HomeMy WebLinkAboutApplication APPLICANT 12/22/2020City of Springfield
Development & Public Works
225 Fifth Street
Springfield, OR 97477 CC Q st 233 0-101
Accessory Dwelling Unit (ADU) - Type I
SPRINGFIELD
OREGON
Project Information (Applicant., complete this section)
A IicantName• AnN401 Phone: 45'5— Zo5-`L4%2.
Company (if applicable): ZeA;.&
?JWLQ/-sUr— Email: MGrIq( g„{$r StS
Mailing Address: 5464 ALAef` Qu Gr-^k G/1S- 914 5 ice"
Applicant's Rep.:
Phone: "
Company:
Email:
Mailing Address:
Pro er Owner:-�eSSe. ,c,rh24
Phone:
Company:
Email: 504
0 dos tstgi
Address: 7r30 27w -e2+
fi
qi4 i
ASSESSOR'S MAP NO: t -7-0-M4
TAX LOT NOS : 17 013( (ou 10-700
Property Address:-leo�Sp-lk 7 1
p
Size of Property: . %,3 1 Acres 1i Square Feet ❑
Type of ADU: `_CConversion of part of house (describe existing use)
(check one) oConversion of accessory structure (describe existing use) Qaf`C.q p_
_Addition to house _New detached dwelling
Zoning of Property: -eLow Density Medium Density _High Density Residential
Signatures: Please si nand riot our name and date in thea ro date box on the next page.
Associated Cases:
Case No.:
l - Ob L'IP" I Y I
Date: %- eviewed b :
Application Fee: �0 1Q'��
G/r,
Technical `7" osta a Fee: 0
TOTAL FEES:
'Jv PROJECT NUMBER:
Revised April 3, 2018 Sandy Belson page 1 of
e,
Signatures
The undersigned acknowledges that the InPonnation in this application Is correct and accurate.
Date:
Signature
Print
owner
SesEZ W TV-P4Q"S
Print
Revised April 3, 2018 Sandy Belson page 2 oN
Accessory Dwelling Unit Application Process
1. Applicant Submits an Accessory Dwelling Unit Application to the Development
Services Department
The application must conform to the Accessory Dwelling Unit Submittal
Requirements Checklist on page 4 of this application packet.
Planning Division staff screen the submittal at the front counter to determine
whether all required items listed in the Accessory Dwelling Unit Submittal
Requirements Checklist have been submitted.
Applications missing required items will not be accepted for submittal
2. City Staff Conduct Detailed Completeness Check
Planning Division staff conducts a detailed completeness check within 30 days of
submittal.
The assigned Planner notifies the applicant in writing regarding the completeness of
the application.
An application is not be deemed technically complete until all information necessary
to evaluate the proposed development, its impacts, and its compliance with the
provisions of the Springfield Development Code and other applicable codes and
statutes have been provided.
Incomplete applications, as well as insufficient or unclear data, will delay the
application review process and may result in denial.
3. City Staff Review the Application and Issue a Decision
• This is a Type I decision and thus is made without public notice and without a public
hearing since there are clear and objective approval criteria and/or development
standards that do not require the use of discretion.
• Decisions address all the applicable approval criteria and/or development standards.
- Applications may be approved, approved with conditions, or denied.
The City mails the applicant and property owner the decision, which is effective on
the day it is mailed.
The decision issued is the final decision of the City and may not be appealed.
Revised April 3, 2018 Sandy Belson page 3 of
Accessory Dwelling Unit Submittal Requirements Checklist
NOTE: If you feel an item does not apply, please state the reason why and attach the
explanation to this form.
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate
fee calculation formula. A copy of the fee schedule is available at the Development
& Public Works Department. The applicable application, technology, and postage
fees are collected at the time of complete application submittal.
u Accessory Dwelling Unit Application Form
Narrative explaining the proposal and any additional information that may have a bearing
in determining the action to be taken, including findings demonstrating compliance with
the Accessory Dwelling Unit Development and Design Standards described in SDC 5.5-125
and 5.5-130.
❑ Three (3) Copies of a Plot Plan Including the Following:
The scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30', 1" = 50' or 1" = 100', north arrow, and date of
preparation
u Property lines including dimensions and size of the property
[ Name and location of abutting street(s) and alley(s)
Proposed accessory dwelliR9 unit and its relation to the primary dwelling, showing
location, dimensions,: height, setbacks from property lines, and entrance locations
Existing and proposed structures, fences, walls, including required outdoor storage and
garbage areas; showing location, dimensions, and setbacks from property lines
Percentage of the lot covered by existing and proposed structures
tQ'Location of utilities and meters
LVLocation of existing driveways, curb -cuts and required off-street parking areas
Qt Location of existing sidewalks and walkways and required pedestrian walkway
Ei(Existing and proposed trees and landscaping
❑ Three (3) Copies of a Detailed Floor Plan of the ADU, drawn to scale with labels on
rooms indicating proposed uses
❑ Three (3) Copies of an Elevation Drawing of the ADU Including the Following:
[j'Exterior finish materials
[kRoof pitch
Zwindow placement and sizes
9 window and door trim
0 Dimensions of eaves
[-1 Height of accessory dwelling
Revised April 3, 2018 Sandy Belson page 4 of4
Narrative for Proposed ADU at
780 28th Street, Springfield, Oregon
This is a proposal to convert an existing garage at 780 281h Street into a 1 Bedroom
ADU. The existing garage meets all the design standards listed in SDC 5.5-130. The only
changes that need to be made to comply with SDC 5.5-125 are the addition of a kitchen,
bathroom, living area and sleeping area. Additionally, a hard walkway to the parking
area and a garbage storage area need to be added.
4-
)«
I
Imo§
!
\|
XT
M0
ym
im
I m
rD
O
z