Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-09-14COM M ERCIAL/ I N DUSTRIAL PERMIT APPLICATION 225 Fitth Street, Springfield, Oregon 97477 SPRINGFIELE'a<JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK: h, bto -t, arrd St<er ASSESSORS MAP:TAX LOT:OA PHONE: O<ea"lSTATE:ZIP: \4d 7Vl-6650 ?7 v77 o .TCITY;Q,opPN6 Fr'et ADDRESS OWNER NEW - REMODEL ADDITION DEMOLISH OTHER VALUE: FDESCRIPTION OF WORK ELECTFIICAL: NAME ADDRESS PHONE ADDRESS EXPI RES PHONE I+a I CONTRACTOR'S NAME ARCHITECT: MECHANICAL: CONST. CONTRACTOR # GENERAL: PLUM BI NG PLUMBING NO.FEE CHARG E Single Fixture Relocated Bldg. (new f ix. addtl) Water Service ft Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO trFF CI{A FIGtr /Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan /Single duct Vent Sys from AC tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT ,.Ara /^n - OFFICE USE _ ZONING HANDICAP ACCESS: FLOOD PLAIN: LIGHTING POWER BUDGET: WATER HEATER CONSTR. TYPE HEAT SOURCE: LAND USE: # OF UNITS OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: SQ. FT.$/sQ. FT.VALUE Ja Zra TOTAL VALUE OF PROJ X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY %,?o BUILDING PERMIT PLUMBI NG DEMOLITION 5% State Su rch arq e aD 5% State Surcharqe MECHANICAL (? 7 &/7 FENCE VALUE $ 5% State Surcharqe fi 7/r SIDEWALK FT, SUBTOTAL PERMITS PAVING CURBCUT FT, SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL \7- REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. wilt be made the same working day, requests made after 7:00 a.m. will be made the following work daY. stTE |NSPECT|ON: To be / ROUGH PLUMBING, PAVING: After gravel is in made after excavation, but ELECTRICAL & place but prior to placing prior to setup of forms. 67l6XaN1EA5ruo work is to asphalt or concrete. B6Blerr:u*fii-rr rnese UNDERSLAB pLUMBING, inspections have been made SPECIAL INSPECTIONS: In accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shall be employed before any work is covered. ATTIC DRAFT STOPS & Oy ine Owner/ Contractor during CURTAIN WALLS construction of the following work. A FOOTINGS & FOUNDATIONS: F'hE6r A E. I copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished to the Building Division. excavated and forms are facing materials and before 6rected, all steel in place, but framing inspection' srRUcruRAL CoNCRETE: ln prior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) coNcRETE SLAB: To be the roof' all framing' fire made arter a, insrab buirdins El::5::.':l 316:It"f,n;:r" ;llN'"J"'X3,t,Y5tT',rrr, , service equipment, conduit, and vents are complete and :i?,l,?,i:".',:;?{:? ?$:'}:J :H'fl::Hlt"il:,1'JJ;[3:?: Bl?,Xf],ffi]noll",?,o,.'IHt,oin place but before any tightening operations. (306 concrete is placed. INSULATTON & VApOR a.6) BARRIER: To be made after all UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ONelectrical, gas, sanitary sewer, barriers are in place but FIREPROOFING: U.BC. storm sewer, water and before any lath or gypsum Standards 43-8. drainage lines. To be made board interior wall covering is prior to covering or filling applied. S'EC'AL GRAD'NG,trenches. ,NDERFL..R: p,umbins IlT:,$'"="fHJ3[ffi"' El;iJ!'iiil-tli:'[Jb:]'"t electrical, mechanical. To be according to plans. chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection f loor sheathing. BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the city's poST & BEAM: To be made interior and exterior, is in Building Division before prior to installation of floor place but before any beams are placed' (2501 u'Bc' insulation, decking or f loor plastering is applied or before STDS' 25-10J1)' sheathing. gypsum board joints and fasteners are taped and STRUCTURAL MASONRY: (306 FLooR TNSULATToN & finished' a'7\ VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested ?- / v-?,Signatu re r \) Date times during c struction. street, that the at the proper time, that project address is readable f rom the and the approved set of plans will remain on the site at allrmit card is located at the front of the 26.?oVALIDATIONAMOUNT RECEIVED: RECEIPT g:RECEIVED BY: DATE PAID: FINAL PLUMBING FINAL ELECTRICAL x FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE