HomeMy WebLinkAboutApplication APPLICANT 2/9/2021,City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
Final Site Plan Review
•bPnIN6F1ELD
'ApplicationAlb
iL GVW/
Revised 1/1/08 Molly Markarian 1 of 4
Site Plan: ❑ Minor Site Plan Modification: X
Ma'or Site Plan Modification: ❑
Required Project Information (Applicant: complete this section)
Applicant Name: Nathan Endicott, P.E. Phone: 541-685-7367
Company: Eugene Water and Electric Board Fax:
Address: 4200 Roosevelt Blvd, Eugene, OR, 97402
Applicant's Rep.:
Phone:
Company:
Fax:
Address:
Property Owner: Eugene Water and Electric Board
Phone: 541-685-7000
Company; Eugene Water and Electric Board
Fax:
Address: City Hall Eugene, OR, 97401
ASSESSOR'S MAP NO: 17-02-19
TAX LOT NOS : 03300
Property Address: 3957 Hayden Bridge Road Springfield, OR, 97477
Size of Property: 50.28 Acres X❑ Square Feet ❑
Proposed Name of Project: Hayden Bridge Filtration Plant: Lab Building Puking Lot Project
Description of If you are filling in this form by hand, please attach your proposal description to this application.
Proposal: Pavc parking lot to serve a lab building.
Existing Use: Gravel lot for parking and storage.
I Tentative Case #:
Signatures: Please si n and print your name and date in the auproDriate box on the next a e.
Required Project Information (City Intake Staff., complete this section)
Associated Applications:
Case No.:
I Date:
Reviewed by:
Application Fee: $
Technical Fee: $
Posta a Fee: 0
TOTAL FEES: $
I PROJECT NUMBER:
Revised 1/1/08 Molly Markarian 1 of 4
Signature
I represent this application to be complete for submittal to the City. I affirm that the information identified by the
City as necessary for processing the application is provided herein or the information will not be provided if not
otherwise contained within the submittal, and the City may begin processing the application with the information as
submitted. This statement serves as written notice pursuant to the requirements of ORS 227.178 pertaining to a
complete application.
il%ati[a' Date:
Signature
Nathan Endicott
Revised 1/1/08 Molly Markarian 2 of 4
Final Site Plan Review Application Process
1. Applicant Submits a Final Site Plan Review Application to the Development Services
Department
The application must conform to the Final Site Plan Review Submittal Requirements
Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Final Site Plan Review Submittal
Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
• Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
• The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
• An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
• Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application & Issues Final Approval
• This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
• Applications may be approved, approved with conditions, or denied.
• The City mails the applicant and any party of standing a copy of the decision, which
is effective on the day it is mailed.
• The decision issued is the final decision of the City and may not be appealed.
4. City Drafts a Development Agreement
Applicant and City sign Development Agreement
Final Site Plan and Development Agreement become null and void if construction
has not begun within two years of signing the Development Agreement.
S. City Conducts Final Site Inspection
City authorizes provision of public facilities and services and issues Certificate of
Occupancy
Ravised 1/1/88 Molly Markarian 3 of 4
Final Site Plan Review Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development Services
Department. The applicable application, technology, and postage fees are collected at the
time of complete application submittal.
❑ Final Site Plan Review Application Form
❑ Letter Addressing Conditions of Approval - lists and addresses each condition of
approval, detailing the actions taken and current status of each item.
❑ Five (5) Copies of the Final Site Plan Sets incorporating all required modifications and
applicable conditions
❑ Additional Documents requested as Conditions of Approval as part of the Site Plan
Review decision.
Revised 1/1/08 Molly Markarian 4 of 4
NIG ENGINEERING=
5...117
February 09, 2021
PROJECT NARRATIVE
HAYDEN BRIDGE FILTRATION PLANT:
LAB BUILDING PARKING LOT IMPROVEMENTS
Branch Engineering Inc. Project No. 20-234
Case Number: 811-20-000226-TYPI
Decision Issued: January 28, 2021
The site is composed of one tax lot (TM 17-02-19-00, TL 03300) that is
approximately 50 acres and owned by the City of Eugene. Eugene Water and Electric
Board (EWEB) is working together with the City of Eugene to add improvements to this
site.
The proposal is to primarily improve the parking lot surrounding the developed
buildings and treating the stormwater runoff generated by the new impervious area
added from the new additions. The stormwater runoff generated will be directed to the
existing Swale located to the east of the existing buildings. The Swale will have filtration
capabilities due to the vegetation that will provide water quality treatment before
entering an existing pond located downstream on the site.
There were no conditions of approval issued through the Type 1 Site Plan
Modification Staff Report & Decision document issued on January 28, 2021 by the City
of Springfield Development Review Team. All the required criteria of approval have been
met.
EUGENE -SPRINGFIELD
310 5th Street, Springfield, OR 97477 I p: 541.746.0637 1 w .6ranchengineeringxom