HomeMy WebLinkAboutPermit Plumbing 1991-12-31COMM ERCIAL/ I N DUSTRIAL
PERMIT APPLICATION
225 Fitlh Street, Springfield, Oregon 97477
LOCATION OF PRO
ASSESSORS MAP:
POS D WORK:
SPRINGFIELO
JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
TAX LOT:
OWNE
CITY:
ADD
STATE:
HONE:
ZIP:
(
VALUEDDITION DEMOLISH OTHER
DESCRIPTION OF WO
NEW- REMODEL
ELECIRICAL:
NAME ADDRESS PHONE
ADDRESS EXPIRES PHONE
ARCH ITECT:
CONTRACTOR'S NAME
MECHANICAL:
PLt.J M BING:
GENERAL:
CONST.
CONTBACTOR #
PLU MBING
NO.FEE CHARG E
Single Fixture
Relocated Bld
(new fix. addtl
I
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
MECHANICAL
NO trFtr NHA EIGF
Furnace/burner & vent
< 100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
ZONING
LAND USE
HANDICAP ACCESS:
FLOOD PLAIN
LIGHTING POWER BUDGET:
WATER HEATER
* OF UNITS:
OCCY GROUP:
* OF STORIES:
OUAD AREA:
* OF BLDGS:
CONSTR. TYPEr
HEAT SOURCE:
VALUE$/SQ. FT.SQ. FT.
TOTAL VALUE OF PROJ
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#DATEPLAN CHECK FEE BY
BUILDING PERMIT PLUMBI NG T3d)DEMOLITION
5% State
Surcharge
5% State
Surcharqe /45
MECHANICAL FENCE
VALUE $
5% State
Surcharge
SIDEWALK
FT.ID OO SUBTOTAL
PE RM ITS
PAVING CURBCUT
FT.
SYSTEMS
OEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
(
I
I
i
\
I
_ OFFICE USE -
V REOUIRED INSPECTIONS \I
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated.iob number, lob address, type of inspection requested and when you will be ready
for inspection. Flequests received before 7:OO a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical,tary sewer,
storm sewe
drainage lin
prior to covering or filling
trenches.
UNDERFLOOR: PIumbing,
electrical, mechanical. To be
made prior to installation of
f loor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING ANO
NAILING: Prior to installing
any roof covering.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
the rough electrical, plumbing HIGH STRENGTH BOLTING
P.AVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 I)
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.ll &
Chapter 29)
GLU.LAM BEAMS: tnspection
Certif icate by an approved
agency, furnished to the City,s
Building Division before
beams are placed. (2501 U.B.C.
STDS. 2s-10,11).
made
STRUCTURAL MASONRy: (306
a.7'
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
slrE PLAN REvrEw BoARD: Must be requested 2 days in advanceof the date you wish inspection. Ail project conditioni such aslandscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection.
FINAL BUTLDTNG: Requested after the finar plumbing, erectricar,mechanical and Fire Department inspections are maie andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that ail informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with the ordinancesof the city of springfield, and the Laws of the state of oregon pertaining to the work described herein, and that No occupANcywill be made of any structure without permission of the Building safety Division. I further certify that only contractors and employeeswho are in compliance with oRS 701.055 wiil be used on this project.
Si gnatu Date
roper time, that project address is readable from theapproved set of plans will remain on the site at all
fu hert toree SUen re alhat reag U red NS ti no SY are UES attedpecreq eth p
atth eth rm citSreet ard locS ated thpe e off ront eth dan heperty,pro
ti dmes 1U n co NS ti n.os
VALIDATION AMOUNT RECEIVED:
RECEIPT +:
DATE PAID:
RECEIVED