Loading...
HomeMy WebLinkAboutPermit Building 1995-09-27COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fitlh Street, Spri ngf ield, Oregon 97477 LOCATION OF PROPOSED WORK SESSORS MAP: JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759,./ \L/ z 9o,IT SP'IINGFIELO a-5-/-S'ZG ^ 5f qph /'ls tr*// TAX LOT: t /r^',t \PHONE: STATE kl 7{7.-e/ 7 g CITY: ADDRESS: OWNER NEW - REMODEL ADDITION DEMOLISH OTHEB VALUE: DESCRIPTION OF WORK: NAME ADDRESS PHONE ADO RESS EXPI RES PHON EDt^u ,le rCONTRACTOR'S NAME ARCHITECT: MECHANICAL: ELECTRICAL: CONST, CONTRACTOR # G EN ERA L: PLUM BI N G plU MEING NO.FEE CHARGE Single Fixture Relocated Bldg. (new tix. addtl) Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT NO FtrF CHA RGFFurnace/burner & vent < 100,000 BTUs Furnacelburner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or Tlrcor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Srngile duct f rom Vent System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE _ ZONING LAND USE HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER EUDGET, WATER HEATER * OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: I OF BLDGS: CONSTR. TYPE: HEAT SOURCE: SQ. FT.$/SQ. FT.VALUE &)TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ, FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE DATE-+-.BCPT#BY 24Ao/-/r BUILDING PERMIT 2-53e PLU M BI NG DEMOLITION 5% State Surcharoe )*,ri 2tu) z--,5% State Su rc harge MECHANICAL FENCE VALUE $ 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERM ITSPAVINGCURBCUT FT. SYSTEMS DEVELOPM ENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ZIP: c))qa 5- REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspectlons are made at the proper time. To request an inspection, call Z26.9T69 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work daY. S|TE |NSPECT|ON: To be ROUQH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB PLUMBING, inspections have been made SPECIAL INSPECTIONS: In accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor during CURTAIN WALLS construction of the following work. A F6qTINGS & FoUNDATI9NS: trraEDr a.^tr. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are faclng materials and before erected, all steel in ptace, but - l.-framing inspection' STRUCTURAL CONCRETE: ln coNcRErE sLAB: ro be '/ tl:J;:l;i[J'i['Jlfli,t][ ," srRUcruRAL wELDS: made after all inslab building ptace and all pi pes, chimneys Performed on the iob' (2722 t) service equipment, conduit, and vents are complete and pipi ng, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING: ancillary equipment items are and melhanical are approved. During all bolt installation and in place but before any . ,. tightening operations. (306 concrete is placed. Y tNSULATtoN & vApoR a.6) -'/ -'\- BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.B.C. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or f illing applied. SpEC;AL GRAD;NG,trenches. EXCAVATTON AND FILLING: ,NDERFL..R: prumbins [|f;:,S".1Pf;:*'J3]"Hltt' Durins earthwork' (so6 all & electrical, mechanical. To be according to plans. chapter 29) X. LATH AND/OR GYPSUM ,.' ' BOARD: To be made after all lathing and gYPsum board, interior and exterior, is ln place but before anY plastering is aPPlied or before gypsum board joints and fasteners are taPed and f inished. made Prior to installation of f loor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or f loor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decklng or f loor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to Placing concrete. GLU-LAM BEAMS: lnspection Certificate by an aPProved agency, furnished to the CitY's Building Division before beams are placed. (2501 U.B.C. sTDS. 25-1011). STRUCTURAL MASONRY: (s06 a.7) *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th3t all information herein is true and correct,-and I further certify that any and all work performed shall be done in accordance with the Ordinances of the city of Springf ield, and the Laws of the State of Oregon pertaining to the work described herein, and that No occuPANCY will be made of any structure without permission of the Building Safety Divislon. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable f rom the street, tnat the permit card is located at the front of the property, and the approved set of plans will remain on the site at all stru ct iontimes durin Signatu re Date VALIDATION aoZAMOUNT RECEIVED: BECEIPT +:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot strlping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested af ter the final ptumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the Premises. ADDITIONAL COMMENTS ') PLANS REVIEWED BY DATE