HomeMy WebLinkAboutPermit Electrical 1990-01-25Job Location:
1ozAesessore Map #=l
Subdioision:
1tmer:
PhoneAddress:
tll..RESIDENTIAL..
SPTINGFIEI-D" APPLICAT.
225 North |th Street
Springfie,Ld, 2regon 97477
Building Diuision
7 26-37 53
/PERMIT
,.,
Ddte
DeserLbe Work:
Addition Q)e*r'rnl
Renodel
ValueDate of App Licaticn
(L
General
Plumbing
nical
EJrec t r
1anec tt:trvS
OR
Eoitaty eeaet capped et property Line
Septic totk p,tnped attd fi-tled r,rtth gra;sel
Einal - I{hen abctte ttens are canpleted
and uhen denolition is cottplete o" atruc-
ture mooed atd premiaes cleaneC up.
Hcnes
It ie the
fron the a*Suil.ding
neeponai.bility of the pendt hodet
tre'et. and tllat, the penrtt cotd is
D,iuicion approu^ed plan ehall remain
Located at the fwnt of
on the Building Site at
the property.
aLL tines.
to aee that aLL inapectiota are nade at the prope? tine, that s4sfi e'l'hsse is reacabie
PRocsDURE FoR IN,PECaION .tr_s.9tlEST:CALL 7
@ uiLL be ready forL,iil be nwde the eane dcy, requeets made
26-3769 (recordet) state ltour City, deaignated iob
ncme and plane ;inspection, Contraetors or almere
aftet ?:00 an uiLL be rmde the nect wrking dag.
Iour City Deaigr,ated Job Nunber fs:
nwnbet,iob aCdteee' tYPe
P.equegtg tecel,ted
of inspec'-icn
number.befcre 7:00 an
Q oot )<
Blockit'ta o'd Set-uP
Pltmbittg connectione -- aa)tet otd uatet
Eleetrical Cc,nnection' Bloeking' set-up
and. olwtbina conneeti-one trust be approted
befone reqiating eleclrtcal inspeetion
Aeceesory tuildittg
SI?E INSPECTION: TO bE rrude after
ercaoatlo",5nt prtor tc set uP of
forne.
INSULATION/VAPOR BARRIER ITISPICTION.:Io be maCe after aLL insulati-on a:1d
required oqor barriera ate in p1fce
bti beflore ory Lath" gypeurn bootC or
unLL cottering is applied' and befone
ary insulation is concealed.
DRYWALL INSPECII1N: Tc be nade
afret, dtrAaualfia in place'
but pnior to anY taPing.
UNDERSLAB PLI.]MBTNG, ELECTRICAL &
uECHLatCAr,: To be made befot'e anY
Gfr1i-iooered.
FOOTING & EOUNDATION: To be rmCe
;F;;Z;enctes a"e &cattated and
forns are erected' but Prior to
pouting ccncrete.
UND\RGROUN D PLUMD r NGt SEW,ER, -W.AT-E4'
DRAIIIAGE: To be nade PrLor to ILL-
Il$-tiinches.
UIIDERYLOOR PLUMBING & MECHA'NICAI,:of
floor insulation or decking.
POST AND BEAM: Io be made Prion to
ffiiiffilon of floor insulation or
deckittg.
R)UGH PLUMBIITC. ELEURTCAL & MECH:
ANICAL: No uork ie to be coDered
ffiiTthese ircpections hatte been
made and approtted.
MAS)NRI: Steel Locati,on, bond'
Gdijgrouting ot' Derticals in
accordance Dith U.B.c. Section
24L5,
WOODSTOVE: After irwtallat'ion is
anrpleted,
CURB & MPRCACH \P'W; After forns
@.e ere;teAffi@o" to Pourittg
conc"ete.
SIDWALN & DRIWWAY: For aLL con-;ter;naofrAffi etreet right-
of-r"vy-, to be nade after aLL exca-
oating eattplete & forn wt'k & sttb'
base nnterLal in Place.
YENCE: Vhen conPlete -- Prouide
@G or mooable sections through
pcrchee, ekirting, decks,
Leted.
Pinal - Afte"
etc. are eotnp
tion.
F84H!-!G: l,tust be requested after
@proo"t of rough plunbing' .electri-cal & meclunical, ALL roofittg
btacing & chinmeya, etc. nillt be
. eompleted. No uork is to be con-
' aealed until thiB inepeotton lwe
'been made anC approued.
EIPEPLACE:nat;;m;
FIIIAL PLUMBING
FINAL MECHANICAL
FINAL ELECTRTCAL
Pz,ior to plccirg facing
and before froning inepec-
U,E
3sru,Q
ALL project conditions, such as the installation of stteet t19e_1.,- conPletion-of the'nnq"7"Lb-u"a".ipr:rg,'Lti., *r"t be satisfied before the BUTLDTNI F1NAL can be requested'
prNAL BUTLDTN7: The Final Building rnapection mtst be requeated after the Fi'nal Ph'unbing
\J Eleetrical, otd Mechanical rnspections laua been nade atd approved'
*AT,L MANITCLES AND CLEANOUTS TIUST BE ACCESSIBLE, ADJUSTIIENI TO BE MADE AT NO COST TO CIIY Pege 1 of 2
Ias lot I
^5
tr
tr
Pcge 2
SOLAR ACCESS REQ.-d
Zone
JOB NO.L-CO
Bedroons:
Build ing Vo lue & Perm it
This permit is granted on the erpresa condition tlnt the said constxuction
"t*tt', 'i.n all rZspecti,- ;";i;;'to the ot'dirnnce adop.ted g;v the gitv 2fip"libflrti, tilllaL"g- the 2oning Cydtnanc-e, negulatiyg the ccnstmtcticn
ir.d u"o'" of Luildings,'and may be suspended ot' reuokeC at cny time upon oic-
tation of any pz'cttisions of said lrdinances.
TOTAL VALUE
Building PenrrLt
State
?otal Clanges
th
t
TlU Y VaI?EM
*
Fee
*
S.D.C. 1.5 x
Lot Sq. Ftg Lot Faces -
Itouse
LOr rwE
Date Paid:
Signed:
Receipt #:
% of Lot Ccue?age_
I of Stortes
Total Eeight
Tooooraahu
fntepiot,
Co?nef
Panhandle
CUL-de-aac
Plumbing Permit
No person elnll constrntet, instalL', altet- or clun4e,any neu-cr existing
i1*rtlrrg ot, drainage systa"n in uhole o, in patt' unlea.s s.uch pe*son is the
i"got ;o""n""oo o1-a rllid pl*,trt"s Lic-ensb, escept that a pe"son ^ay 40
ptiit.tig uork to p,opetty ihi.t i" or,med, Leased o, oper:ated by the appli-
cant.
CHARCEN0.ITEM
Ei.shttes
Residential (1 bath)
Seuer
Plunbing Penrit
State
Electricol Permit
Wet,e State Las requires that the electri.cal uork be done by an Electrical
Contractor, the eliettical pot,tion of this permit slwll not be ualtC until
the Label has been signed by the Electrical contractor'
*?otal
Nzu/Ectend Circuits
Seruice
CIUNGENCFEEITgM Mechqnicol Permit
Erhant llood
,s
Vent Fat
Ilcodstore
PermLt rssudrce
Mechanical Permit
-- ENCROA
See,Eitq Dewsit
Storhe
Maintenance
Perwit !
C'utbcut
Sida,talk
!ence
Electrical Iabel
Mobtle Hone
PLan Eoantnex'uave
f HAW CAREEULLy EXAIIINED the conpleted application for pennit' and do
i"'i"ty iertify that aLL info*mation heteoi^is aae ard. correct, cnd r
iioti"n" certiiy that any ard aLL uoyk perfor'ned slall be done in aceor'-
'iince dth the- Oydinanc"es of the City of 'Springfield,
'nd
th-e Lae of the
state of 0r,egon pertaining to the wtk ceabribed henein, end tlnt N0 )ccu--piicy ,itt b"e r,aCe of anry" stt'uetu,e uithout pennissi-on of the Building N-
uision. I further' .""i;iy that otly con-traitot's and enplcyees uho are in
oirplionin L't.tt, ons ?01.b55 uiLL be- used on thie pnoiect
?otaL
,IOTAL AI"IOUTIT DUE: *5 S Signed Date
Lt ;.n
fi?dda
Ao?na?f
Acce-ssot u
( DcLue)
FEE
Watp-v
?otal Ctran qes