Loading...
HomeMy WebLinkAboutPermit Building 1993-03-03COM M ERCIAL/lN DUSTRiHL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WO K: ASSESSORS MAP: 40s JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX SPEINGFIELO 7r'6-vRs/ONE: J STATE: c, Qzlz-CITY: ADDRESS: OWNER NEW - REMODEL ADDITION DEMOLISH OTHER 50pVALU DESCRIPTION OF WORK: rrEnuAitlnAl. ELECTRICAL: NAME ADDRESS PHONE ADDRESS XPIRES PHONE ARCHITECT: CONTRACTOR'S NAME +tt lvtBfliG GENERA CONST. CONTRACTOR # PLUMBING NO.FEE CHARGE Single Fixture Relocated Bld (new fix. addtl s ) Water Service (t Sanitary Sewer tt. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL NO FFF aHA An tr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent se parate Stationary evap. cooler Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - -o]OSIJ LAND USE: WATER HEATER r OF UNITS: HANDICAP ACCESS FLOOD PLAIN ZONING OCCY GROUP: * OF STORIES: QUAD AREA: r OF BLDGS: CONSTR. TYPE HEAT SOURCE: VALUE$/SQ. FT,SQ. FT. TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER RCPT#PLAN CHECK FEE DATE BY ts?5 BUILDING PERMIT V-\q)PLUMBING DEMOLITION 5% State Su rcharq e "< 5% State Surcharge MECHANICAL FENCE VALUE $ 5% State Surcharqe SIDEWALK FT. SUBTOTAL PE RM ITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL ild ZIP: LIGHTING POWER BUDGET: *{IEQUIRED INSPECTIONS It is the responsibility of the permit holderto see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job numbel job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:OO a.m. will be made the following work day. SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravet is in made after excavation, but ELECTRICAL & place but prior to placingprior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpECIAL INSpECTIONS: tn accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code MECHANICAL: To be made a special inspector shatt be employed before any work is covered. ATTIC DRAFT STOPS & by the Owner/ Contractor duringCURTAIN WALLS construction of the following w6rk. A FOOTINGS & FOUNDATIONS: copy of the special testing reports shall To be made after trenches are FIREPLACE: Prior to placing be furnished io the Building Division. excavated and forms are facing materials and before erected, all steel in place, but framing inspection' STRUCTURAL CoNCRETE: lnprior to placing concrete. FRAMING: To be made after excess of 2500 PS.l. (306 a.1) coNcRETE SLAB: To be the roof, all framing, fire made after ail insrab buirdins 3l::5:N.':fi 3,'3!Ir"r.,?i;:r. ;1x3,."J"'J3"t,Y5tT',rrr, ,,service equipment, conduit, and vents are complete and-piping, accessories and other anciriry equipment items are :H H::l.",li""ji:,X'JJ;[}::: 3lf,Xf],ffi],?1,1",?,o"tI]X"oin place but before any tightei-ring operations. (306concrete is placed' lNsuLATtoN & vApoR a.6) BARRIER: To be made after allUNDERGROUND: Plumbing, insulation and required vapor SpRAyED ONelectrical, gas, sanitary sewer, barriers are in place but FIREpROOFING: U.BC.storm sewer, water and before any lath or gypsum standards 43-g.drainage lines. To be made board interior wall covering isprior to covering or f illing applied.trenches. SPEC|AL GRAD|NG, ,NDERFL..R: p,umbing I:::,i""'"'f;m'J3[H]"' iliflfiiil#ii',5Jb'i]',"i. electrical, mechanical. To be according to plans. Chapter 29) made prior to installation of floor insulation, decking or LATH AND/OR GYPSUM GLU'LAM BEAMS: lnspection floor sheathing. - BOARD: To be made after all Certificate by an approved lathing and gypsum board, agency, furnished to the City's pOST & BEAM: To be made interior and exierior, is in Building Division before prior to installation of floor place but before any beams are placed. (2501 U.BC' insulation, dect(ing or floor plastering is applied or before STDS' 25'10,11)' sheathing. - Sypsum board joints and fasteners are taped and STRUCTURAL MASONRy: (306 FLooR TNSULATIoN & finished. a.7, VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. -ln addition to the inspec- tions specified, the Building Off icial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditioni such aslandscaping, parking lot striping, etc. must be completed beforerequesti ng this i nspection. FINAL BUILDING: Requested after the final plumbing, etectrical,mechanical and Fire Department inspections are made andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises. ADDITIONAL COMMENTS: 7-V4>PLANS REVIEWED BY DATE z- By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all informationherein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that No OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with OFIS 701.055 will be used on this project. Signature Date /-.q l- /-s roject address is readable from the plans will remain on the site at all fu hert ree eo reNSU althat re u re d ns tiagq ons are atuestedpec he ti hatreqpeprome,p th at he card S ocreetStperm atated th f ron thof e ro an d ahepperlY,roved ofsetpp Sme Ud nn con ru ct ons VALIDATION AMOUNT RECEIVED: RECEIPT *: DATE PAID: RECEIVED