Loading...
HomeMy WebLinkAboutPermit Building 1992-05-04COM M ERCIAL/lN DUSTRIAT- PERMIT APPLICATION 225 Fiftn Street, Springfield, Oregon 97477 LOCATION OF PROPO D K: SPFlINGFIELE, U JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT:ASSESSORS MAP: \ I D.q i In I PHONE: tu OWNE ADDR c ZIP:STATE: CRI DEMOLISH OTHER VALUE: D N FWO REMODEL ADDITION MECHANICAL: NAME ADDRESS PHONE NAME ADDRESS EXPIRES PHONE l"H ITECT: ELECTRICAL: CONT CONST. CONTRACTOR # GENERAL: PLUMBING PLU MBIN G NO.FEE CHARGE Single Fixture Relocated Bld (new fix. addtl I ) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backflow Device TOTAL PERMIT MECHANICAL Nr)FFF EHA FIG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent Sys from AC tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE _ ZONING HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: * OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: # OF BLDGS CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT,VALUE q) TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY /5.7s BUILDING PERMIT / 5,ao PLU M BI NG DEMOLITION 5% State Surcharoe ,vs 5% State Su rc haroe MECHANICAL FENCE VALUE $ 5% State Su rcharoe SIDEWALK FT, SUBTOTAL PE RM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERIMIT FEES EXCLUOING ELECTRICAL LAND USE: WATER HEATER: - REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC1AL tNSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 0f the State Speciatty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during \ ./ CURTAIN WALLS construction of the following w6rk. A\,/ FOOTTNGS & FOUNDATIONS: copy of the special testing reports shall 7- i"-6" ."0-"'after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 25OO P.S.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made after au insrab buirdins Ei::5 ::.']ff 3ffi:It"f,H;:r" FIRy,Hyfl"t,Y5tT',rrz oservice equipment, conduit, and vents are complete andpiping, accessories and other incirtarv equipment items are ffiH::[i]i""ii:,X i,[[3::: 3l?lf],?E]?H,?i,.THi".in place but before any tighte-ning operations. (306concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43_g.drainage lines. To be made board interior wall covering isprior to covering or fiiling appried. spEclAL GRADTNG,trenches. ,NDERFL.oR: p,umbins l:?:,fl';'fm'J3l:[i"' El;iUt'iiil-tli.:,flb'il,'L electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city's posr & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 U'B.C' insulation, decking or floor plastering is applied or before STDS' 25-1011)' sheathing. " Sypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or lloor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. RooF sHEATHTNG AND iHFS^H?,tJ"r:'of""X'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landScaping, parking lot striping, etc. must be completed before requesti ng this inspection. FINAL BUILDING: Requested after the final plumbing, etectrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. PLANS REVIEWED BY onre 7-?-> =-a By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I furtheragree to ensure that all required inspections are requested at the propertime, that project address is readable from the ard is located at the front of the property, and the approved set of plans will remain on the site at all Signature Date pe n.? -r-/- * street, that the times during co VALIDATION AMOUNT RECEIVED: -f RECEIPT *:RECEIVED BY: DATE PAID + ). ADDITIONAL COMMENTS: C.: