Loading...
HomeMy WebLinkAboutPermit Plumbing 1995-04-25I 9g!4 !4! Rc rA L / I N D usrR tA LPERIIIIT APPLICAI'ON 225 Fitth Street, Springfietd, Oregon g74t7 SPF!^rGFtELc, LOCATION OF PROPOSED WO ASSESSORS MA -;.JB NUMBER INSPECION L|NE: 7 26-3769 OFFICE: 726-3759 TAX LOT: OWNER: ADDRESS: CITY: PHON ztPSTATE: DESCRIPTION OF WORK: NEW- REMODEL DDITION DEMOLISH OTHER VALUE NAME ADDRESS PHONE ARCHITECT: CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE G EN ERAL: PLUM BING:d MECHANICAL: ELECTRICAL: NO.FEE CHARG F Single Fixture Relocated Bldg. (new fix. addtl) Water Service /eD ft 40?o Sanitary Sewer ft Storm Sewer ft Backflow Device TOTAL PERMIT 4o a^ M EC HAN ICAL NO FFF EHA FIG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f Ioor mounted unit heater Appliance Vent se parate Stationary evap. cooler Vent Fan/Single d uct Vent Sys from AC tem apart or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - oFFrcE usE - ZO NI NG LAND USE HANDICAP ACCESS FLOOD PLAIN OCCY GROUPT # OF STORIES OUAD AREA: * OF BLDGS: LIGHTING POWER BUDGET: WATER HEATER: CONSTR. TYPE: HEAT SOURCE: * OF UNITS: SQ. FT.$/sQ. FT.VALUE TOTAL VALUE OF PROJE X X SQ. FTG MAIN SQ, FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY fi,tu BUILDING PERMIT PLU M BI NG _4:OD DEMOLITION 5% State o 5% State Su rcharge 2@*/,Lu 3,L' I FENCE VALUE $ 5% State Su rcharqe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ETECTRICAL It is the resPonsibilitY of the Permit hold er to see that REO UIRED INSPECTIONS all insPections are made at the ProPer time. To request a.m. will be made 726-3769 (record er), state your CitY desigt received before nated i 7:OO a.m ob number' will be mad iob address, e the same type of ins working daY, pection re requests quested made and when after 7:00 you will be ready for insPe ction. Re quests PAVTN G: After gravel is inthe follow ing work day ROUGH PLUMBING,place but Prior to PlacingSITE IN SPECTION: To be ELECTRICAL &asphal t or concrete.made afte r excavation, but MECHANICAL:No work is to prior to set up of forms.be covered unti I these UNDERSLAB PLUMBING'inspections have and aPProved. been made SPECIA L INSPECTIO NS: ln accordance Section 306 of the State SpecialtY Code ELECTRICAL &a speci al insPector shall be em ployed MECHANICAL:To be made by the Owner ractor during an insPect.ion, call before anY work is .covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equ ipment, cond uit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas;s.qi tary sewer, storm sewel @9! and drainage lineslTo be made prior to covering or f illing t re nc hes. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterlor, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. construction following work, A copy of the special testing reports shall be f urnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S,l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 t) During all bolr installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.1'l & Chapter 29) GLU.LAM BEAMS: lnspection Certif icate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.BC. STDS. 25-1011). STRUCTURAL MASON RY: (s06 a.7') *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. / Cont ot frre V the rough electrical, plumbing HIGH STRENGTH BOLTING: UN DERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of f loor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with u3c 2415. RooF sHEATHTNG AND iHffi^ilifi'T'oi""l'" NAILING: Prior to installing erected but prior to placing any roof covering. concrete. re By signature, I state and agree, that I have carefully examined the completed application and do hereby certify tl'rat all lnformation herein is true and correct, and I further certify that any and allwork performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. DateSi gn hat ro dad rCSS 'eadab e ro m heestedUthatetironectSonqppeptoreeNSreuhatalUredSfuhertreqpag thn 5 it alanherovedofanSremnatoatdplathentroofev,papoedhathepermt, tim d g const FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Dlvision and posted on the premises. PLANS REVIEWED BY DATE AMO DATE PAIDloN RECEIPT I: EIVED: RECEIVED BY: ADDITIONAL COMMENTS: