1/2"14' - 3 1/4"28' - 11"15' - 6"10' - 0"2' - 6"11' - 3 1/4"3' - 0"7' - 7"2' - 8"2' - 8"3' - 0"3' - 0"10' - 0"1' - 8"5' - 0"COATS/BIKE STUDIO APARTMENTCLOSET DESK/TV KITCHENETTE PANTRY/ LINEN ACCESSIBLE BATHROOM COATS/BIKE 1-BDRM LOFT UNIT PANTRY/ LINEN ACCESSIBLE BATHROOMCLOSETCLOSETLOFT BEDROOM JOB SCALE DRAWN BY CHECKED BY DATE REVISIONS:PLOTTED ON:CAMPFIRE COLLABORATIVE: ARCHITECTURE & DESIGN, PC541.914.0334hello@campfirelab.comwww.campfirelab.com 1" ACTUAL IF THE ABOVE DIMENSION DOES NOT MEASURE ONE INCH (1") EXACTLY, THIS DRAWING WILL HAVE TO BE ENLARGED OR REDUCED AFFECTING ALL LABELED SCALES. 1/4" = 1'-0" 9/4/2020 2:49:46 PMA1.05 19018 Author CheckerMAIA HARDY & TAYLOR LARSONSPRINGFIELD HOTELSchematic Room Layouts1145 6TH STREETSPRINGFIELD, OR 974772020.09.04 No. Description Date TYPICAL UNITS: (22)1 Bedroom Loft: 561 s.f. (390.5 ground floor, 171 s.f. loft) + ~60 s.f. balcony (22)Studio Flats: 390.5 s.f. + ~60 s.f. balcony CORNER UNITS: (2)2 Bedroom Loft: 803 s.f. (632 s.f. ground floor, 171 s.f. loft) + balcony (2)1 Bedroom Flat: 632 s.f. + balcony MASSING STUDY - 4 over 1, with optional 6th floor penthouse & rooftop event space Commercial: 3807 s.f. w/ 4 tenant spaces on ground floor; 1764 s.f. podium-level courtyard Residential units: 35 units, 390 - 803 s.f. ea Parking: 18 covered stalls under podium This was our grandest scheme, which would nearly max out the allowable 90’ height limit if 6th floor/ rooftop spaces included. Attachment 1, Page 9 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” HISTORICAL IMAGERY Sanborn Fire Map from 1907 - shows the Springfield Hotel at the corner of Main Street and 3rd (now Pioneer Pkwy E). Railroad tracks run along 3rd Street, spurring off of the main line south of downtown The map also shows the Town Hall and Fire Station (Hose House & Hose Tower) to the west of the hotel. The map notes that the fire department was comprised of 20 volunteer members, and had 2 hose carts and 1000’ of 2-1/2” hose at the time. At the back of the site, note the small building labeled “Calaboose.” This was the 1-rm jail cell behind the town hall. This fire bell now resides in City Hall, on loan from the Springfield Museum Original fire bell Attachment 1, Page 10 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” HISTORICAL IMAGERY October 22, 1910 - grand opening celebration of the new electric streetcar line connecting Eugene and Springfield. The crowd is gathered around 2 flag-decorated streetcars in front the of the Springfield Hotel on Main Street. Ladies in fancy hats enjoy the celebration from the upper balcony of the Hotel. According to the Lane Co History Museum, “Eugene officials and citizens rode the cars from the Southern Pacific Depot at 4th Avenue and Willamette Street in Eugene past the University of Oregon campus, through Glenwood on a trestle, and then over the newly constructed streetcar bridge over the Willamette River into Springfield.” Image c. 1908 shows Cadillac parked in front of the Springfield hotel. Campaign poster in the front window of the hotel is promoting George Chamberlain in his controversial 1908 campaign, when he ran for a Senate position while still holding the position of Oregon Governor. Attachment 1, Page 11 of 12 M A S A K A P R O P E R T I E S L L C “Developing Communities One Building at at Time” HISTORICAL ASSETS Right: The original jail cell bars from the “Calaboose” were uncovered during the demolition of the Hotel in the late 1950’s. Former owner Ralph Smeed (grandson of Rosa Montgomery who ran the hotel from ~1910 until its closure) recently donated these to the Springfield History Museum. Right: We have compiled dozens of clippings from old newspapers mentioning the Springfield Hotel, its patrons, ownership history, amenities, and a broad spectrum of business and social activities that connected early Springfield business leaders. Far right: Springfield’s first fire alarm bell, which now resides on display at city hall. According to the plaque, the City’s Fire committee bought the 375-pound bell in 1907 from Chicago for $57.50. The city stopped using the bell in 1920 when the Booth Kelly Mill volunteered its loud steam whistle use as Springfield’s official fire alarm. Right: Original guest ledgers from the Springfield Hotel, provided by Ralph Smeed. Attachment 1, Page 12 of 12 M E M O R A N D U M Springfield Economic Development Agency Date: 1/11/2021 To: Nancy Newton, City Manager BOARD From: Courtney Griesel, Economic Development/CMO BRIEFING Subject: Downtown SUB Property Purchase Summary MEMORANDUM ISSUE: The Springfield Economic Development Agency (SEDA) might authorize acquisition of Springfield Utility Board (SUB) owned downtown real property in order to facilitate a mix of future site redevelopment and improvements. The transaction between SEDA, the City and SUB includes; • SEDA acquisition of three taxlots (described below as sites A & B; Map 17-03-35-32, Taxlots 4900, 5000, & 5100) from SUB in an amount not to exceed $790,000.00. • City sale of one taxlot (described as City Lot 2900) to SUB in an amount of $170,000.00. This purchase might enable two future negotiations for Downtown redevelopment opportunities; New market rate housing on Site A (48 Units/49,000SF) by Masaka Properties Renovation of commercial on Site B (8,000 SF Lot) by existing business, Queen Bee Tattoo BACKGROUND: Masaka Properties LLC (Masaka) has requested SEDA support in the acquisition of Downtown redevelopment property from Springfield Utility Board (SUB). Based on 2020 SEDA Board direction and additional information gathering and negotiations with SUB, property negotiations for acquisition and disposition of Downtown property are recommended as outlined below; • Site A and Site B – SEDA acquisition from SUB for a total purchase price of $790,000.00. This price reflects the previous SUB purchase price of the 0.40 acre site at $840,000.00 in 2018 with additional discount applied for needed Site B building repairs. • Site A – SEDA negotiation for future sale of property to Masaka for redevelopment. Following completion of Masaka redevelopment and feasibility studies, terms of sale from SEDA to Masaka might be negotiated to facilitate support of envisioned redevelopment for this portion of the site. Existing Site A buildings are not anticipated to remain as part of redevelopment. Tenant relocation costs may be incurred and are a planned obligation within the Urban Renewal Plan. Attachment 2, Page 1 of 2 MEMORANDUM Page 2 • Site B – SEDA negotiation for future sale of property to existing business, Queen Bee Tattoo. The existing tenant located within Site B has provided a letter expressing interest in acquiring the building they currently occupy. SEDA might negotiate terms of sale to support business ownership and reinvestment. The existing 6,098 SF building is expected to remain. Sale to the current tenant avoids tenant relocation impacts and eliminates the need for SEDA to carry landlord responsibilities on the property. • City Lot – City sale of City owned parking lot to SUB for $170,000.00. This price is based on completion of a 2020 appraisal and supports SUB’s desire to complete assembly of properties adjacent to their Downtown offices. This site is currently vacant and in anticipation of this request, the City stopped issuing parking permits on the 23 spaces within this lot in 2020. RECOMMENDED ACTION: The SEDA Board is requested to discuss and authorize SEDA acquisition of SUB property (Map 17-03- 35-32; Taxlots 4900, 5000 & 5100) in a price not to exceed $790,000.00 and direct this authorization as contingent or not contingent on completion of Masaka assessment work related to redevelopment of taxlots 5000 & 5100. If purchase of SUB owned property by SEDA is not contingent on outcomes of Masaka assessment work, the SEDA Board is requested to authorize initial discussions and negotiations with Queen Bee (tenant) related to their expressed interest in purchase of taxlot 4900. Attachment 2, Page 2 of 2 September 6th, 2020 To SEDA Board Members, We are excited to propose a plan for the purchase of the property located at 226, 228 and 230 Main Street, Springfield, Oregon. The scenario we would like to offer is a purchase price of $365,000 payable over a 15 year term. For the first two years we would pay $2,000 per month and the remainder of the loan would be $2,620 until the balance is paid, at an interest rate of 2.99%. We propose this in consideration of the added costs of commercial building ownership including an added $400 per month in insurance and approximately $200 per month in property taxes. This building has been the home of Queen Bee Tattoo and Salon, Lifetime School of Tattooing and the main offices of the Evergreen Tattoo Invitational for the past 6 years. Our businesses have provided fine art, expert tattooing and international exposure to the City of Springfield. We provide family wage jobs for our nine regular contractors, and two full time receptionist positions. We are licensed by the Oregon Higher Education Coordinating Commission and provide tattoo training for artists including disabled veterans, individuals suffering from PTSD and other displaced workers through different programs. With Covid 19 we were forced to close all three companies for two months. There was a lot of stress and uncertainty. Fortunately we are able to say we did not lose a single artist or employee, and in fact we were able to hire a second, full time receptionist and two new artists (soon to be three). Once we were able to reopen, we hit the ground running. As a result, we have been met with great success. We have had one of the most profitable quarters in our company’s history. It would benefit the downtown area to keep a stable, established business. Our clients support the surrounding businesses when they come to downtown. Our first shop opened in downtown in March 2008 and is still thriving at 14th and Main Street, 12 years later. We are a fixture in the neighborhood. The stability that building ownership could provide to us would allow us to expand into the upstairs space and grow all three businesses. We have plans to improve the face of the building including adding new lighting, paint, signage and more. We would like to beautify the building while maintaining the esthetic and charm of the 120 year old structure. The interior needs many upgrades as well and with this plan we will be able to cover the cost of those improvements while continuing to operate as usual. We respectfully submit this proposal to the board and request that you consider us for this opportunity. We believe this is a win for us, the proposed hotel project and for the city. We know that we can continue to be an asset to the downtown area for years to come. Sincerely, Erin and Riley Smith lifetimeink@gmail 541-743-3357 Attachment 3, Page 1 of 1