HomeMy WebLinkAboutPermit Building 1992-07-30SPRINGF3ELE,
ffi#
TuezzCOM M ERCIAL/IN DUSTRlAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477 h,
JOB NUIVlBER
I NSPECTION LIN E: 726-3769
OFFICE: 726-3759
to. s+0-LOCATION OF PROPOSED WORK
ASSESSORS MAP TAX
OWNER PHoNE: tlts-st" tt
CITY:STATE:&-ADDRESS:
PLEAGA1S {-\(u--ZIP:?-?c{ s S
Mc tGuLte Or ue- N,ulrroas
P.o. @o* tn 4o
VALUE:x-ADDITION DEMOLISH OTHER
DESCRIPTION OF WORK:
NEW- REMODEL
ADDRESSNAME PHON E
ADDRESS PHONE
Z'E
ES
PLUMBING Vos
a K
272 vAN B,oaf;,,J <t ^<
ARCHITECT:
CONST.
CONT
1J85 -irss I
MECHANICAL:
ELECTRICAL:
CONTRACTOR'S NAME
G EN ERAL:
PLU MBIN G
NO.FEE CHARGE
/Single Fixture z*a)/5 do
Relocated Bldg.
(new fix. addtl)
Water Service
ft
Sanitary Sewer
ft
Storm Sewer
ft
Backf low Device
TOTAL PERMIT /5u2
MECHANICAL
Nr.|FEE I cxancr2Furnace/burner & vent
< 100,000 BTUs 2ttl,/5 co
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
d uct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE -
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
LIGHTING POWER BUDGEI
WATER HEATER:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
r OF BLDGS:
CONSTR. TYPE:
HEAT SOURCE:
$/SQ. FT,VALUESQ. FT.
TOTAL VALUE OF PROJ
X
X
X sb,*. np
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
BUILDING PERMIT 47 s"PLU N/ BING ,/5"O DEMOLITION
5% State
Surcharoe
' z,Eg 5% State
Surcharge .7t
MECHANICAL/5S.lrr"Ud /9,"u)A,a o FENCE
VALUE $
5% State
Su rcharoe .79 SIDEWALK
FT.
SUBTOTAL
PE RM ITS
PAVING CU RBCUT
FT.
SYSTEMS
DEVELOPMENT
?/,3uTOTAL PERMIT FEES
EXCLUDING ELECTRICAL
TA ) rb ) T /*zz,ervnoo a) T,/.r?ezn ) */ -
*,711&s fu 2--t
FLOOD PLAIN:
NICA
REOUIRED INSPECTIONS
It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call
726-3769 (recorder), state your City designated.iob number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made af ter 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
e covere unt th
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
insulation, decking or f Ioor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 24'15.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
work is to
ese
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
f inished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: ln accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be f urnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 PS.l. (306 a.1)
STRUCTURAL WELDS:
Performed on the jol:. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
ti ghteni ng operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FILLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU-LAM BEAMS: lnspection
Certif icate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
sTDS. 25-10J1).
STRUCTURAL MASONRY: (306
a.7)
.ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE OEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this i nspection.
- X.=- FINAL BUILDING: Requested after the final plumbing, electrical,/ ---rnechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
PLANS REVIEWED BY DATE
By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
7-sr-?LSignatuDate
n.times duri
?/,3b
57 Zs
VALIDATION AMOUNT RECEIVED
RECEIPT *:RECEIVED BY:
DATE PAID
+
ADDITIONAL COMMENTS:
-
,a I
Permits are non-transferable and expire
if vork is not started L,ithin 180 days
of issuance or if vork is suspended for
180 days.
2. CONTRACTOR ONLY
Electrical Contractor
Add r:es
Ci ty Phone
Supe rv i sor cense Number
Expiration Date
Con:;tr Contr. Number
Expiration Date
Signa of Su pervi B1e trician
c
Owners Name
Add ress
Ci ty Phone
OVNER INSTALLATION
The installation is being made on
property f ovn vhich is not intended
for sale, lease or rent.
Ovners Signature:
DATE:
RBCEIPT
5l,t llNGl'tr:Ll,
Hiscellaneous (Serv
-Each installation
Ptrmp or i rrigat ion
Sign/Outline Lighti
Limi ted Energy/Res
Limi ted Energy/Comm
SIETOTAL OF ABOVE
5Z State Surcharge
TOTAL
Temporary Services or Feeders
Installatlon, Alteration or Relocation
97477 i
72,6,3769
';'umcmr
ab
CAL PERHIT APPLICATION
City Job Number
HuIti-FamiIy per dvelling unit.
Service Included:
Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereo f
Each Manuf'd Home or
Modular DweIIing
Service or Feeder
$ 8s.00
$ 1s.00
$ 40.00
Services or Feeders
Installatlon, Alterations or
Relocation:
200 amps or less
201 amps to 400 amps _
401 amps to 600 amps
-
601 amps to 1000 amps_
Over 1000 amps/volts
Reconnect 0niy
200 amps or 1ess
201 amps to 400 amps _
Over 401 to 600 amps
0ver 600 amps or 1000T-fs see rrBrr a Sove
<..)
Branch Circuits
Nev, Alteratlon or Extension Per Panel
225 FIFTII STRtrET
SPRINGFIELD, OREGON
INSPECTION REQUBST:
0FPICE: 726-3759
1 \55-
r,lhorreed Slgndure 3. COHPI,ETE t'EB SCTTEDULE BELOV
ON A. Nev dential-Single or
Sum
B
$ s0.00
$ 60.00
$100.00
$130.00
$300.00
$ 40.00
c
$
$
$
00
00
00
$ 3s.00 --=5
40
55.
80.
E
5
one Circuit --LEach Addi tional
Circui t or wi th Service,
or Feeder Permi t L0 $ 2.oo I}p
ice/feeder not included)
$ 40.00
$ 40.00
s 20.00
$ 36.00
RIICIIVED I}Y
ng_
d
oe
COM M ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
SPRIilGFIELO 7fJOB NUMBEFI
INSPECTION LINE: 726-3769
OFFICE: 726-3759
B
LOCATION OF PROPOSED WORK:
ASSESSORS MAP:/?o? ?S- 3l TA.X LOT:o 17 L,
PHONE
STATE:ZIP
c
C,ACITY:
ADDRESS:
OWNER
NEW
-
REMODEL ADDITION DEMOLISH OTHER VALUE:
DESCRIPTION OF WORK:
MECHANICAL:
NAME ADDRESS PHON E
ADDRESS EXPI RES PHON E
747-738
CONTRACTOR'S NAME
ARCHITECT:
CONST.
CONTRACTOR #
GENERAL:
PLUM BI NG
PLU MBIN G
NO.FEE CHARGE
Single Fixture
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
Backf low Device
TOTAL PERMIT
MECHANICAL
NO FEF CHARGF
Furnace/burner & vent
<100,000 BTUs
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Ventseparate r
Stationary evap.
cooler
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT
_ OFFICE USE _
LAND USE:
ZONING* OF UNITS:
HANDICAP ACCESS:
FLOOD PLAIN:
LIGHTING POWER BUDGET:
WATER HEATER:
OCCY GROUP:
* OF STORIES:
QUAD AREA:
* OF BLDGST
CONSTR. TYPE:
HEAT SOURCE:
SQ. FT.$/SQ. FT.VALUE
TOTAL VALUE OF PROJ
X
X
SO. FTG MAIN
SQ. FTG ACCESS
SQ. FTG OTHER
RCPT#PLAN CHECK FEE DATE BY
/ 5,7s
BUILDING PERMIT Ntp, 156 PLU M BI NG DEMOLITION
5% State
Su rcharqe ,75 5Yo State
Su rcharoe
MECHANICAL FENCE
VALUE $
5% State
Su rcharoe
SIDEWALK
FT.
SUBTOTAL
PERMITS
PAVING CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
?7/,Ss
ELECTRICAL:
... REOUIRED INSPECTIONS .-'
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:0O a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is in
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms. MECHANICAL: No work is to asphalt or concrete.
be covered until these
UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: ln accordance
ELECTRICAL & and approved' Section 306 0f the State Specialty Code
MECHANICAL: To be made a special inspector shall be employed
before any work is covered. ATTIC DRAFT STOPS & by the owner/ Contractor during
CURTAIN WALLS cbnstruction of the following w6rk. A
FOOTINGS & FOUNDATIONS: copy of the special testing reports shall
To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, all steel in place, but - ^- framing inspection' STRUCTURAL CONCRETE: ln
prior to placing concrete.' )< FRAMTNG: To be made after excess of 25oo PS.l. (306 a.1)
coNcRETE SLAB: To be
r - the roof' all framing' fire
made after ar insrab buirdins 3l::5 ::.':ff 3ffi:It";,Hl:r" FII:,.fl"',X3"t H5lJol',rrr, ,
service equipment, conduit, and vents are complete and
:#lg;""",",:;il:? ?i:'-:'TJ ffi H::l,",ltil:,1'JJ;[i::: 3l?lf],?E]uol[Bi,"T]X"oin place but before any tighte;ing operations. (306concrete is placed. INSULATION & VApOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, Sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum Standards 43-8.drainage lines. To be made board interior wall covering is
prior to covering or f illing apptied. SPECIAL GRAD|NG,trenches.
,NDERFL..R: prumbins l:::,S""=^'f;m',ifl[Hi"' EX:l;t'iii,:li.',5Jb'i],"i
electrical, mechanical. To be - according to plans. chapter 29)
made prior to installation of '/
froor insuration. deckinq or .X LATH AND/oR GYPSUM GLU'LAM BEAMS: lnspection
floor sheathi;g. --- - - -- BOARD: To be made after all Certificate by an approved
Iathing and gypsum board, agency, furnished to the city's
poST & BEAM: To be made interiol and exterior, is in Building Division before
prior to installation of floor place but before any beams are placed' (2501 u'Bc'
insulation, decking or floor plastering is applied or before STDS' 25-10J1)'
eho.ilrin^ gypsum board joints anderreq,rrrrv' fasteners are taped and STRUCTURAL MASONRY (SOG
FLooR TNSULATIoN & finished' a'71
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
uBc 2415.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
'ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot stri ping, etc. must be completed before
requesting this inspection.
FINAL BUILDING: Requested after the final plumbing, etectrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
ADDITIONAL COMMENTS:
PLANS REVIEWED BY DATE
8y signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during constr on.
Signature Date
VALIDATION AMOUNT RECEIVED:/5.75 DATE PAID:
RECEIPT #<5&a,.RECEIVED BY: