Loading...
HomeMy WebLinkAboutPermit Building 1995-09-19COM M ERCIAL/IN DUSTRIAL PERMIT APPLICATION 225 Fillh Street, Springfield, Oregon 97477 SPRINGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:d1 7 5""/i a,"l s/,rr=-f ASSESSORS MAP:TAX LOT: {Ct1 (e o OWNER ADDRESS: CITY:STATE PHON E: ZIP:{ LODESCRIPTIO NEW - VALUEADDITION DEMOLISH OTHERREMODEL OF WO {o ADDRESS PHONE RESS PHONE N E LYlA-t 6 ELECTRICAL: ARCHITECT CONTRACTOR'S NAME MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUMBING PLUMBING NO.FEE CHARG E Single Fixture Helocated Bldg (new f ix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT NO i rrp CHA FIGtr Furnace/burner & vent < 1QQ,000 BTUs Furnace/burner & vent >100,0Q0 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct f rom sysVent tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT OCCY GROUP: * OF STORIES: OUAD AREA: # OF BLDGS SQ. FT.$/SQ. FT.VALUE TOTAL VALUE OF PROJ X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER "€-?= ssplr /?2?3 o^rE fu3-e:> ByPLAN CHECK FE^E BUILDING PERMIT PLU M BI NG DEMO LITION e 5% State Surcha tate Surch 5% MECHANICAL o FENCE 5% State Su e SIDEWALK FT. SU ETOTAL PERM ITSPAVINGCURBCUT FT. SYSTEMS DEVELOPM ENT 77 eoTOTAL PERMIT FEES EXCLUDING ELECTRICAL Cgrzoo f 7/-: - OFFICE USE - LAND USE: * OF UNITS: CONSTH. TYPE: ---HEAT SOURCE: -.-=-- HANDICAP ACCESS: - FLOOD PLAIN: ZONING: LIGHTING POWER BUDGET: WATER HEATER: V REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, Job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. S|TE INSPECTION: To be ROUQH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMB1NG, inspections have been made SPECIAL INSPECTIONS: ln accordance ELECTRICAL & and approved. section 306 0f the state Specialty code MECHANICAL: To be made _ a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & by the Ownei/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: E'6ED' ^E. r copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before erected, ail steel in ptace, but framlng inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 P.S.l. (306 a.1) coNcRErE SLAB: ro be |T:J,::L i[J'i['Jlfl;'X,? ," srRUcruRAL wELDS: made after all inslab building place aid all pipes, chimneys Performed on the iob. (2722t) service equipment, conduit, and vents are complete andpiping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING: ancillary equipment items are and mechanical are approved. During all bolt installation and in place but before any tightening operations. (306 concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON electrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or filling applied. SpECIAL GRAD;NG,trenches, EXCAVATTON AND FILL|NG: ,NDERFL..R: prumbins [|f;5,]"fJf|Atlfl]"gitt' Durins earthwork (306 all & electrical, mechanical. To be according to plans. chapter 29) made prior to installation of , A?u ArrhrAD ^voerri, GLU.LAM BEAMS: rnspectionfloor insulation, decking or LATH AND/OR GYPSUM f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency' furnished to the City's posr & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 u'BC' insutation, decking or f loor plastering is applied or before STDS' 25'10'11)' Sheathlng.gypsumboardJointsand ijsteners are taped and STRUCTURAL MASONRY: (306 FLooR INSULATToN & finished' a'7) VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with u3c 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to Placing concrete. 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have carefuily examined the completed application and do hereby certify thSt all information herein is true and correct,-and I further certify that any and all work performed shall be done in accordance with the ordinances of the City of Springf ield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Divlsion. I further certify that only contractors and employees who are in compliance with ORS 701'055 will be used on this proiect' ions are requested at the proper time, that project address is readable f rom the nt of the property, and the approved set of plans will remain on the site at all DateSi gna c 7{ req u i red tns ct ate I f urther agree to ens street, that the s trutimes durin VALI DATION AMOUNT RECEIVED: RECEIPT *: DATE PAID RECEIVED FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE OEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stpl ping, etc. must be completed before requesting thls insPection. ,n FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the Premises. PLANS REVIEWED BY o^rEa*ez-