Loading...
HomeMy WebLinkAboutPermit Building 1994-07-11COMM ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 13 SPRINGFIELO LOCATION OF PRO ASSESSORS MAP: K: JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: STATE: OWNE ADDRESS: CITY: PHONE: ZIP: I E:DEMOLISH OTHER DESCRIPTION OF WORK: NEW - REMODEL ADDITIO ADDRESSNAME PHONE CONST. R#ADD RE EXPI RIL P ONCONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: GENERAL: PLUMBING P NO.FEE CHARGE Single Fixture Relocated Bl (new fix. add dg. t t) Water Service ft Sanitary Sewer ft. Storm Sewer I L. Backf low Device TOTAL PERMIT MECHANICAL NN trFF EHA FIGF Furnace/burner & vent <100.000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cool er Vent Fan/Single duct Vent sys AC tem apart or htg.f rom Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT LAND USE: ZONING* OF UNITS: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: - OFFICE USE 7 OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: VALUESQ. FT.$/SQ. FT. TOTAL VALUE OF PROJ x X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER DATEPLAN CHECK FEE BYRCPT' BUILDING PERMIT t3.@ DEMOLITION 5% State Surcharoe -15 5% State Surcharoery3%45 FENCE VALUE $ 5% State Surcharqe SIDEWALK FT. SUBTOTAL PERM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT U,.o LO PLUMBI NG TOTAL PERMIT FEES EXCLUDING ELECTRICAL WATER HEATER: It is the responsibility of the permit hold, 726-3769 (recorder), state your City desig for lnspection. Requests received before the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work ls covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel ln place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equi pment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulatlon, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. REQUIRED INSPECTIONS ROUG}I PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN W\LLS FIREPLACE: Prior to placing facing materials and before framing lnspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrlcal, plumbing and mechanical are approved. INSULATIO].T & VAPOR BARRIER: To be made after all insulation and required vapor barriers are ln place but before any lath or gypsum board interlor wall covering is applied. 4..,YiHea sEPARATToN wALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interlor and exterior, is in place but before any plastering is applied or before gypsum board loints and fasteners are taped and f inished. S]DEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prlor to placing concrete. PAVING: After gravel is in, place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. 12722 t) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B'C. Standards 43-8. SPECTAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspectlon Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) "ln addition to the inspec- tions specifled, the Building Officlal may make or requlre other inspections of any construction work to ensure compliance with the Bullding, Clty or Development Code. er to see that all inspections are made at the proper time. To request an inspection, call nated job number, job address, type of inspection requested and when you will be ready 7:00 a.m. will be made the same working day, requests made after 7:00 a,m. will be made atu ,lSi IDate natu andstate atthByfa,caref uave inedexam hesree,ag ly com eted tocat ann dd oplappl here certi that all fonbyty rmation reInhe andtrue an d cert th at alandcorrect,ty work rmed alsh be danyperfo ne accordancen thwi Ordthe nanceofethciSofefidthandLawsthoftyngpriSeotateonlatntowohederkbescndpertregonsheredanNOthaton,CCU NCYPA be omade ctustru re without ssion theof ulB ldanypermi slon.Dlvi fu rtherSafetyng cert onlthatty contractorsv and empl oyeesarewhoncotancewlORSh.0701 5 Ubempl onsed h s ec t.proj rtfu he ree eo thnsure alat u red nag J ti Son arereqpec atuested hereq th ectproperme,proj add ress read eabl from hereetstthattheiscardatfrohentpermofethanprodheSrovedetperty,pp o san wl re almpl onn he teSI dlattmedSiluconsrU VALIDATION:AMOUNT REC RECEIPT # DATE PAID BECEIVED F'NAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT FINAL BUILDING: Requested after the final plumbing, electrical, mechanlcal and Fire Department inspectlons are made and approved. No occupancy of the premises can be made until aCertificate.of Occupancy has been issued by the Building Divisionand posted on the premises. SITE PLAN REVIEW BOARD: Must be requested 2 d ays in advance the date you wish inspection. All proJect condit ions such as ing,parking lot striping, etc. must be completed beforeis inspection.questing th ADDITIONAL COMMENTS: -S REVIEWED BY DATE