Loading...
HomeMy WebLinkAboutPlan, Final APPLICANT 12/22/2020Revision Notes on Summary SPRINGFIELD TYPE I MINIMUM DEVELOPMENT STANDARDS - MAJOR STAFF REPORT & DECISION 6k OREGON Project Name: Part Lumber Storage Buildings and Warehouse Nature of Application: Type I Minimum Development Standards —Major (MDS) Review Case Number: 811-20-000172-TYPI f Project Locution: 1291 South A Street aa>• (Map 17-03-35-01 TL 8900 & 9200) mitt,+irl - N „ ! 1! IA Current Site Conditions: Site is developed s with an existing warehouse commercial —_ building, driveway, parking lot and driving aisles, lumber storage yard, and paved track maneuvering areas. Zoning: Heavy Industrial (HI) Comprehensive Plan Designation: HI (Metra Plan) Zoning of Surrounding Properties: Low Density Residential (LDR), Community Commercial (CC) and HI Application Submitted Date: September 22, 2020 Decision Issued Date: October 23, 2020 Recommendation: Approval with Conditions Associated Applications: 811-17-000133-TYP I (Minimum Development Standards —Major) CITY OF SPRINGFIELD DEVELOPMENT REVIEW TEAM POSITION REVIEW OF NAME PHONE Project Manager Planning Andy Limbird 541-726-3784 Transportation Planning Engineer Transportation Michael Liebler 541-736-1034 Public Works Civil Engineer Utilities Clayton McEachem 541-736-1036 Public Works Civil Engineer Sanitary & Storm Sewer Clayton McEachem 541-736-1036 Deputy Fire Marshal Fire and Life Safety Eric Phillips -Meadow 541-726-2293 Building Official Building Chris Carpenter 541-736-1029 Applicenr. Melinda McMillan Ankrom Moisan Architects Inc. 38 NW Davis, Suite 300 Portland OR 97209 Property Owner. Dave Frank Parr Lumber Co. Springfield LLC 5360 NW Century Blvd Hillsboro OR 97124 Applicant's Representative: Brad Kilby Harper Hoof Peterson Righellis Inc. 205 SE Spokane St, Suite 200 Portland OR 97202 Purpose: Minimum Development Standards (MDS) are intended to support economic development by minimizing City review for minor additions, expansions or changes in use. MDS shall ensure compliance with specific appearance; transportation safety and efficiency; and stormwater management standards specified in the Springfield Development Code (SDC) and otherwise protect public health, safety and welfare. Proposal: The applicant is seeking approval for construction of two covered sheds for lumber storage and a new —5,168 fta warehouse building with truck loading dock in the southeast comer of the site. Concurrent with construction of the new buildings, the applicant is proposing to repave a portion of the lumber storage yard and vehicle circulation area and to install two vegetated stonnwater management facilities — all within the southern half of the site. The site was previously approved for a change of use to a retail lumber yard and warehouse commercial building through Minimum Development Standards Case 811-17-000133-TYPI. The applicant requested and was granted deferral of the requirement to install a sanitary drain to serve the trash enclosure so this remains an outstanding item. The remainder of the required improvements conditioned by the land use decision were completed and the site has been in operation since 2018. The proposed covering and enclosing of the lumber storage racks along with construction of a new warehouse building and truck loading dock triggers the requirement for a Minimum Development Standards approval, and the overall area of affected impervious surfaces and new building rooftops elevates the review to an MDS Major. Criteria of Approval: In order to grant MDS Major approval, the Director shall determine compliance with Criteria A -H of SDC 5.15-120 as specified below: A. A five-foot wide landscaped planter strip, including street trees, with approved irrigation or approved drought resistant plants as specified in SDC Sections 4.4-100 and 4.2-140 shall be installed between the sidewalk and parking areas or buildings. Finding: In accordance with SDC 4.2-140 and SDC 4.4-105, street trees are required within the public right-of- way or can be planted on private property where there is insufficient room in the curbside planter strip. Street trees are to be minimum 2 -inch caliper at the time of planting and taken from the City's Approved Street Tree list found in Appendix 6A of the City's Engineering Design Standards and Procedures Manual (EDSPM). The applicant is proposing to retain the existing landscaping installed along the property frontage on South A Street. No other street frontage landscaping is proposed with the subject development application. Finding: Maintenance of street trees in the public right-of-way is the responsibility of the City. However, maintenance of the streetside planter strip and any street trees located on private property is the responsibility of the adjacent landowner in accordance with SDC 4.2-135. Conclusion: As proposed, this requirement has been met. ® Complies as Shown on Plot Plan 0 Proposal Complies when the following revision is made: N/A B. Trash receptacles shall be screened, covered and connected to the sanitary system in accordance with the Engineering Design Standards and Procedures Manual as applicable. All outdoor storage areas shall be screened by a structure or enclosure permanently affixed to the ground as specified in Section 4.4-110. Finding: In accordance with SDC 4.4-110.A.4, all trash and recycling enclosures shall be covered and screened from view. Outdoor storage and vehicle parking areas abutting residential properties also shall be screened. Finding: In accordance with Chapter 3.02.4.A of the City's EDSPM and Section 3.4 of the City of Eugene Stonnwater Management Manual, trash enclosure areas shall be covered and hydraulically isolated from potential stonnwater runoff, and directed to the sanitary system. Finding: The applicant installed a new trash and recycling enclosure on the site behind the warehouse commercial building in conjunction with the previous MDS Major approval issued in 2017 (Case 811-17-000133-TYPI). The existing trash enclosure is covered and screened, but is not equipped with a floor drain that is connected to the sanitary sewer system. Finding: The applicant requested deferral of the sanitary sewer connection requirement for the trash enclosure in 2018 to facilitate issuance of occupancy and commencement of operations on the site. Staff agreed to the deferral and advises that the floor drain and sanitary sewer connection now will need to be installed for the trash enclosure concurrent with this project. Conclusion: As conditioned herein, this requirement has been met 13 Complies as Shown on Plot Plan ® Proposal Complies when the following revision is made: 1. The Final Plot Plan shall provide far installation of a Boor drain that is plumbed to the sanitary sewer system for the existing trash and recycling enclosure on the site. C. Bicycle parking spaces shall be added to meet the numerical standards for the appropriate use or upgraded to meet the standards specified in SDC Sections 4.6-140, 4.6-145 and 4.6-155. Finding: The applicant previously installed a sufficient number of bicycle parking spaces on the site in conjunction with MDS approval 811-17-000133-TYPI. Because the subject application adds additional covering for the existing lumber storage racks, and unoccupied warehouse storage space in the new building, no additional bicycle parking is required for this application, Conclusion: As proposed, this requirement has been met. ® Complies as Shown on Plot Plan 13 Proposal Complies when the following revision is made: N/A D. Parking and circulation areas shall be provided. Paving, striping and wheel stops shall be installed as specified in SDC Sections 4.6-100 and 4.6-120. Required paving and other impervious surfaces on the site shall comply with on-site stormwater management standards as specified in SDC Section 4.3-110. Finding: In accordance with SDC 4.6-110.A.1 & 2, off-street parking is required for all industrial uses, including changes of use or intensification of use on an existing industrial site. Finding: In accordance with SDC 4.6-120.A & C, all parking areas shall have a durable, dust -free surface of asphalt, concrete or other acceptable materials. All parking stalls fronting onto walkways, structures or landscaped areas shall have a secured wheel stop or linear curb installed to prevent vehicle encroachment. Alternatively, the landscaping and walkway areas can be widened and designed to accommodate a minimum of two feet (24 inches) of bumper overhang. Finding: In accordance with SDC 4.6-120.C, all parking spaces shall be permanently and clearly marked with striping and (if necessary) symbols including standard, compact, and handicap accessible spaces. Any pedestrian crossing areas within the parking lot also need to be appropriately delineated. Finding: The applicant previously installed standard and handicap accessible parking spaces on the site in conjunction with MDS Major approval 811-17-000133-TYPl. Because the current proposal is to cover existing lumber storage racks and to construct a new, unoccupied warehouse building there is no additional vehicle parking requirement generated by this application. In the event that on-site parking demand exceeds available supply, vehicle parking would overflow to portions of the truck loading and vehicle maneuvering areas and into the lumber storage yard driving aisles, and would not impact public rights-of-way or adjacent sites. Therefore, the existing 33 parking spaces developed on the site are sufficient for this proposal. Finding: The applicant is proposing to heat runoff from the site using the existing network of catch basins prior to discharge to the public stormwater system in South A Street. Stormwater management facilities are addressed in more detail in Section H below. Conclusion: As proposed, this requirement has been met. ® Complies as Shown on Plot Plan ❑ Proposal Complies when the following revision is made: N/A E. Access from the proposed development area to the public right-of-way shall comply with SDC Section 4.2- 120. Finding: Section 4.2-105.6.2 of the SDC requires that whenever a proposed land division or development will increase traffic on the City street system and that development has any unimproved street frontage abutting a fully improved street, that street frontage shall be fully improved to City specifications. Along the property frontage, South A Street is fully developed to urban standards with paving, curb and gutter, lane striping, and striped bicycle lane. The sidewalk and other improvements along the subject property frontage are in good condition. Finding: The applicant is not proposing to modify the public street frontage of the site. Funding: In conjunction with MDS Major approval 811-17-000133-TYP I, the applicant previously obtained state and local permits and installed a new commercial driveway approach onto South A Street along the northern property frontage. The applicant is not proposing to adjust the existing driveway, and no modifications to the site access are required for this project. Conclusion: As proposed, this requirement has been met. 0 Complies as Shown on Plot Plan ❑ Proposal Complies when the following revisions are made: N/A F. Concrete sidewalks shall be installed where the proposed development area abuts a curb and gutter street as specified in SDC Section 4.2-135. Finding: In accordance with SDC 5.15-120.F, concrete sidewalks shall be installed where the site abuts a curb and gutter street as specified in Section 4.2-135. The subject site has frontage on South A Street along the north boundary, and there is an existing curbside sidewalk along the property frontage. The applicant is not proposing to change the existing sidewalk configuration along the South A Street frontage of the site. Finding: In accordance with Section 3.310 of the City's Municipal Code, the property owner is responsible for repair, replacement, or reconstruction of any damaged sidewalk along the street frontage of the property. Conclusion: As proposed, this requirement has been met. ® Complies as Shown on Plot Plan ❑ Proposal Complies when the following revision is made: N/A G. Streetfights required to serve the development area shall be installed as specified in SDC Section 4.2-145. Finding: The applicant previously improved the street lighting fixtures and positioning of the street light heads in conjunction with MDS Major approval 811-17-000133-TYP I. The street lights along the property frontage now meet current City standards and no additional modifications are required. Conclusion: As proposed, this requirement has been met. ® Complies as Shown on Plot Plan ❑ Proposal Complies when the following revisions are made: N/A H. The development area shall connect to public utilities as specified in SDC Sections 4.3-105, 4.3-110, 4.3-120, 4.3-125 and 4.3-130 and comply with the Springfield Building Safety Codes, where applicable. Easements may be required as specified in Section 4.3-140. Finding: A full suite of urban utilities already exist or are available to serve the site, including sanitary sewer, storm sewer, water, electricity and telecommunications. Water Service Finding: The applicant is proposing to retain the existing potable and fire water line connections to the public system in South A Street, and to install a new dedicated private fire line and private fire hydrant near the southwest comer of the existing warehouse commercial building. The existing and proposed connections should be sufficient for the proposed development. Electrical Service Finding: The applicant is proposing to use the existing electrical service to the site, which should be sufficient for the proposed development. Sanitary Sewer Finding: Section 4.3-105.A of the SDC requires that sanitary sewers shall be installed to serve each new development and to connect developments to existing mains. Additionally, installation of sanitary sewers shall provide sufficient access far maintenance activities. Finding: Pursuant to Chapter 3.02.4.e of the City's Engineering Design Standards and Procedures Manual and Section 3.6 of the City of Eugene Stormwater Management Manual, loading docks and hash enclosures shall be covered and hydraulically isolated from potential stormwater runoff, and directed to the sanitary sewer system (see also Section B above). The applicant is proposing to install a new truck loading dock to serve the warehouse building in the southwest corner of the site. The proposed loading dock drain discharges to the on-site stormwater management facility. However, there is no drain at the loading dock interface that is plumbed to the sanitary sewer system. Additionally, the applicant is proposing to have only a 2 -foot roofline overhang above the loading dock area. The overhang will need to comply with the requirements of Section 3.6 of the Eugene Stormwater Management Manual to allow for hydraulic isolation of the loading dock interface and the sewer drain. Alternatively, a sufficiently -sized canopy or awning could be installed to provide suitable coverage for the loading dock interface. Stormwater Manaeement Finding: Section 4.3-1103 of the SDC requires that the Approval Authority shall grant development approval only where adequate public and/or private stormwater management systems provisions have been made as determined by the Development & Public Works Director, and consistent with the City's EDSPM. Finding: Section 4.3-110.0 of the SDC states that a stormwater management system shall accommodate potential runoff from its entire upstream drainage area, whether inside or outside of the development. Finding: Section 4.3-1 IO.D of the SDC requires that runoff from a development shall be directed to an approved stonnwater management system with sufficient capacity to accept the discharge. Finding: Section 4.3-110.E of the SDC requires new developments to employ drainage management practices that minimize the amount and rate of surface water runoff into receiving streams, and that promote water quality. Finding: To comply with Sections 4.3410.1) & E, stonnwater runoff from the portion of the site being redeveloped will be treated with a combination of infiltration rain gardens and catch basin filters. The existing site is effectively 100% impervious and the overall site discharge will be to its historic collection point on the western property boundary. Water Ouah Finding: Under Federal regulation of the Clean Water Act (CWA), Endangered Species Act (ESA), and National Pollutant Discharge Elimination System (NPDES), the City of Springfield has obtained a Municipal Separate Storm Sewer System (MS4) permit. A provision of this permit requires that the City demonstrates efforts to reduce the pollution in urban stormwater to the Maximum Extent Practicable (MEP). Finding: Federal and Oregon Department of Environmental Quality (ODEQ) rules require that the City's MS4 plan addresses six "Minimum Control Measures." Minimum Control Measure 5, 'Post -Construction Stormwater Management for New Development and Redevelopment," applies to the proposed development. Finding: Minimum Control Measure 5 requires the City of Springfield to develop, implement and enforce a program to ensure the reduction of pollutants in stonnwater runoff to the MEP. The City must also develop and implement strategies that include a combination of structural or non-structural Best Management Practices (BMPs) appropriate for the community. Finding: Minimum Control Measure 5 requires the City of Springfield to use an ordinance or other regulatory mechanism to address post construction runoff firam new and re -development projects to the extent allowable under State law. Regulatory mechanisms used by the City include the Springfield Development Code (SDC), the City's EDSPM and the Stormwater Facilities Master Plan (SFMP). Finding: Section 3.01 of the City's EDSPM states the Development & Public Works Department will accept, as interim design standards for stornwater quality, water quality facilities designed pursuant to the policies and procedures of the City's EDSPM and the City of Eugene Stormwater Management Manual. Finding: Section 3.02 of the City's EDSPM states all public and private development and redevelopment projects shall employ a system of one or more post -developed BMPs that in combination are designed to achieve at least a 70 percent reduction in the total suspended solids in the runoff generated by that development. Section 3.03.4.E of the manual requires a minimum of 50 percent of the non -building rooftop impervious area on a site shall be treated for stonnwater quality improvement using vegetative methods. Finding: To meet the requirements of the City's MS4 permit, the SDC, and the City's EDSPM, the applicant is proposing to use a combination of infiltration planters and filtering catch basins on the site. Finding: The vegetation proposed for use in the planters will serve as the primary pollutant removal mechanism for the stonnwater runoff, and will remove suspended solids and pollutants through the processes of sedimentation and filtration. Satisfactory pollutant removal will occur only when the vegetation has been fully established. Finding: The applicant has provided a sample cross-section diagram for the proposed infiltration planters but no plant species list or planting schedule is included. Finding: The applicant has supplied an Operations and Maintenance Agreement that includes the infiltration planters but does not include the catch basin filters. Fire Protection Finding: The Eugene -Springfield Fire Department advises that the development site has sufficient access and water supply for fire protection. The applicant has proposed to install a new private fire hydrant near the southwest corner of the main warehouse commercial building on the site. The proposed fire hydrant would provide fire protection for the entire site. Finding: The applicant has clarified that building supplies — specifically, windows and doors — will be stored inside the new warehouse building and will comply with maximum overall stack height for Class BI stored materials. Drinkin¢ Water Protection Finding: The site is within the mapped 20+ year Time of Travel Zone (TOTZ) for the Q Street drinking water wellhead. The TOTZ should be noted on the Final Plot Plan as a reference contour for the City's drinking water wells. Based on the nature of the proposed development on the site (i.e. covered storage for commercial lumber and building materials), a Drinking Water Protection (DWP) permit is not required for this proposal. However, staff recommends observing "best practices" water quality protection measures during construction and operation of the facility. Finding: During site construction and operation, the applicant and their contractors shall be responsible for the safe handling and storage of chemicals, petroleum products, and fertilizers and the prevention of groundwater and stonnwater runoff contamination. The applicant should maintain a spill response kit at the site in the event of a hazardous materials spill. Finding: A standard Springfield wellhead protection sign will need to be posted outside the truck loading dock of the new warehouse building. Public and Private Easements Finding: Section 4.3-140.A of the SDC requires applicants proposing developments to make arrangements with the City and each utility provider for the dedication of utility easements necessary to fully service the development or land beyond the development area. The minimum width for all other public utility easements shall be 7 feet. The Development & Public Works Director may require a larger easement to allow for adequate maintenance. Finding There is an existing, vintage, public stonnwater main crossing the site at a skewed east -west alignment. The existing stormwater line runs beneath the building and does not appear to lie within a public utility easement. ❑ Complies as Shown on Plot Plan Proposal Complies when the following revisions are made: 2. The Final Plot Plan and architectural drawings for the warehouse building shall provide for a roof overhang above the truck loading dock bay door that meets the requirements of Section 3.6 of the Eugene Stormwater Management Manual. Alternatively, another mechanism such as an awning or canopy providing sufficient coverage shall be provided for the loading dock area. 3. The Final Plot Plan shall provide for a sanitary Door drain for the base of the truck loading dock interface at the new warehouse building. The Door drain shall be hydraulically isolated and plumbed to the sanitary sewer system. 4. Prior to approval of the Final Plot Plan, the applicant shall provide an Operations and Maintenance plan acceptable to the Cit' ensuring the long-term maintenance and operation of the catch basin filters as well as the infiltration planters, consistent with the maintenance criteria in Section 3.03.1 of the EDSPM. The plan shall designate maintenance responsibility for operating and maintaining the system, and should be distributed to all property owners and tenants of the site. 5. Prior to approval of the Final Plot Plan, the applicant shall submit a suitable vegetation plan for the infiltration planters to be used on the site. The vegetation plan shall list the species and number of plants to be installed in each planter. The City of Eugene Stormwater Management Manual and Chapter 6 of the EDSPM may be referenced for design. 6. The Final Plot Plan shall provide for installation of a standard wellhead protection sign at the truck loading dock for the new warehouse building. SUMMARY Timelines and Required Revisions: The applicant has 90 days from the date of this decision (ic. by January 21, 2021) to submit a Final Plot Plan demonstrating compliance with the following required revisions: 1. The Final Plot Plan shall provide for installation of a Door drain that is nlumhed to the sanitary sewer system for the existing trash and recycling enclosure on the site. New drain included. See Civil sheets. 2. The Final Plot Plan and architectural drawings for the warehouse building shall provide for a roof overhang above the truck loading dock bay door that meets the requirements of Section 3.6 of the Eugene Stormwater Management Manual. Alternatively, another mechanism such as an awning or canopy providing sufficient coverage she!! he prarided ar!he !o_d!^.g d^_^k =r^e. Overhang revised, new drain included. See Arch and Civil sheets. 3. The Final Plot Plan shall provide Por a sanitary uoor drain Por the base of file truck ivaiiwg riuck inieriawe at the new warehouse building. The Door drain shall be hydraulically isolated and plumbed to the sanitary sewer system. New drain included. See Civil sheets. 4. Prior to approval of the Final Plot Plan, the applicant shall provide an Operations and Maintenance plan acceptable to the Cit ensuring the long-term maintenance and operation of the catch basin filters as well as the infiltration planters, consistent with the maintenance criteria in Section 3.03.1 of the EDSPM. The plan shall designate maintenance responsibility for operating and maintainine the system, and should be distributed to all property owners and tenants of the site. O&M Included In new documents. 5. Prior to approval of the Final Plot Plan, the applicant shall submit a suitable vegetation plan for the infiltration planters to be used on the site. The vegetation plan shall list the species and number of plants to be installed in each planter. The Cit, of Eugene Stormwater Management Manual and Chanter 6 of the EDSPM may be referenced for desigm planting plan included in new documents. See Civil sheets. 6. The Final Plot Plan shall provide for installation of a standard wellhead protection sign at the truck loading dock for the new warehouse building. Signage noted. See Civil sheets. In order to complete the review process, a Development Agreement is required within 90 days train the date of Final Plot Plan approval to ensure the terms and conditions of this application are binding upon both the applicant and the City. This agreement will be prepared by Staff upon approval of the Final Plot Plan, and must be signed by the property owner prior to issuance of a building permit or occupancy. THE APPLICANT MAY SUBMIT CONSTRUCTION OR BUILDING PLANS TO OTHER CITY DEPARTMENTS FOR REVIEW PRIOR TO FINAL PLOT PLAN APPROVAL IN ACCORDANCE WITH SDC 5.17-135 AT THEIR OWN RISK. ALL CONCURRENT SUBMITTALS ARE SUBJECT TO REVISION FOR COMPLIANCE WITH THE FINAL PLOT PLAN. A DEVELOPMENT AGREEMENT IN ACCORDANCE WITH SDC 5.17-140 WILL NOT BE ISSUED UNTIL ALL PLANS SUBMITTED BY THE APPLICANT HAVE BEEN REVISED. CONFLICTING PLANS CAUSE DELAYS. The construction of the required improvements shall begin within two (2) years of the execution of the Development Agreement. If the established timeline cannot be met, the applicant may submit a written request for a timeline extension as specified in SDC Section 5.15-125.C. The Director may allow a one-time extension of the two year start of construction time line due to situations including but not limited to, required permits from the City or other agencies, weather conditions and the unavailability of asphalt or the unavailability of street trees. If the time extension is allowed, security shall be provided as specified in SDC Section 5.17-150. The time line extension shall not exceed an additional one year. If the established timeline is not met and the applicant has not requested an extension, the Director shall declare the application null and void if the property is occupied and the property owner shall be considered in violation of this Code. If the established timeline is not met and the applicant has requested an extension and that timeline has not been met, the Director may require that the improvements be installed as specified in SDC Section 5.17-150. Additional Information: The application, all documents, and evidence relied upon by the applicant, and the applicable criteria of approval are available for free inspection and copies are available for a fee at the Development Services Department, 225 Fifth Street, Springfield, Oregon. Appeals: This Type I Ministerial decision is exempt from the provisions of ORS 197.195, 197.763 and 227.173 and therefore cannot be subject to the appeal provisions of SDC Section 5.3-100, Appeals. In the event the applicant disagrees with the application of the development standards in this decision, the applicant may request a Type IB Formal Interpretation or a Type II Site Plan Review application. Questions: Please call Andy Limbird in the Land Development Division of the Development & Public Works Department at (541) 726-3784 or email alimbird@soringf Id -or goy if you have any questions regarding this process. Prepared by: Qwelry, �im�vea� Andy Limbird Senior Planner Please be advised that the following is provided for information only and is not a component of the Minimum Development Standards decision. FEES AND PERMITS SYSTEMS DEVELOPMENT CHARGE: Pay applicable Systems Development Charges when building permits are issued for developments within the City limits or within the Springfield Urban Growth Boundary. (The cost relates to the amount of increase in impervious surface area, transportation trip rates, and plumbing fixture units. Some exceptions apply to Springfield Urban Growth areas.) [Springfield Code Chapter 11, Article 11] Systems Development Charges (SDCs) will apply to the construction of buildings and site improvements within the subject site. The Charges will be based upon the rates in effect at the time of permit submittal for buildings or site improvements on each portion or phase of the development. Staff can prepare an SDC estimate for the proposed project on request. The final charge will be calculated at the time of Building Plans submittal using documents submitted for the Building Permits. OTHER CITY PERMITS: Encroachment Permit or Sewer Hookup Permit (working within rigbt-of-way or public easements) example: new tap to the public storm or sanitary sewer, or adjusting a manhole. [The current rate is $345.00 for processing plus applicable fees and deposits] Land & Drainage Alteration Permits (LDAP) for stripping and/or grading activities. [Contact the Springfield Development & Public Works Department @ 541-726-5849 for appropriate applications/requirements] ADDITIONAL PERMITS/APPROVALS MAY BE NECESSARY: • Building Permit(s) for plumbing, electrical and structural work on the site • Building and Fire inspections for any buildings or portions of buildings being constructed • Commercial Paving Permit, if applicable O&M Plan Parr Lumber — Phase 2 Stormwater Operations and Maintenance Plan Parr Lumber — Phase 2 December 17, 2020 Prepared by: Kelly Ota, P.E. Harper Houf Peterson Righellis Inc. 205 SE Spokane Street Portland, OR 97202 Responsibility These facilities are to be maintained by the Owner. The system can easily be maintained by maintenance staff, and this maintenance plan can be used as a reference for that work. Property Legal Description: Township 17 South Range 3 West, Section 35, SE Y, NE Y, Taxlot 9200 Description Stormwater management for the redeveloped southern portion ofthis site is met using infiltration rain gardens. The released flows from these facilities are collected on-site and directed to an existing private site storm line. This private storm line flows to a public storm line, which exists on site through an easement to the city. Infiltration rain gardens are landscaped basins used to infiltrate, detain, and filter stormwater runoff, allowing pollutants to settle and filter out as stormwater infiltrates into the soil. Higher flows will overflow the rain garden and flow into the piped system. Existing stormwater catch basins impacted by this redevelopment will be retrofitted with Flogard insert filters. Flogard inserts provide solids filtration through a filter liner and hydrocarbon capture with an absorbent pouched material. Notice of Operations and Maintenance Agreement Private Stormwater Management and Treatment System The undersigned owner(s), is hereby given notice that stormwater runoff from the "Property' described below requires stormwater management facilities to be located, designed, and constructed in compliance with the City of Springfield's Engineering Design and Procedures Manual. Said facilities shall be operated and maintained in accordance with the Operations and Maintenance Agreement (O&M Agreement) on file with the City of Springfield, Development and Public Works Department. Parr Lumber (Property Owner/Developer) acknowledges and agrees to maintain private stonnwater treatment facilities listed in this document. The maintenance of the stomnwater facilities listed in this document is required as part of the Development Agreement with the City of Springfield. This facility will be operated and maintained in accordance with the requirements stated in this document and in the latest edition of the City of Springfield Engineering Design Standards and Procedures Manual, Chapter 3. The City reserves the right to enter and inspect any stow nwater facility located on the "Property' to ensure the facilities are operating as designed. Failure of the responsible party to inspect and maintain the facilities can result in an adverse impact to the public stomnwater system and the quality of receiving waters. The requirement to operate and maintain the stonnwater treatment facilities in accordance with the approved site development agreement and the site O&M Agreement is binding on all current and future owners of the property. The Agreement and its O&M Plan may be modified under written consent of new owners with written approval by and re -filing with the City. The O&M Agreement and O&M Plan for facilities constructed pursuant to this notice are available at the Development and Public Works Department, 225 Fifth St, Springfield Oregon, or call (541)-736-3753, between the hours of S a.m. and 5 IT m., Monday through Friday. The Subject premises, is legally described as follows: (Tax lot minter cannot be usedto describe the property. Legal rkscriphons may be obtatredfronn the conolly assessor's office). SEE EXHIBIT "A" ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE By signing below, the signer accepts and agrees to the terms and conditions contained in the Operations and Maintenance Plan and in any documents attached. This instrument is intended to be binding upon the parties hereto, their heirs, successors, and assigns. In Witness whereof, the undersigned has executed this instrument on this day of 20 Owner(s): Signature Print Name STATE OF OREGON, County of Lane, ❑ Thus instrnment as acknowledged beforeme on by , owner(s) of the above described premises. ❑ Thus instrnment as acknowledged beforeme on by as of Notary Public for Oregon RETURN TO: CITYOF SPRINGFIELD DEVELOPMENT &PUBLIC WORKS DEPT. 225 FIFTH ST. SPRINGFIELD, OREGON 97477 owner(s) of the above described My Commission Expires RESERVE THIS SPACE FOR RECORDING STICKER "Avoid $20 nonstanda orc (font too small)... Print this form on Legal size paper." Appendix 3A-1 RevontTltD Page 1 of 1 EDSP Adopted December 03, 2012 Land I Owner Phone Mailin Site Operations and Maintenance Agreement Private Stormwater Management and Treatment System Site Map and Tax lot No.: 1703354109200 (Or attach document with adrfltional lot information ifthe facility crosses more than one lot) Type ofFacility(ies) Rain Gardens and Flocard catch basin inserts Requirements 1) Stormwater Management Site Plan, (min. 8 1/2" x 11" attached to this form) showing the location of the facility(ies) in relation to building structures or other permanent monuments on the site, sources of runoff entering the facility(ies), and where stormwater will be discharged to after leaving the fmility(ies). Landscape and vegetation should be clear on the Plan submitted or submit a separate Landscape Plan document showing vegetation type, location, and quantity (landscape plan). These can be the same Plans submitted for development review. The stormwater management facility(ies) shown on the Site Plan are a required condition of development approval for the identified property. The owner of the identified property is required to operate and maintain the facility(ies) in accordance with the Facility Specific Operation and Maintenance Plans) (O&M Plan(s)) attached to this form and on file with the City. The O&M Plan for the facility(ies) will be available at the Development and Public Works Department, 225 5's Street, Springfield, Oregon between the hours of 8 a.m. and 5 p.m, Monday through Friday. 2) Financially responsible party (circle one): Property Owner Homeowner Association Other (describe) 3) Party(ies) responsible for maintenance (only if other than owner). Daytime phone no. (� Emergency/after-hours contact phone no Maintenance Contact Party(ies) Name & Business Address:. 4) Maintenance practices and schedule for the stormwater fmility(ies) are included in the Facility Specific O&M Plan(s) attached to this form and filed with the Development and Public Works Department, City of Springfield. The operation and maintenance practices are based on the version of the City of Eugene's Stomrwater Management Manual in effect at the date of development application, as modified by any plans attached to this document at the time of signing. Application Date: By signing below, Filer accepts and agrees to the terns and conditions contained in the Operations and Maintenance Plan(s) and in any document executed by Filer and recorded with it. Filer Signature: Print Name: Appendix 3A-2 Rev 01/26/16 Page 1 of 1 EDSP Adopted December 03, 2012 _ EXISTING COLLECTION 1 POINT FOR BASIN P1 (ROADWAY GUTTER) EXISTING COLLECTION �I POINT FOR BASIN P2 (ASSUMED CONNECTION TO PUBLIC 24" WOOD STORM) EXISTING CATCH BASIN —m ----- EXISTING COLLECTION POINT FOR BASINS P3 -P10 (ASSUMED ROUTING TO • PUBLIC 24" WOOD STORM) �, 1 EXISTING CATCH BASIN NEW FLOGARD CATCH BASIN INSERT FILTER I 1 1 1 � 67+00 'IN BASIN s,� P2 / PHA BASIN 68+00 69+00 70+00 i 126_RLc— — 1-1 — EXISTING BUILDING BASIN BASIN � Wx\ \ 1 ------------ H T -SHED I ASPHALT PAVEMENT SHED 11 III BUILDING PROPOSED GRAVEL - RAIN GARDEN A - PROPOSED RAIN GARDEN _ J OVERFLOW DRAIN (SNICN PACIFIC RAlLROA0 PROPOSED RAIN GARDEN B R E V I S 1 0 H PROPOSED SANITARY CATCH BASIN EXISTING CATCH BASIN NEW FLOGARD CATCH BASIN INSERT FILTER TRENCH DRAIN PROPOSED SANITARY CATCH BASIN EXISTING COLLECTION POINT FOR BASIN P11 (ROUGH DITCH LINE) o 1-. Houf Peterson Righellis Inc. R KKV SCALE: 1"= 60 ' CELEMERIDID ryRB em�in�etea4—ewrtvm.� min uv� 0 30 60 120 SCALE: 1"= 60 ' 0&M RAIN GARDEN & CATCH BASIN PLAN PARR LUMBER - PHASE 2 SPRINGFIELD, OREGON 1 PARS 2.3.9 Rain Garden Facility Description Rain Gardens are vegetated, flat bottomed, Rain Gar shallow landscape depressions used to collect and hold stormwater runoff. This allows pollutants to settle and filter out as water infiltrates into the ground. Rain gardens are water reservoirs to collect and treat stormwater runoff by allowing the pollutants to settle and filter out as the water percolates through vegetation and soil mediums before infiltrating into the ground below or being piped to its downstream destination. Rain gardens can also be sized to infiltrate the flood control design storm and are often used as complete on-site systems. Rain gardens can be configured in a number of different shapes making them very versatile for integrating into site and landscape plans Rain Gardens can be used to help fulfill a site's required landscaping area requirement and should be integrated into the overall site design. Numerous design variations of shape and planting scheme can be used to fit the character of a site. Rain Gardens qualify as infiltration and filtration facilities. Rain Gardens meet the stormwater management standards for water quality and flow control when designed under the Simplified Approach. Rain Gardens meet the stormwater management standards for water quality, flow control and flood control when designed under the Presumptive Approach. Design Requirements All facilities shall require an overflow to an approved discharge point unless sized to fully infiltrate the flood control storm Sizing, The Simplified Approach may be utilized for surface areas less than 15,000 square - feet of impervious area. Rain Gardens shall use a sizing factor of 0.05 for water quality using the Simplified Approach. Rain Gardens shall use a sizing factor of 0.11 for flow control with the Simplified Approach. Stormwater Management Manual 2-25 Eugene 2014 The Presumptive Approach shall be used for all other water quality, flow control and flood control designs in conjunction with a measured infiltration rate. Rain gardens shall be designed to pond water for less than 30 hours after each storm event. Soil Suitability: Soils with infiltration rates greater than 2 in/hr shall be designed as infiltration treatment facilities. Soils with infiltration rates less than 2 in/hr shall be designed as filtration facilities. Dimensions and Slopes: The facility storage depth must be at least 6 inches, unless the rain garden is horizontally sized larger than required. The facility storage depth shall be no more than 12 inches. Side slopes shall be a maximum of 3:1. The minimum bottom width shall be 2 feet. The bottom shall have no more than 0.5% slopes. Setbacks: Rain Gardens located within 10 -feet of building structures or 5 feet of property lines must be lined with an impermeable waterproof liner. Materials Pining: Pipes shall be sized to convey design flow rates but shall be no less than 3 inches for private piping. Private piping shall conform to the requirement of the Uniform Plumbing Code. Sizing of public conveyance piping shall conform to the Public Improvement Design Standards Manual. Drain Rock: Drain rock may be used below the growing medium of a Rain Garden. Drain rock can be used for retention, detention or conveyance. Drain rock shall be open graded, washed 3/4 inch to 2-1/2 inch diameter. Drain rock and growing medium must be separated by a geotextile. Mulch: Washed pea gravel, river run rock or other non -floating mulch is recommended for Rain Gardens. It should be applied 2 - 3 inches thick to cover all solid areas between plants. It should not be over applied. Waterproof Liners: The use of waterproof liners is discouraged as infiltration is encouraged on all facility types. Waterproofing liners may be required in areas where hydraulic isolation is required due to existing structural, hydrologic or geotechnical limitations. Rain Gardens located within 10 feet of building foundations or 5 feet of property lines must be lined with an impermeable membrane of 30 mil (minimum) plastic film or equivalent. Vegetation The entire Rain Garden must maintain 90 percent coverage for vegetation. Vegetation shall conform to the facility planting list located in Appendix D. Stormwater Management Manual 2-26 Eugene 2014 Vegetated Rain Gardens shall be planted with minimum plant quantities from Schemes I, II or III. Minimum plant quantities for vegetated Rain Gardens are as follows: Vegetated Rain Garden Planting Scheme I II III Ground Cover, 4 -inch pots spaced 1' on center (per 100 80 80 100 square feet of the facffit Large Shrubs, 3 gal. pots spaced 4' on center (per 2 2 100 square feet of the facffit Small Shrubs, 1 gal. pots spaced 2' on center (per 4 4 100 square feet of the facffit Evergreen tree, min. 6' height (per 200 square feet 1 of the facility) Deciduous tree, 1-1h inch caliper (per 200 square 1 feet of the facility) Rain Gardens may elect to use grasses for side slopes. Grasses on side slopes must have 100 percent coverage at establishment by native grasses, turf grasses, native wildflower blends, native ground covers, or any combination thereof Seed shall be applied at the rates specified by the supplier. Vegetation or seed cover shall be established as soon as possible after the Rain Garden is completed, and before water is allowed to enter the facility. Unless vegetation or seed cover is established, biodegradable erosion control matting shall be installed in the flow area of the Swale before allowing water to flow through the Swale. Growine Medium: The growing medium shall be a minimum 12 inches of topsoil or the soil shall be amended to support plant growth. Imported topsoil shall be a sandy loam mixed with compost or a sand/soil/compost blend. It shall be roughly one-third compost by volume, free -draining, and support plant growth. The compost shall be derived from plant material; animal waste is not allowed. In all cases, the growing medium shall be 12 inches deep. Stormwater Management Manual 2-27 Eugene 2014 >IRE SK Dfl GBIOB WIS fIX 3:1 W. Z R Y . �J INNING(IDESLP ML BOiDa 'AfLY� tIflIB /� GPJWNG lI N II i sy %: 1 DRMN ROCK NEit rg11C ..-T.-.T- hIID'x i0 OPPRfJ.IDIXISTNC SUBCRAOE )i miff 1 1. Provide protection from all vehicle traffic, equipment staging, and bot traffic in proposed infiltration areas priorlo, during, and after construction. 2. Dimensions: a. Depth of rain garden: 6" minimum and 17 maximum b. Flat bottom width: 2' min. c. Side slopes of Rain Garden: 3:1 maou num. 3. Setbacks: a. Infiltration rain gardens must be 1 I from foundations and 5' ftom property lines. Filtration Rain Garden do not require a setback with an approved waterproof liner. 4. Overlow: a. Overflows are required unless sized to fully infiltrate the flood control design storm. b. Inlet elevation must Alm for 2" of freeboard, minimum. 5. Piping: Minimum 3" pipe required for up to 1,5DD sq fl of impervious area, otherwise F min. Piping material, slopes and installation shal blow the Unflarm Plumbing Code, 6. Growing medium: a.12" minimum b. Imported topsoil or amended native topsoil. Vegetation: Folowlandscape plans otherwise refer to plant list in SIMAMAppendi F. Number of plantings per 1DDsf offacility area: a.1DD Ground Covers, OR b. 8D Ground Covers, 2 Large Shrubs 4 Small Shrubs and 1 tress (deciduous or evergreen) 11). Install washed pea gravel or river rock to transition from inlets and splash pad to growing medium. CITY OF INFILTRATION RAIN GARDENscn�E "Nis EUGENE, OREGON DRnuN err sNG 2 DEPARTMENT OF PUBLIC WORKS TYPICAL DETAILS ENGINEERNG DIVISIDN STORMWATER MANAGEMENT FACILITY INSPECTION AND MAINTENANCE LOG Property Address: 1291 S A Street, Springfield, Oregon 97477 Inspection Date: Ins ection Time: Inspected By: Approximate Date/Time of Last Rainfall: Type of Stormwater Management Facility: Rain garden Location of Facility on Site (In relation to buildings or other permanent structures): Water levels and observations (Oil sheen, smell, turbidity, etc.): Sediment accumulation and record of sediment removal: Condition of vegetation (Height, survival rates, invasive species present, etc.) and record of replacement and management (mowing, weeding, etc.): Condition of physical properties such as inlets, outlets, piping, fences, irrigation facilities, and side slopes. Record damaged items and replacement activities: Presence of insects or vectors. Record control activities: Identify safety hazards present. Record resolution activities: Appendix 3A-3 Page 1 of 1 EDSP Adopted December 03, 2012 Rain Gardens Operations and Maintenance Plan A vegetated Infiltration Basin or rain garden is a vegetated depression created by excavation, berms, or small dams to provide for short-term ponding of surface water until it percolates into the soil. The basin shall infiltrate stormovater within 24 hours. All facility components and vegetation shall be inspected for proper operations and stmchual stability, at a minimum, quarterly for the first 2 years from the date of installation, 2 times per year thereafter, and within 49 hours after each maj or storm event. The facility owner must keep a log, recording all inspection dates, observations, and maintenance activities. The following items shall be inspected and maintained as stated: Basin Inlet shall assure umestiicted stormwater flow to the vegetated basin. • Sources of erosion shall be identified and controlled when native soil is exposed or erosion channels are present. • Inlet shall be cleared when conveyance capacity is plugged. • Rocks lash pads shall be replenished to prevent erosion. Embankment, Dikes, Berms and Side Slopes retain water in the infiltration basin. • Structural deficiencies shall be corrected upon discovery: o Slopes shall be stabilized using appropriate erosion control measures when soil is exposed/ flow charnels are forming. o Sources of erosion damage shall be identified and controlled. Overflow or Emergency Spillway conveys flow exceeding reservoir capacity to an approved stormwater receiving system. • Overflow shall be cleared when 25% of the conveyance capacity is plugged. • Sources of erosion damage shall be identified and controlled when soil is exposed. • Rocks or other armament shall be replaced when only one layer of rock exists. Filter Media shall allow stormwater to percolate uniformly through the infiltration basin. If water remains 36-49 hours after storm, sources of possible clogging shall be identified and corrected. • Basin shall be raked and, if necessary, soil shall be excavated, and cleaned or replaced. • Infiltration area shall be protected from compaction during construction. Sediment/ Basin Debris Management shall prevent loss of infiltration basin volume caused by sedimentation. Gauges located at the opposite ends of the basin shall be maintained to monitor sedimentation. • Sediment and debris exceeding 3 inch in depth shall be removed every 2-5 years or sooner if performance is affected. Debris and Litter shall be removed to ensure stormovater infiltration and to prevent clogging of overflow drains and interference with plant growth. • Restricted sources of sediment and debris, such as discarded lawn clippings, shall be identified and prevented. Vegetation shall be healthy and dense enough to provide filtering while protecting underlying soils from erosion. • Mulch shall be replenished as needed to ensure healthy plant growth • Vegetation, large shrubs or trees that limit access or interfere with basin operation shall be pruned or removed. • Grass shall be mowed to 4"-9" high and grass clippings shall be removed no less than 2 times per year. • Fallen leaves and debris from deciduous plant foliage shall be raked and removed if build up is damaging vegetation. • Nuisance or prohibited vegetation (such as blackberries or English Ivy) shall be removed when discovered. Invasive vegetation contributing up to 25% of vegetation of all species shall be removed. • Dead vegetation shall be removed to maintain less than 10% of area coverage or when infiltration Appendix 3A-4 Page 15 of 31 EDSP Adopted December 03, 2012 basin function is impaired. Vegetation shall be replaced within 3 months, or immediately if required to control erosion. Spill Prevention measures shall be exercised when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified. Training and/or written guidance information for operating and maintaining vegetated infiltration basins shall be provided to all property owners and tenants. A copy of the O&M Plan shall be provided to all property owners and tenants. Access to the infiltration basin shall be safe and efficient. Egress and ingress routes shall be maintained to design standards. Roadways shall be maintained to accommodate size and weight of vehicles, if applicable. • Obstacles preventing maintenance personnel and/or equipment access to the infiltration basin shall be removed. • Gravel or ground cover shall be added if erosion occurs, e.g., due to vehicular or pedestrian traffic. Insects and Rodents shall not be harbored in the infiltration basin. Pest control measures shall be taken when insects/roderts are found to be present. • If a complaint is received or an inspection reveals that a stormwater facility is significantly infested with mosquitoes or other vectors, the property owner/owners or their designee may be required to eliminate the infestation at the City inspector's discretion. Control of the infestation shall be attempted by using first non -chemical methods and secondly, only those chemical methods specifically approved by the City's inspector. Acceptable methods include but are not limited to the following: i. Installation of predacious bird or bat nesting boxes. ii. Alterations of pond water levels approximately every four days in order to disrupt mosquito larval development cycles. iii. Stocking ponds and other permanent water facilities with fish or other predatory species. iv. If non -chemical methods have proved unsuccessful, contact the City inspector prior to use of chemical methods such as the mosquito larvicides Bacillus thurengensis var. israchensis or other approved larvicides. These materials may only be used with City inspector approval if evidence can be provided that these materials will not migrate off-site or enter the public stormwater system. Chemical larvicides shall be applied by a licensed individual or contractor. • Holes in the ground located in and around the infiltration basin shall be filled. If used at this site, the following will be applicable: Fences shall be maintained to preserve their functionality and appearance. • Collapsed fences shall be restored to an upright position. • Jagged edges and damaged fences shall be repaired or replaced. Appendix 3A-4 Page 16 of 31 EDSP Adopted December 03, 2012 FloGard®+PLUS Catch Basin Insert Filter GENERAL FILTER CONFIGURATION FlaGard®rpLU$ catch basin imertfilker shall provide solids filhatbn through a filter screen or filter liner, and hydrocarbon opium shall be e" using a non-loaching obssrberemakerial cankeined in a pouch or similar nemovable restraint. Hydrocarbon obsorbentsholl netbe plows aton egased locatbn atthe entry b the filter that would allow Uirding by debris and sdimentwithoul prevision for selfcleaning in operatbn. Filtershop cardarm to the dimensions of the inlet in which it is applied, allow nemwal and replacement of all internal components, and allow camplde inspection and cleaning in the fila. FLOW CAPACITY Filter shall provide Iwo intenal higbuav bypass locatiom that in tool exceed the inlotpeak flow capacity. Fifer shall provide littered Bow capacity in aaess of the required°EM f6h" trweeo flow. Unit shall no innpede winto or through the catch basin when properly sized and imbued. MATERIALS Filter support Inane shall be constructed of type 334 stainless skeel. Filter Breen, when used in place of filter liner, shall be type 334 or 316 stainless steel, with an apparent opening size of no less than 4 U.S. mesh. Filter liner, when used in place of filter screen, shall be woven polypropylene geoWle fabric liner with an Wrenn opening size IACSI of rot less than 40 U.S. mesh as determined by ASTM D 4751. Filter liner shall include a sypod basket of polypropylene Ell with sunless steel cable reirdacemeo. Fifer frame shall be raked ata minimum 25 -year service life. All other materials, with the exception of the hydrocarbon absorbent, shall hove a rated service Ire in excess of 2 years. FloGard6ows TEST RESULTS SUMMARY Testing Agency %TSBBernwal I %011end Owase Remasal %PAHRemasal UCLA 80 70 to 80 U of Anoka nal Ton king & Taylor Ltd. 78 to 95 for city of Auckland U of Hawaii 8g 20 to 40 (for city of Honolulu) KRISTAR �Od�ard° t�'LUS Catch Basin Insert Filter FEATURES • Easy b install, inspect and maintain • Can be rdrditid to misting drain catch basins - orwed in new projects • Ecancenical and efficient • Call pd46ne where they are easiest local (al the inkt) • No standing wall - minmizes nectar, bacteria and odor problems • Can be incorporated as part of a °Trermeo Train" BENEFITS • Lower installation, inspection and mainkeneneeccets • Versatile imbllafian applications • Higher return on inmeAs eo • Allows fa imtal6fian an small and coshr�ed sill • Minimizes vector, bacteria and odor problems • Allows user b target specific pollutants �lard° *PLUS si Catch Basin Insert Filter INSTALLATION AND MAINTENANCE Filter shall be installed and nniMrined in accardonce with manerkidurees general imhutnm and rezemmendal PERFORMANCE Filter shall provide 80% mi oftall suspended solids (l ken treated flow with a paddesae distributor, wnsistentwith "kal urban street depositad sediments. Filer shall wptare at least 70% of oil and grease and 40% of trial phwpi (l associakd with organk debris km treated flow. Unitshall prande for isoldion of trapped pollutants, ircluding debris, sediments, and Imitable trash and hydrocarbons, from bypass flow suh that resuspension and los of pollutants is mininnissed during peak Bow eeMs. FloGardillows COMPETITIVE FEATURE COMPARISON Evaluation 0 FloG0nli Units (Baa¢d On f ovC mpYBPI¢ anlla) (Seen 1-10,10 Pena Pon) FloGnunt 3 Other lead Filter Thi FIgO RBB 10 7 Removal E01e19eW M 45% Coqualty—SIolge in 011 T 7 $ervla LIN 10 3 Installation— Fas¢ M Handling I Installation 6 6 Esse a Inspection &MBl element 7 7 Value 10 2 'a ppmernmem Wasnal on rin saalmeir rem" rarryln urban snee[apprpbon •arerzpe Long Term Coed Comps son (6eale 1 10,10 be ng lmt st cost, maM1¢rnamP r b llry P¢A) FIO(inhat 065 Other mart Filter Types Unit cosi—initial($/es treated) 19 4 Installation cost($/es treated) 9 6 Adsorbent replacement(annual avg$/cfstreatey 19 2 Unit materials replacement(annual wg$/¢is treat 19 19 Ma1m¢nance cost (annual wg$bfs triater!) 9 6 T01flmtyrl$/ohtreate0) 19 5 Total Antral A"($/eg traded. eq Wer 20 yi 19 5 assumes a v. anneal mention Captured debris From FloGordtPLUS, Dana Poie, CA NSW KRISTAR "'ropgr CmbimPm Roreeman nor ..,emrrr"x NeGar&PLUS F61G. NeGe US t; RaedGredn4t K,,Sbr Enierpbses,1- P 0. B. 6419 Sonia Rua, CA 954061419 PH00057W819 FAX7075241P106 www.laislartam 02WM. an.a6w, nc 1FPT 11,11hon. fl »d a'a. mid n&r[deme. Br. STORMWATER MANAGEMENT FACILITY INSPECTION AND MAINTENANCE LOG Property Address: 1291 S A Street, Springfield, Oregon 97477 Inspection Date: Inspection Time: Inspected By: Approximate Date/Time of Last Rainfall: Type of Stormwater Management Facility: FloGard catch basin insert filters Location of Facility on Site (In relation to buildings or other permanent structures): Water levels and observations (Oil sheen, smell, turbidity, etc.): Sediment accumulation and record of sediment removal: Condition of vegetation (Height, survival rates, invasive species present, etc.) and record of replacement and management (mowing, weeding, etc.): Condition of physical properties such as inlets, outlets, piping, fences, irrigation facilities, and side slopes. Record damaged items and replacement activities: Presence of insects or vectors. Record control activities: Identify safety hazards present. Record resolution activities: Appendix 3A-3 Page 1 of I EDSP Adopted December 03, 2012 PARR LUMBER SPRINGFIELD, OREGON FLOGARD+PLUS® CATCH BASIN INSERT FILTER OPERATIONS AND MAINTENANCE Sl A division of OldcastkPre ast 6 Stormwater Training and written guidance shall be provided to all property owners, managers and tenants. A copy of this O&M Plan shall be provided to all owners, managers and tenants. Spill Prevention measures shall be exercised when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified. RECOMMENDED FREQUENCY OF SERVICE: Drainage Protection Systems (DPS) recommends that! nstalled FloGard+PlusCatch Basin InsertFiltersbe serviced on a recurring basis. Ultimately, thefrequency dependson theamountof runoff, pollutant loading andinterference from debris (leaves, vegetation, cans, paper, etc.); however, it is recommended thateach installation beserviced a minimum of three times per year, with a change of filter medium once per year. DPS technicians are available to do an onsite evaluation, upon request. RECOMMENDED TIMING OF SERVICE: Inlets shall be inspected on a weekly basis during wet weather months from October through May. Inspections during dry months shall be scheduled after every rainfall event during dry months from June through September. SERVICE PROCEDURES: 1. The catch basin grate shall be removed and set to one side. The catch basin shall be visually inspected fordefects and possible illegal dumping. If illegal dumping has occurred, the properauthorities and property owner representative shal I be notified as soon as practicable. 2. Using an industrial vacuum, the collected materials shall be removed from the liner. (Note: DPS uses a truck -mounted vacuum for servicing FloGard+Plus catch basin inserts.) 3. When all ofthecollected materials have been removed, the filter medium pouches shall be removed by unsnapping the tetherfrom the D -ring and setto oneside. The filter liner, gaskets, stainless steel frame and mounting brackets,etc., shall be inspected forcontinued serviceability. Minordamageor defects found shall becorrected on-the-spotand a notation madeon the Maintenance Record. 4. More extensivedeficiencies thataffect the efficiency of the filter (torn I iner, etc.) will becorrected and recorded in the Maintenance Record. 5. Thefiltermedium pouchesshall be inspected fordefects and continued serviceability and replacedas necessary and the pouch tethers re -attached to the liner's D -ring REPLACEMENT AND DISPOSAL OF EXPOSED FILTER MEDIUM AND COLLECTED DEBRIS The frequency of filter medium be change occur at least once per year. During the appropriate service, or if so determined by the service technician during a non-scheduled service, the filter medium will be replaced with new material. Once the exposed pouches and debris have been removed they must be disposed of it in accordance with local, state and federal agency requirements. r Harper r ,<� ,Q _ Houf Peterson r� Righellis Inc. r Prepared For: Parr Lumber 5630 NW Five Oaks E Hillsboro, Oregon 971 Prepared By Harper Houf Peterson 205 SE Spokane Street Portland, OR 97202 P: 503-221-1131 F:51 Kelly Ota P.E. - Civil E Parr Lumber- Phase 2 PAR -36 Stormwater Management Report DEVELOPMENT AND PUBLIC WORKS SPRINGFIELD—" 225 INGFI STREET ORaGGK SPRINGFIELD, OR 97477 PHONE.' 541.726.3753 FAX..- 541.726.1021 www.spdngfield-or.gov STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK -------------------- __ (Area below this linefilled out by Applicant) ---------------- ._ .. _________ (Please return to Clayton 1f Eachern @ City of Springfield Development and Public Warks; Fax # 736-1021, Phone # 736-1036), email: emceaehern@springfield-or.gov Project Name: Parr Springfield - Phase 2 Applicant: Kelly Ota Assessors Parcel #: 1703354109200 Date: August 10 2020 Land Use(s): Industrial - Lumber storage yard Phone #: 503-221-1131 Project Size (Acres): 1.09 ac Fax #: 503-221-1171 Approx. Impervious Area: 0.81 ac Email: KellyO@hhpr.com Project Description (Include a copy of Assessor's map): Redevelopment (Phase 2) of the south portion of the Parr Lumber site at 1291 S A Street. Phase 1 completed in 2018. Phase 2 consists of 1 new warehouse building, 1 new lumber shed, and 1 new T -shed, along with new asphalt pavement and stormwater facilities. Drainage Proposal (Public connection(s), discharge location(s), etc. Attach additional sheet(s) if necessary: The majority of the proposed redevelopment area will surface flow to proposed filtration rain gardens. Overflow from the rain gardens will connect to the existing site storm system, which outfalls to the existing public 24" wood storm running through an easement on site. Proposed drainage patterns for the site will remain largely the same as the existing condition. See attached site plan. Proposed Stormwater Best Management Practices: The redeveloped portion of the site will be treated with rain gardens (per the development issues meeting, only treatment will be required). Existing catch basins with be protected with inlet protection. r----- _,:---------- (ifrtac tsd th& line tilled an hr rrrc Cin, and Returned to the AOer t) ------ - ---- (AI a mmemum.'all boxes checked by the City on the (rant and back of ibis sheet shall he.submkted or an application to he com Tete ar.submittal, although other requirements may he necessary.) DrainageStudy Type (EDSPM Section 4 03 2)� (Note UH may be substituted for Rational Method) ❑ Small Site Study — (use Rational Method for calculations) ® Mid -Level Development Study — (use Unit Hydmgraph Method for calculations) ❑ Full Drainage Development Study — (use Unit Hydmgraph Method for calculations) Environmental Considerations Wellhead Zone: ❑ Hillside Development: pr A Floodway/Floodplain: VIA Wetland/Riparian:❑ Soil Type: 1 Other Jurisdictions �y� A Downstream Analysis: ® N/A -PO„ daelarr+n{ cont elrt.eecj Gurrehi rVnd r^iCS ❑ Flow line for starting water surface elevation: ❑ Design HGL to use for starting water surface elevation: ❑ Manhole/Junction to take analysis to: Return to Clayton McEaehern @ City of Springfield, email: cmceachern@spdngfiefd-or,gov, FAX: (541) 736-1021 COMPLETE STUDY ITEMS" • Based upon the information provided on the front ofthis sheet, thefollowing represents a minimum ofwhat is neededfor an application to be complete for submittal with respect to drainage, however, this list should not be used in her, of the Springfreld Development Code (SDC) or the City's Engineering Design Manual. Compliance with these requirements does not constitute site approval, Additional site specific information may be required. Note: Upon scoping sheet submittal, ensure completedform has been .signed in the space in below: Interim Design Standards/Water Quality (FASM Chapter 3 Req'd N/A ® All non -building rooflop (NBR) impervious surfaces shall be pre-treated (e.g. malf-chambered catchbasin wind filtration media) for smrmwater quality. Additionally, a minimum of 50% of the NER impervious surface shall be treated by vegetated methods. Where required, vegetative stormwater design shall be consistent with design standards (EDSPM Section 3.02), set forth in Chapter 2 of the Eugene Stomrwater Management Manual. For new NBR impervious area less than 15,000 square feet, a simplified design approach may be followed as specified by the Eugene Stumiwater Management Manual (Sec2.4.1). If a stormwater treatment swale is proposed, submit calculationslspecificalions for sizing, velocity, flow, side slopes, bottom slope, and most mix consistent with City of Springfield or Eugene's Stimmidater Management Manual. ® ❑ Water Quality calculations as required in Section 3.03.1 of the EDSPM. ® E] All building rooflop mounted equipment, or other fluid containing equipment located outside of the building, shall ® Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. A complete drainage study, as required in EDSPM Section 4.03.1, including a hydrological study reap. ® Calculations showing system capacity for a 2 -year storm event and overflow effects of 25 -year storm event. M F7 The time of concentration (Te) shall be determined using a 10 minute start time for developed basins. A downsneam drainage analysis as described in EDSPM Section 4.03A.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code (OPSC). ® Elevations of the HGL and flow lines for both city and private systems where applicable. ® Design of Storm Systems (EDSPM Section 4.04). Flow lines, slopes, rim elevations, pipe type and sizes clearly indicated on the plan set. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. [K Ej Manning's "n" values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to M F-] Existing and proposed contours, located at one foot interval. Include spot elevations and site grades showing how site drains. ® Private stormwater easements shall be clearly depicted on plaris when private stormwater flows from one property In another. ® F� Drywells shall not receive nmoff from any surface wio being treated by one or more BMPs, with the exception of residential building roofs (EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website, I flo (` d tatju_r,jLs writhe ' ham fm more information. ❑ Detention ponds shall be designed to limit runoff to pre -development rates for the 2 through 25 -year storm events. •This form shall be included as an attachment, inside the front cover, ofthe sta mwater study. P!lhfPORT4NT. ENGINEER P,I,EASE READ RELO u` As the engineer of record,1 hereby certify, the above required items are complete and included with the submitted stormwater study and plan set. Signature Date Form Version 5: lune 2015 Parr Lumber —Phase 2 Stormwater Drainage Report Prepared by: Harper Houf Peterson Righellis, Inc. Date: December 17, 2020 Job No: PAR -36 Permit No: xxxxxxxx Site Address: 1291 S A Street Springfield, Oregon 97477 Owner/Developer: Parr Lumber Designer's Certification and Statement I hereby certify that this Stormwater Drainage Report for Parr Lumber — Phase 2 has been prepared by me or under my supervision and meets minimum standards of the City of Springfield, City of Eugene Stormwater Manual (Chapter 2), and normal standards of engineering practice. I hereby acknowledge and agree that the jurisdiction does not and will not assume liability for the sufficiency, suitability, or performance of drainage facilities designed by me. 86,073 ¢ ', V 220<' , y �/ Y �oN E mmm: 12/31/2020 Parr Lumber— Phase 2 Stormwater Management Report December 2020 Table of Contents Project Introduction Existing Conditions Methodology Proposed Conditions Water Quality Downstream Analysis Water Quantity Conveyance Operations and Maintenance Conclusion Tables Table 1 — On -Site Basin Summary Table Table 2 — Water Quality Summary for Infiltration Rain Gardens Table 3 — Water Quality Summary Appendices Appendix A — Exhibits Vicinity Map Existing Basin Map Proposed Basin Map Assessor's Map Appendix B — Water Quality Infiltration Rain Garden Standard Detail Rain Garden Information Sheets Facility Sizing Spreadsheets Appendix C — Water Quantity Hydrographs Appendix D — Conveyance Conveyance Spreadsheet 1 1 1 1 2 2 2 3 3 3 Parr Lumber — Phase 2 Stormwater Management Report December 2020 Project Introduction Parr Lumber is proposing to construct one newwarehouse, one new lumber shed, and on new T - shed as part of the second phase of the redevelopment of their retail and lumber storage site. Additional improvements include construction of new asphalt pavement areas and installation of a fire hydrant to meet code requirements for the new structures. The project site is located at 1291 S A Street in Springfield, Oregon. (See Appendix A for Vicinity Map). The purpose of this drainage report is to present stormwater best management practices (BMP) for water quality treatment to be installed as part of this project, designed to comply with City of Springfield Engineering Design Standards & Procedures Manual dated December 2012 and the City of Eugene Stormwater Management Manual (Chapter 2). The stormwater improvements include construction of infiltration rain gardens to treat the site runoff and new stormwater piping to convey rain garden overflow off site. Existing Conditions The Parr Lumber site is located in Springfield city limits along S A Street. S A Street is an ODOT highway (OR126 Business) developed to urban arterial standards. The existing on-site conditions consist of a retail and lumber storage building, lumber T -sheds, an asphalt parking lot, and other asphalt paved areas for lumber storage. No stormwater treatment facilities exist on site. The majority of the runoff from the site is collected in catch basins and conveyed to a public 24" wood storm line. The remainder flows offsite, either to S A Street or to neighboring properties. Refer to Appendix A for Existing Basin Map. Methodology This site requires the engineerto perform a Mid -Level Stormwater Study based on the Stormwater Scoping Form. Hydrologic calculations are to be based on the Unit Hydrograph Method, using an SCS Type 1A Distribution. Rainfall intensity levels are shown in the Design Standards & Procedures Manual, Section 4.03.3. A 2 -year storm event frequency is to be used for runoff volumes up to 5 cfs. This will be used for Water Quantity purposes. Stormwater facilities will be designed to meet Water Quality requirements. Because the development area is over 15,000 sr, the Presumptive Approach will be used to size stormwater facilities, based on the City of Eugene facility sizing spreadsheet. Thewater quality design storm is 0.83 inches per 24-hour period. Proposed Conditions As noted previously, on-site improvements include a newwarehouse, newsheds, and asphalt pavement areas. (See Appendix A for Proposed Basin Map). Stormwater runoff management consists of two new infiltration rain gardens to meet current stormwater management water quality standards. Further, existing catch basins which will be impacted by this development will have Flogard inserts installed. Runoff from Basins P1 -P6 will remain unchanged after redevelopment. These basins include existing buildings, the parking lot, landscape frontage area, and other asphalt pavement areas. See Table 1 on the next page for the On -Site Basin Summary Table. Runoff from Basins P8 -P10 will be directed to new site infiltration raingardens. Downspouts from the newwarehouse building will either direct runoff to sheet flow at ground level or be piped directly to Rain Garden B. Runoff from the new sheds will sheet flow over the roof edge then surface flowto planters at ground level. This runoff will then sheet flowthrough concrete valley gutters and across asphalt pavement to each basins' respective rain garden. Overflow from the rain gardens will be piped to the existing site storm, which connects to an existing public 24" wood storm. 1 Parr Lumber — Phase 2 Stonnwater Management Report December 2020 Table 1 - On -Site Basin Summary Table 'Proposed basin P9/10 encompasses area of basins E9 & E10 Water Quality Per the City of Springfield requirements, all non -building rooftop areas shall be pretreated, with the additional requirement that 50% of non -building rooftop areas be treated by vegetative methods. This project aims to treat as much redeveloped area as possible by means of vegetated rain gardens, including new rooftop areas. Because all runoff sheet flows to the proposed rain gardens, no pretreatment will occur outside of the rain gardens. Basins 1-6 will not be affected by this redevelopment; therefore, no treatment is proposed for these basins. Basin 7will be affected, but the impervious area will be reduced; no treatment is proposed for this basin based on site constraints. Basins 8-10 will largely be redeveloped; each of these basins will routed to a new rain garden. See Table 2 below for a summary of the Rain Gardens. Basin 11 will be largely redeveloped but will not have any treatment due to site constraints and the reduction in impervious area. Table 2 — Water Qualitv Summary for Infiltration Rain Gardens Existing Condition Proposed Condition Basin Impervious Area ac Pervious Area ac Impervious Area ac Pervious Area ac 1-6 1.49 0.07 1.49 0.07 7 0.29 0.01 0.27 0.01 8 0.39 0 0.26 0.03 9 0.37 0 0.50' 0.04' 10 0.11 0.02 11 0.07 0.30 0.06 0.39 Total 2.72 0.40 2.56 0.55 'Proposed basin P9/10 encompasses area of basins E9 & E10 Water Quality Per the City of Springfield requirements, all non -building rooftop areas shall be pretreated, with the additional requirement that 50% of non -building rooftop areas be treated by vegetative methods. This project aims to treat as much redeveloped area as possible by means of vegetated rain gardens, including new rooftop areas. Because all runoff sheet flows to the proposed rain gardens, no pretreatment will occur outside of the rain gardens. Basins 1-6 will not be affected by this redevelopment; therefore, no treatment is proposed for these basins. Basin 7will be affected, but the impervious area will be reduced; no treatment is proposed for this basin based on site constraints. Basins 8-10 will largely be redeveloped; each of these basins will routed to a new rain garden. See Table 2 below for a summary of the Rain Gardens. Basin 11 will be largely redeveloped but will not have any treatment due to site constraints and the reduction in impervious area. Table 2 — Water Qualitv Summary for Infiltration Rain Gardens The proposed Rain Gardens are sized appropriately to treat the water quality rain event, based on the City of Eugene Facility Sizing spreadsheet. See Appendix B for more information. Downstream Analysis The conveyance system downstream ofthe sitewas not identified as needing further study through the Stormwater Management System Scope of Work. However, the post -development site runoff rate cannot exceed the pre -development site runoff rate. See Water Quantity section below. Water Quantity Per city staff, water quantity reduction will not be required for this project because the site has been historically impervious. As noted previously, one water quantity requirement is that the post - development site runoff cannot exceed the pre -development site runoff rate. Calculationswere ran using the unit hydrograph method to compare the existing site runoff to the proposed condition site runoff. See Table 3 for Water Quantity Summary Table on the following page, as well as Appendix C for the hydrograph data. Contributing Impervious Area Proposed Facility Pollution Reduction Facility Basin Bottom Are Standards Met? Rain Garden A P8 11,271 295 Yes Rain Garden B P9/10 21,645 625 Yes The proposed Rain Gardens are sized appropriately to treat the water quality rain event, based on the City of Eugene Facility Sizing spreadsheet. See Appendix B for more information. Downstream Analysis The conveyance system downstream ofthe sitewas not identified as needing further study through the Stormwater Management System Scope of Work. However, the post -development site runoff rate cannot exceed the pre -development site runoff rate. See Water Quantity section below. Water Quantity Per city staff, water quantity reduction will not be required for this project because the site has been historically impervious. As noted previously, one water quantity requirement is that the post - development site runoff cannot exceed the pre -development site runoff rate. Calculationswere ran using the unit hydrograph method to compare the existing site runoff to the proposed condition site runoff. See Table 3 for Water Quantity Summary Table on the following page, as well as Appendix C for the hydrograph data. Parr Lumber — Phase 2 Stonnwater Management Report December 2020 Table 3 —Water Quantity Summary Table Stone Event Exiting Site Runoff cfs Proposed Site Runoff cfs Proposed Site Runoff— Rain Garden Included cfs Flow Reduction? Water Quality 0.425 0.399 0.284 Yes 2- ear 2.283 2.252 Yes 25 -year 3.420 3.391 3.322 Yes The table above includes the proposed site runoff, which assumes bypassing of the rain gardens. The proposed site runoff with rain gardens included takes into account the flow reduction from infiltration and storage in the rain gardens. Regardless, the proposed site runoff is reduced in the proposed condition whether or not the rain garden benefits are accounted for. Conveyance Minor on-site conveyance systems are proposed. These improvements include outfall pipes from rain garden overflow drains and pipes connecting to the existing site storm system. Pipes have been sized appropriately to convey, at a minimum, the 25 -year storm event flow. See Appendix D for conveyance information. Operations and Maintenance Private Facility: Proposed rain gardens will treat the runoff from the majority of the redeveloped area of the private property. Existing catch basins impacted by this development will have pretreatment via Flogard insert filters. The developer, Parr Lumber, will be responsible for O&M of these private facilities and catch basin filters. All facilities shall be maintained per the separate O&M Plan. Also, refer to the City of Eugene Stormwater Management Manual for guidance. Conclusion The proposed stormwater management plan will achieve pollutant removal to the maximum extent practicable via rain gardens designed to target pollutants expected with a commercial development. The proposed facilities satisfy City of Springfield and City of Eugene water quality requirements. As designed, this project shall not create any adverse impacts to the downstream storm system. Parr Lumber — Phase 2 Stormwater Management Report APPENDIX A - EXHIBITS r 1 VICINITY MAP N.T.S. Harper Houf Peterson Righellis Inc. PARPAR-361R E V I S I O R S IMCEMER=IE V I S 1 O R S I MCEMER=I m5eaea6 s— suMm,�wJns�ow nam ymcf n�us� ... w noun VICINITY MAP PARR LUMBER - PHASE 2 SPRINGFIELD, OREGON EXISTING COLLECTION 1 POINT FOR BASIN E1 (ROADWAY GUTTER) EXISTING COLLECTION �I POINT FOR BASIN E2 (ASSUMED CONNECTION TO PUBLIC 24" WOOD STORM) EXISTING CATCH BASIN EXISTING COLLECTION POINT FOR BASINS E3 -E10 (ASSUMED ROUTING TO • PUBLIC 24" WOOD STORM) �, 1 50'ACCESS EASEMENT --L: I I I 1 1 1 T - EXISTING CATCH BASIN 67+00 wrIL Nd skim, Ni \s', BAM \ ASPHALT PAVEMENT 68+00 69+00 -70+00 i 128_RLc— — 1-1 — ` GRAVE 46— BASIN i --q—LI UNION PACIFICRAI(R04 ry yui R E V 1 5 1 0 R 5 CATCH BASIN EXISTING COLLECTION POINT FOR BASIN E11 (ROUGH DITCH LINE) o 1— Houf Peterson IMPERVIOUS AREA ROUTED TO Righellis Inc. R KKV NII Ns •vie E2 0 ac 0.12 ac Ex. Site Stm CELEMERAID ylvee v�ineeev.4www.Mn�mPfv. vvn��i� NOTES: SITE DOES NOT CONTAIN ENVIRONMENTALLY SENSITIVE AREAS. SITE DOES NOT LIE WITHIN 100 -YR FLOODPLAIN OF THE WILLAMETTE RIVER. BASIN PERVIOUS AREA IMPERVIOUS AREA ROUTED TO E1 0.07 ac 0.30 ac Ex. ROW E2 0 ac 0.12 ac Ex. Site Stm E3 0 ac 0.56 ac Ex. Site Stm E4 0 ac 0.21 ac Ex. Site Stm E5 0 ac 0.23 ac Ex. Site Stm E6 0 ac 0.07 ac Ex. Site Stm E7 0.01 ac 0.29 ac Ex. Site Stm E8 0 ac 0.39 ac Ex. Site Stm E9 0 ac 0.37 ac Ex. Site Stm E10 0.02 ac 0.11 ac Ex. Site Stm E11 0.30 ac 0.07 ac Ex. Ditch 0 30 60 120 SCALE: 1"= 60 ' EXI STI N G BASI N MAP PARR LUMBER - PHASE 2 SPRINGFIELD, OREGON vaaae EXISTING COLLECTION 1 POINT FOR BASIN P1 (ROADWAY GUTTER) EXISTING COLLECTION �I POINT FOR BASIN P2 (ASSUMED CONNECTION TO PUBLIC 24" WOOD STORM) EXISTING CATCH BASIN EXISTING COLLECTION POINT FOR BASINS P3 -P10 (ASSUMED ROUTING TO • PUBLIC 24" WOOD STORM) 50'ACCESS EASEMENT I I EX6"E =464236 I I RIM =468.62 6" IE CUT (N) =464.75 PROPOSED— RAIN ROPOSEDRAIN GARDEN A PROPOSED RAIN GARDEN - OVERFLOW DRAIN 67+0 68+00 69+00 70+00 TR (OR126_RI mi = —1 1 — SHED RIM = 467.59 6 IE =465.26 UNION PACIFIC RAILROAD z yew �y Q� N W PROPOSED— RAIN GARDEN B R E V 1 5 1 0 R 5 BUILDING !T4 IE=46733 i ww Q s'y¢ w RIM =488.95 6" IE MT (NO =465.& CATCH BASIN TRENCH DRAIN RIM = 464.33 EXISTING COLLECTION POINT FOR BASIN P11 (ROUGH DITCH LINE) p 1— Houf Peterson IMPERVIOUS AREA ROUTED TO P1 0.07 ac Righellis Inc. R 46a P� s PHAL L Ex. Site Stm LAN -Al . -MEMEN srM� ` P5 6 i EXISTING Ex. Site Stm 4 BUILDING BASIN ? P6 0 ac 4 I P7 0.01 ac \ BAM 468 BASIN 0.03 ac �\ \ f RIM=48].93 P6 F7 0.04 ac -\\ EXB"IE P11 0.39 ac 0.06 ac '64.36± I I \ +!ice o s> n o\ PROPOSED ASPHALT �� T -SHED -. PAVEMENT N f j SHED RIM = 467.59 6 IE =465.26 UNION PACIFIC RAILROAD z yew �y Q� N W PROPOSED— RAIN GARDEN B R E V 1 5 1 0 R 5 BUILDING !T4 IE=46733 i ww Q s'y¢ w RIM =488.95 6" IE MT (NO =465.& CATCH BASIN TRENCH DRAIN RIM = 464.33 EXISTING COLLECTION POINT FOR BASIN P11 (ROUGH DITCH LINE) p 1— Houf Peterson IMPERVIOUS AREA ROUTED TO P1 0.07 ac Righellis Inc. R P2 Ra - NII NI ...a Ex. Site Stm LAN -Al . X.EIRERbA vvn��i� Ex. Site Stm ylveevineeev.4www.Mn mPfv. NOTES: SITE DOES NOT CONTAIN ENVIRONMENTALLY SENSITIVE AREAS. SITE DOES NOT LIE WITHIN 100 -YR FLOODPLAIN OF THE WILLAMETTE RIVER. BASIN PERVIOUS AREA IMPERVIOUS AREA ROUTED TO P1 0.07 ac 0.30 ac Ex. ROW P2 0 ac 0.12 ac Ex. Site Stm P3 0 ac 0.56 ac Ex. Site Stm P4 0 ac 0.21 ac Ex. Site Stm P5 0 ac 0.23 ac Ex. Site Stm P6 0 ac 0.07 ac Ex. Site Stm P7 0.01 ac 0.27 ac Ex. Site Stm P6 0.03 ac 0.26 ac Rain Garden A P9110 0.04 ac 0.50 ac Rain Garden B P11 0.39 ac 0.06 ac Ex. Ditch 0 30 60 120 SCALE: 1"= 60 ' PROPOSED BASIN MAP PARR LUMBER - PHASE 2 SPRINGFIELD, OREGON vARae e 9 0 SEE MAP 17033542 FORASSESSMENTAND TAXATION ONLY 2100 0.17AC 1 i 2200 2300 0.17AC 2400 0A7AC 5200 N.E.1/4 S.E.1/4 SEC. 35 T.17S. R.3W. W.M. Lane County 1" = 100' MAP REVISIONS Oat&2011-L 174-CCNVERTWPTOG6 os2&201s-ILAT1a2-LLAaE ENTLa 8TLP 1T142015-ILAT1a2-AC CORTL80]]8TL0 01p7/2018-,OAT1a8-NTLWlOUTOFB 01 m12018-ILATIJ - LLARETN£w TL00]18TL91W 17033541 SPRINGFIELD LCATSKP - 2019-01-0] 0]51 DID �1YF9�\00 00 700 1.i180.1]AC 0.12AC.2AC 1i0% 014 4A1 0.25AC, - 1.000 0.91800AC 0.1]AC 0.1 AC gw ijI vv ®400 0.17AC Be-i -------J,' 201 5.78A C me5 i1 501 , 0.1 AC i 90.12 AC 9 e -6O { 500 i "A" STREET R I ir-------J 2500 80 2700 2800 2900 3000 3100 3200 3300 3400 im 3500 a I ' 0.17AC 0.12AC0.12AC 0.17AC 0.17AC 0.18AC 0.15AC 0.1 AC 0.24 AC 0.29 AC 3600 3700 , \\ 0.15 AC 0.21 AC I 8 g I 5000 4900 4800 4700 i as w� ' I -------- mu i ws.aa 0 28 AC o.24 AC 02BAC i q;; 4500 4400 4300 4200 i 4'i�9 03 4000 I 3800 2 ' i 023 AC 022 AC 0.58 AC \� j 1- ' iw $ $ 0.o3Ac 4� 100 202 0.94 AC F ' ffi rtt i i ��� 3900 +.m. 4600 0.25 AC , X19, +. 80.24 ACI I € 8 0 21, k�t� .1tt>lttt'ttstfttttktt SEE MAP 17033623 s.ma MAIN STREEiT W .39 5300 i 5400 5700 5800 5900 y lse ac � 0.29 ac 8801 7100 7200 73007400 7800 , 8200 8400 8500 8600 -------------- ^ ' 0.3 AC 9000 81 �' 8700 I O.W AC 6100 6000 \ 6200 ,. 7400 , ` oWAC 5800 a 6800 « i ®'m >s' m �5500 0.51 AC a si ,,,,, ' 9100 1� wEs.nv j 0.14AC ., ma 7601 7900 i 6300 6603 8802 0.52AC 0.52 AC 8100 i 0.14 AC 0.22AC 1 I w PCL.1l 4T 1 b i 6301 6400 7500 i 00,13Ac s �;�\SEE MAP F 17033632 to , 6500 6804 CANCELLED R 131 12 rva,°uoo-w, m PCLA2 i usT 1r i 3501 '�'-�'>'>•-y ''kLB: .__ _ �"' L_______ w 1 00 va-u'E ,°h. y�yyyyy'�'�y �a'a-iayaw>;�>•- 11tI°y'yySr--t-p SY "+'°' ' ``ll 4100 6601 NK, 7OUTH 8098 600R 8099 aa> - SS 8000 01 8800 6900 8.62 AC - 8' _ �'- ' a 8 ' 200 1 ,SSE YS'SP 7: --y I az°�,'«' 1 w7w i az,.e«' 7800 7700 2299 019-99 5700 «,w�----- -- 0 8300 ��,� 3 __+._.___-_____ 300 '�'dxc A R'LCB°__+�eea 5700 F� 1 8900 aT 217 0.53 AC LC �J1 9200 2.61 AC _ SEE MAP - --- SEE MAP 17033531 - 17033600 SEE MAP 17033500 nav, SPRINGFIELD I 17033541 Parr Lumber — Phase 2 Stormwater Management Report APPENDIX B - WATER QUALITY r >IRE SK Dfl GBIOB WIS fIX 3:1 W. Z R Y . �J INNING(IDESLP ML BOiDa 'AfLY� tIflIB /� GPJWNG lI N II i sy %: 1 DRMN ROCK NEit rg11C ..-T.-.T- hIID'x i0 OPPRfJ.IDIXISTNC SUBCRAOE )i miff 1 1. Provide protection from all vehicle traffic, equipment staging, and bot traffic in proposed infiltration areas priorlo, during, and after construction. 2. Dimensions: a. Depth of rain garden: 6" minimum and 17 maximum b. Flat bottom width: 2' min. c. Side slopes of Rain Garden: 3:1 maou num. 3. Setbacks: a. Infiltration rain gardens must be 1 I from foundations and 5' ftom property lines. Filtration Rain Garden do not require a setback with an approved waterproof liner. 4. Overlow: a. Overflows are required unless sized to fully infiltrate the flood control design storm. b. Inlet elevation must Alm for 2" of freeboard, minimum. 5. Piping: Minimum 3" pipe required for up to 1,5DD sq fl of impervious area, otherwise F min. Piping material, slopes and installation shal blow the Unflarm Plumbing Code, 6. Growing medium: a.12" minimum b. Imported topsoil or amended native topsoil. Vegetation: Folowlandscape plans otherwise refer to plant list in SIMAMAppendi F. Number of plantings per 1DDsf offacility area: a.1DD Ground Covers, OR b. 8D Ground Covers, 2 Large Shrubs 4 Small Shrubs and 1 tress (deciduous or evergreen) 11). Install washed pea gravel or river rock to transition from inlets and splash pad to growing medium. CITY OF INFILTRATION RAIN GARDENscn�E "Nis EUGENE, OREGON DRnuN err sNG 2 DEPARTMENT OF PUBLIC WORKS TYPICAL DETAILS ENGINEERNG DIVISIDN 2.3.9 Rain Garden Facility Description Rain Gardens are vegetated, flat bottomed, Rain Gar shallow landscape depressions used to collect and hold stormwater runoff. This allows pollutants to settle and filter out as water infiltrates into the ground. Rain gardens are water reservoirs to collect and treat stormwater runoff by allowing the pollutants to settle and filter out as the water percolates through vegetation and soil mediums before infiltrating into the ground below or being piped to its downstream destination. Rain gardens can also be sized to infiltrate the flood control design storm and are often used as complete on-site systems. Rain gardens can be configured in a number of different shapes making them very versatile for integrating into site and landscape plans Rain Gardens can be used to help fulfill a site's required landscaping area requirement and should be integrated into the overall site design. Numerous design variations of shape and planting scheme can be used to fit the character of a site. Rain Gardens qualify as infiltration and filtration facilities. Rain Gardens meet the stormwater management standards for water quality and flow control when designed under the Simplified Approach. Rain Gardens meet the stormwater management standards for water quality, flow control and flood control when designed under the Presumptive Approach. Design Requirements All facilities shall require an overflow to an approved discharge point unless sized to fully infiltrate the flood control storm Sizing, The Simplified Approach may be utilized for surface areas less than 15,000 square - feet of impervious area. Rain Gardens shall use a sizing factor of 0.05 for water quality using the Simplified Approach. Rain Gardens shall use a sizing factor of 0.11 for flow control with the Simplified Approach. Stormwater Management Manual 2-25 Eugene 2014 The Presumptive Approach shall be used for all other water quality, flow control and flood control designs in conjunction with a measured infiltration rate. Rain gardens shall be designed to pond water for less than 30 hours after each storm event. Soil Suitability: Soils with infiltration rates greater than 2 in/hr shall be designed as infiltration treatment facilities. Soils with infiltration rates less than 2 in/hr shall be designed as filtration facilities. Dimensions and Slopes: The facility storage depth must be at least 6 inches, unless the rain garden is horizontally sized larger than required. The facility storage depth shall be no more than 12 inches. Side slopes shall be a maximum of 3:1. The minimum bottom width shall be 2 feet. The bottom shall have no more than 0.5% slopes. Setbacks: Rain Gardens located within 10 -feet of building structures or 5 feet of property lines must be lined with an impermeable waterproof liner. Materials Pining: Pipes shall be sized to convey design flow rates but shall be no less than 3 inches for private piping. Private piping shall conform to the requirement of the Uniform Plumbing Code. Sizing of public conveyance piping shall conform to the Public Improvement Design Standards Manual. Drain Rock: Drain rock may be used below the growing medium of a Rain Garden. Drain rock can be used for retention, detention or conveyance. Drain rock shall be open graded, washed 3/4 inch to 2-1/2 inch diameter. Drain rock and growing medium must be separated by a geotextile. Mulch: Washed pea gravel, river run rock or other non -floating mulch is recommended for Rain Gardens. It should be applied 2 - 3 inches thick to cover all solid areas between plants. It should not be over applied. Waterproof Liners: The use of waterproof liners is discouraged as infiltration is encouraged on all facility types. Waterproofing liners may be required in areas where hydraulic isolation is required due to existing structural, hydrologic or geotechnical limitations. Rain Gardens located within 10 feet of building foundations or 5 feet of property lines must be lined with an impermeable membrane of 30 mil (minimum) plastic film or equivalent. Vegetation The entire Rain Garden must maintain 90 percent coverage for vegetation. Vegetation shall conform to the facility planting list located in Appendix D. Stormwater Management Manual 2-26 Eugene 2014 Vegetated Rain Gardens shall be planted with minimum plant quantities from Schemes I, II or III. Minimum plant quantities for vegetated Rain Gardens are as follows: Vegetated Rain Garden Planting Scheme I II III Ground Cover, 4 -inch pots spaced 1' on center (per 100 80 80 100 square feet of the facffit Large Shrubs, 3 gal. pots spaced 4' on center (per 2 2 100 square feet of the facffit Small Shrubs, 1 gal. pots spaced 2' on center (per 4 4 100 square feet of the facffit Evergreen tree, min. 6' height (per 200 square feet 1 of the facility) Deciduous tree, 1-1h inch caliper (per 200 square 1 feet of the facility) Rain Gardens may elect to use grasses for side slopes. Grasses on side slopes must have 100 percent coverage at establishment by native grasses, turf grasses, native wildflower blends, native ground covers, or any combination thereof Seed shall be applied at the rates specified by the supplier. Vegetation or seed cover shall be established as soon as possible after the Rain Garden is completed, and before water is allowed to enter the facility. Unless vegetation or seed cover is established, biodegradable erosion control matting shall be installed in the flow area of the Swale before allowing water to flow through the Swale. Growine Medium: The growing medium shall be a minimum 12 inches of topsoil or the soil shall be amended to support plant growth. Imported topsoil shall be a sandy loam mixed with compost or a sand/soil/compost blend. It shall be roughly one-third compost by volume, free -draining, and support plant growth. The compost shall be derived from plant material; animal waste is not allowed. In all cases, the growing medium shall be 12 inches deep. Stormwater Management Manual 2-27 Eugene 2014 Stormwater Surface Filtration/Infiltration Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type 1A Rainfall Distribution City of Eugene Name: Pan Lumber -Phase 2 Date: 16 -Dec -20 Address: 1291 SA&rest Permit Number: rPermitM Total Square Footage of Drainage Area= Sodnafield, OR 97477 CatchmentID: Basin P8 :r: Kelly Ota PE W Hamer Hoof Peterson Riohellis Time of Concentration Pre -Development= 10min Soil Data Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach. Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate calculations with the facility. The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF) For infiltration facilities in Class A or B soils where no infiltration testing has been perfromed use an infiltration rate d0.5 in/hr. For all facilities use a maximum scil infiltration rate of 2.5 in/hr for topsoil/growing medium. noose' yes" from the dmpdowm boxes below next to the design standards requirements for Ihis facility. Pollution Reduction (PR( es Flow Control (FC)i No Destination(DT) No •An nmramrfteonrymusn beck—a,mehminynypeo meetdsmamn«yw«mem: Total Square Footage Impervious Area= 11271 sou Total Square Footage Pervious Area= 1431 sgfi Impervious Area CN=l 98 Flan Control Pervious Area CN=l 85 Total Square Footage of Drainage Area= 12102 sfi Time of Concentration Post Development - min Weighted Average CN= 9T Site Data -Pre Development (Data in this section is only used if Flow Control is required) Pre -Development CN= 85 Time of Concentration Pre -Development= 10min Soil Data Tested Soil Infiltration Rate- in/Iv(S-Nae4) Destination Design=—imhr Design Soil Infiltration R&e=l 2.5 infitr Soil Infiltration Rate R uiremen[ Rainfall De th Desi n Storm Pdlulion Reit 1.4 intoes Water Cosily Flan Control 3.6 inches I Flood Control Destination I 3.6 inches I Flood Control Facility Facility Side Slope Max. Ponding Depth in Stormwater Facility - Depth of Growing Medium (So 12/1]2020.]:21 AM Facility Surface Facility Surface Perin Facility Bottom Basin V. Ratio of Facility Area to Impervious Pollution Reduction-Calculadon Results Peak Flow Rare to Stonnwarer Facility= DD87 ds Peak Facility Overflow Rate= D.DDD ds Total Runoff Volume to 5[onnwarer Facility a1104 d Total Overflow Volume= D d Max. Depth of Stormvater in Facility= 5.1 in Drawdown Time= 0.2 hours Yes Facility Sizing Meets Pollution Reduction Standards? VE3 Meets Requirement of No Facility Flooding? VE3 Meets Requirement for Maximum of 18 Hour Drawdown Time? Flow Control -Calculation Results Peak Flow Rare to Stormwarer Facility= 0.266 cfs Peak Facility Overflow Rare= 0.242 cfs Total Runoff Volume to Sorin at Facility a 3382 d Total Overflow Volume= 1371 of Peak Offsite Flow Rare Max. Depth of Stormuater in Facility= 6.0 in Filtration Facility Undercirairn MA ors Drawdown Time= 2.3 hours Pre -Development Runoff Dare Peak Flow Rare a 0.152 dis Total Runoff Volume =1 2227 d N77 Facility Sizing Meets Flow Control Standards? NSA Meets Requirement for Post Development offsite flow less or equal to Pre -Development Flow? NW Meets Requirement for Maximum of 1B Hour Drawdown Time? Destination-Calculadon Results Peak Flow Rareto Stormwarer Facility= tls Peak Facility Overflow Rare= N/Ads Total Runoff Volume to Sorin at Facility a cf Total Over Volume= N/A d Max. Depth of Stormeater in Facility= in Drawdown Time= hours —Facility Sizing Meets Destination Standards? -Meets Requirement of No Facility Flooding? Meets Requirement for Maximum of 30 hour Drawdown Time? I I d i WI0v- K- l%Aki L1 M hgatl Nam: Far Lunbr-Fhw2 PomYNmbr: IFnnll/n cxm.nio: amova oryr� hn: vtluam awumm Runoff Time (min) Flow Control Xydrograph 0018 0.0800 0.014 0.012 0.0800 0.0400 0.0200 0.0000 0.0200 s s s Time (min) Flow Control Xydrograph 0018 0016 0.014 0.012 0.010 °+°°' '8°"ry°b'yAe"P° nme)Mn) —Design Slam Runoff —Facility Inflflnticn Runoff Inflow- Outflow Stormwater Surface Filtration/Infiltration Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type 1A Rainfall Distribution City of Eugene Name: Pan Lumber -Phase 2 Date: 16 -Dec -20 Address: 1291 SA&rest Permit Number: rPermitM Total Square Footage of Drainage Area= Sodnafield, OR 97477 CatchmentID: Basin P9/10 :r: Kelly Ota PE W Hamer Hoof Peterson Riohellis Time of Concentration Pre -Development= 10min Soil Data Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach. Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate calculations with the facility. The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF) For infiltration facilities in Class A or B soils where no infiltration testing has been perfromed use an infiltration rate d0.5 in/hr. For all facilities use a maximum scil infiltration rate of 2.5 in/hr for topsoil/growing medium. noose' yes" from the dmpdowm boxes below next to the design standards requirements for Ihis facility. Pollution Reduction (PR( es Flow Control (FC)i No Destination(DT) No•An nRnMxnmnrymustbech— a,mehminynypeo meetdsmamn«yw«mem: Total Square Footage Impervious Area= 21645 sou Total Square Footage Pervious Area= 1858 sgfi Impervious Area CN=l 98 Flan Control Pervious Area CN=l 85 Total Square Footage of Drainage Area= 23503 sfi Time of Concentration Post Development - min Weighted Average CN= 9T Site Data -Pre Development (Data in this section is only used if Flow Control is required) Pre -Development CN= 85 Time of Concentration Pre -Development= 10min Soil Data Tested Soil Infiltration Rate- in/Iv(S-Nae4) Destination Design=—imhr Design Soil Infiltration R&e=l 2.5 inmr Soil Infiltration Rate R uiremen[ Rainfall De th Desi n Storm Pdlulion Reit 1.4 intoes Water Cosily Flan Control 3.6 inches I Flood Control Destination I 3.6 inches I Flood Control Facility Facility Side Slope Max. Ponding Depth in Stormwater Facility - Depth of Growing Medium (So 12/1]2020.]:23 AM Facility Surface Facility Surface Perin Facility Bottom Basin V. Ratio of Facility Area to Impervious Pollution Reduction -Calculation Results Peak Flow Rare to Stonowarer Facility= DA68 ds Peak Facility Overflow Rate= D.DDD ds Total Runoff Volume to 5[onnwarer Facility a 2110 d Total Overflow Volume= D d Max. Depth of Stormvater in Facility= 4.? in Drawdown Time= 0.2 hours Yes Facility Sizing Meets Pollution Reduction Standards? VES Meets Requirement of No Facility Flooding? VES Meets Requirement for Maximum of 18 Hour Drawdown Time? Flow Control -Calculation Results Peak Flow Rare to Stormwarer Facility=Hds Peak Facility Overflow Rare= 0.452 ds Total Runoff Volume to S[ormwat Facility ad Total Overflow Volume= 2440 d Peak Offsite Flow Rare Max. Depth of Stormuater in Facility=in Filtration Facility Undercirairn MA ds Drawdown Time=hours Pre -Development Runoff Dare Peak Flow Rare= 0.281 ds Total Runoff Volume =1 4120 d N77 Facility Sizing Meets Flow Control Standards? MA Meets Requirement for Post Development offsite Flow less or equal to Pre -Development Flow? NW Meets Requirement for Maximum of 1B Hour Drawdown Time? Destination -Calculation Results Peak Flow Rareto Stormwarer Facility= tls Peak Facility Overflow Rare= NIA ds Total Runoff Volume to S[ormwat Facility a d Total Over Volume= N/A d Max. Depth of Stormwater in Facility= in Drawdown Time= hours —Facility Sizing Meets Destination Standards? -Meets Requirement of No Facility Flooding? Meets Requirement for Maximum of 30 hour Drawdown Time? 12/17/2020-7:23AM hgatl Nam: Far Lunbr-FM1w2 PomalNmaar: IFrma/n CaeNmn110: amnMIO . orlp� hn: vtluam awumm _ 02000 0.1500 0.1000 0.0500 0.0000 u -0.0500 Runoff Time (min) —Desgn Sloan Runoff —FacilityInfiflnlim Runoff Inflow- Outflow Flow Control Xydrograph o.oao o.M o.mo 0.025 0'M —Pr DO Wmml ftn`n —Fwlily Ow FI wMtfo 2 —Ttlal P�-Oe Wmml oT le acw 0.015 0.010 O.WS 1717 0..., -1 q�gAp A.9 TImeIMn) Parr Lumber — Phase 2 Stormwater Management Report APPENDIX C - WATER QUANTITY r Hydraflow Table of Contents PAR36-ate easbns.gpw HydraMwHydrographs 15rtension for AutcdesW Civil 3M by Autodesk, Inc. J2020 W Jrresday, 09/9/2020 1 -Year SummaryReport ......................................................................................................................... 1 HydrographReports................................................................................................................... 2 Hydrograph No. 1, SBUH Runoff, Basin E1/P1........................................................................ 2 Hydrograph No. 2, SBUH Runoff, Basin E2/P2........................................................................ 3 Hydrograph No. 3, SBUH Runoff, Basin E3/P3........................................................................ 4 Hydrograph No. 4, SBUH Runoff, Basin E4/P4........................................................................ 5 Hydrograph No. 5, SBUH Runoff, Basin E5/P5........................................................................ 6 Hydrograph No. 6, SBUH Runoff, Basin E6/P6........................................................................ 7 Hydrograph No. 7, Combine, Unaffected Basins..................................................................... 8 Hydrograph No. 9, SBUH Runoff, Basin E7............................................................................. 9 Hydrograph No. 10, SBUH Runoff, Basin E8......................................................................... 10 Hydrograph No. 11, SBUH Runoff, Basin E9......................................................................... 11 Hydrograph No. 12, SBUH Runoff, Basin E10....................................................................... 12 Hydrograph No. 13, SBUH Runoff, Basin E11....................................................................... 13 Hydrograph No. 14, Combine, Ex. Affected Basins................................................................ 14 Hydrograph No. 15, Combine, Ex. Site.................................................................................. 15 Hydrograph No. 17, SBUH Runoff, Basin P7......................................................................... 16 Hydrograph No. 18, SBUH Runoff, Basin P8......................................................................... 17 Hydrograph No. 19, SBUH Runoff, Basin P9/10.................................................................... 18 Hydrograph No. 20, SBUH Runoff, Basin P11....................................................................... 19 Hydrograph No. 21, Combine, Pr. Affected Basins............................................................... 20 Hydrograph No. 22, Combine, Pr. Site................................................................................... 21 2 -Year SummaryReport ....................................................................................................................... 22 HydrographReports................................................................................................................. 23 Hydrograph No. 1, SBUH Runoff, Basin E1/P1...................................................................... 23 Hydrograph No. 2, SBUH Runoff, Basin E2/P2...................................................................... 24 Hydrograph No. 3, SBUH Runoff, Basin E3/P3...................................................................... 25 Hydrograph No. 4, SBUH Runoff, Basin E4/P4...................................................................... 26 Hydrograph No. 5, SBUH Runoff, Basin E5/P5...................................................................... 27 Hydrograph No. 6, SBUH Runoff, Basin E6/P6...................................................................... 28 Hydrograph No. 7, Combine, Unaffected Basins................................................................... 29 Hydrograph No. 9, SBUH Runoff, Basin E7........................................................................... 30 Hydrograph No. 10, SBUH Runoff, Basin E8......................................................................... 31 Hydrograph No. 11, SBUH Runoff, Basin E9......................................................................... 32 Hydrograph No. 12, SBUH Runoff, Basin E10....................................................................... 33 Hydrograph No. 13, SBUH Runoff, Basin E11....................................................................... 34 Hydrograph No. 14, Combine, Ex. Affected Basins................................................................ 35 Hydrograph No. 15, Combine, Ex. Site.................................................................................. 36 Hydrograph No. 17, SBUH Runoff, Basin P7......................................................................... 37 Hydrograph No. 18, SBUH Runoff, Basin P8......................................................................... 38 Hydrograph No. 19, SBUH Runoff, Basin P9/10.................................................................... 39 Hydrograph No. 20, SBUH Runoff, Basin P11....................................................................... 40 Hydrograph No. 21, Combine, Pr. Affected Basins............................................................... 41 Hydrograph No. 22, Combine, Pr. Site................................................................................... 42 25 - Year Contents continued... PAR36-ate Msins.gpw SummaryReport ....................................................................................................................... 43 HydrographReports................................................................................................................. 44 Hydrograph No. 1, SBUH Runoff, Basin E1/P1...................................................................... 44 Hydrograph No. 2, SBUH Runoff, Basin E2/P2...................................................................... 45 Hydrograph No. 3, SBUH Runoff, Basin E3/P3...................................................................... 46 Hydrograph No. 4, SBUH Runoff, Basin E4/P4...................................................................... 47 Hydrograph No. 5, SBUH Runoff, Basin E5/P5...................................................................... 48 Hydrograph No. 6, SBUH Runoff, Basin E6/P6...................................................................... 49 Hydrograph No. 7, Combine, Unaffected Basins................................................................... 50 Hydrograph No. 9, SBUH Runoff, Basin E7........................................................................... 51 Hydrograph No. 10, SBUH Runoff, Basin E8......................................................................... 52 Hydrograph No. 11, SBUH Runoff, Basin E9......................................................................... 53 Hydrograph No. 12, SBUH Runoff, Basin E10....................................................................... 54 Hydrograph No. 13, SBUH Runoff, Basin E11....................................................................... 55 Hydrograph No. 14, Combine, Ex. Affected Basins................................................................ 56 Hydrograph No. 15, Combine, Ex. Site.................................................................................. 57 Hydrograph No. 17, SBUH Runoff, Basin P7......................................................................... 58 Hydrograph No. 18, SBUH Runoff, Basin P8......................................................................... 59 Hydrograph No. 19, SBUH Runoff, Basin P9/10.................................................................... 60 Hydrograph No. 20, SBUH Runoff, Basin P11....................................................................... 61 Hydrograph No. 21, Combine, Pr. Affected Basins............................................................... 62 Hydrograph No. 22, Combine, Pr. Site................................................................................... 63 Hydrograph Summary Report Hytlraitow Hytlrographs Extension for Autodesk® Civil 3M by Aulotlesic, Inc. J2020 Hyd M. Hytrograph M. (origin) Peak flow (o ) Time interval (mm) Ti me to Peak (min) Hyd. volume (—ft) Inflow hyrl(s) Maadmum d..Uen (ft) Tolal sang. useri (cult) Hytlmgraph Besariplion 1 SBUH Runoff 0.043 2 478 644 ---- --- --- Basin E1/P1 2 SBUH Runoff 0.019 2 476 273 ---- --- --- Basin E2/P2 3 SBUH Runoff 0.091 2 476 1,275 ---- --- --- Basin E3F3 4 SBUH Runoff 0.034 2 476 478 ---- --- --- Basin EVP4 5 SBUH Runoff 0.037 2 476 524 ---- --- --- Basin EaP5 6 SBUH Runoff 0.011 2 476 159 ---- --- --- Basin E6/P6 7 Combine 0238 2 476 3,352 1, 2, 3, --- --- Unaffected Basins 4, 5, 6 9 SBUH Runoff 0.049 2 476 683 ---- --- --- Basin E7 10 SBUH Runoff 0.063 2 476 888 ---- --- --- Basin E8 11 SBUH Runoff 0.060 2 476 842 ---- --- --- Basin E9 12 SBUH Runoff 0.015 2 478 me ---- --- --- Basin E10 13 SBUH Runoff 0.003 2 524 187 ---- --- --- Basin Ell 14 Combine 0.189 2 476 2,826 9, 10, 11, --- --- Ex. Affected Basins 12,13 15 Combine 0.425 2 476 6,178 7,14 --- --- Ex. Site 17 SBUH Runoff 0.045 2 476 837 ---- --- --- Basin P7 18 SBUH Runoff 0.040 2 476 577 ---- --- --- Basin P8 19 SBUH Runoff 0.075 2 476 1,073 ---- --- --- Basin P9/10 20 SBUH Runoff 0.004 2 524 228 ---- --- --- Basin Pll 21 Combine 0.163 2 478 2,515 17,18,19, --- --- Pr. Affectetl Basins 20 22 Combine 0.399 2 476 5,867 7,21 --- --- Pr. ate PAR36- Site Basins.gpw Return Period: 1 Year Wednesday, 0919 12020 I Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 3M by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 1 Basin E1/P1 Hydrograph type = SBUH Runoff Peak discharge = 0.043 cfs Storm frequency = 1 yrs Time to peak = 478 min Time interval = 2 min Hyd. volume = 644 cult Drainage area = 0.370 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.300 x 03)+ (0.0]0 x 33)] / 0.370 Basin E1/P1 1 0 01 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 I Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 2 Basin E2/P2 Hydrograph type = SBUH Runoff Peak discharge = 0.019 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 273 cult Drainage area = 0.120 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0420 x 88)] / 0420 Basin E2/P2 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 4 Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 3 Basin E3/P3 Hydrograph type = SBUH Runoff Peak discharge = 0.091 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 1,275 cult Drainage area = 0.560 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.580 x 98)] / 0580 Basin E3/P3 Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r• Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�ltltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r• Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltl�i�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt�Ittltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt�tlltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt��Iltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r; Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt��lltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r. Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��Iltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� �����I�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl���� ���� � 11111111111�11�1�1�1�1���� 001ltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl� Mi Iltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl�Mi �Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��illtltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r, Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt��i �Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r, Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt��I ltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� n Iltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r M1��������� r r MM E MIltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii���iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiii►���iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiii� Iltltltltltltl�lltltltltltltl�lltltltltltl��lltltltltltltl�lltltltltltltl�r-�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltlt��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltit�� �Iltltltltltltl�lltltltltltltl�lltltltltltltl� 001- r r 000 � 0.00 r_r 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 4 Basin E4/P4 Hydrograph type = SBUH Runoff Peak discharge = 0.034 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 478 cult Drainage area = 0.210 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.210 x 88)] / 0.210 Basin E41P4 0.10 0.10 I I �iiiiiiiiiiiiiiiiii��iiiiiiiiiiiiiiiiii��iiiiiiiiiiiiiiiiii��iiiiii����iiiiiiiiiiiii�►- r_III 7=7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 I Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 5 Basin E5/P5 Hydrograph type = SBUH Runoff Peak discharge = 0.037 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 524 cult Drainage area = 0.230 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.230 x 98)] 10.2M Basin E51P5 ���w�lltltltltlr��lltltltlt�lltltltlt�lltltltlt�lltltltlt�lltltltlt�lltltltlt�lltltltlt� ��� �I�Iltltltltltltl�rttt����r�lltltltltltltl�ltttttttttt���� ���ilrttttttttt�l�l�l�r_���r-� 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1 u Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 6 Basin E6/P6 Hydrograph type = SBUH Runoff Peak discharge = 0.011 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 159 cult Drainage area = 0.070 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.0]0 x 98)] / 0.0]0 Basin E61P6 Itttttttttt� ltttttttttt� l� l� � r.� ltttttttttt� ltttttttttt� ltttttttttt� ltt� ltttttttttt� ltttttttttt� ltttttttttt� ltttttttttt� Iltitititit�l�litiiiiittttl♦t��_II`�tr��lititititit�ll♦IIIliiiiiiii�liiiiiiiiii�liiiiiiiiii�l� 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 I Hydrograph Report HydraMwHydroraphs F ension for AutocsW civil 3M by Autodesk, Inc. 0I= W ne ay, 09/9/2020 Hyd. No. 7 Unaffected Basins Hydrograph type = Combine Peak discharge = 0.236 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 3,352 cult Inflow hyds. = 1, 2, 3, 4, 5, 6 Contrib. drain. area = 1.560 ac Unaffected Basins 2I21 �Irttttt(♦f/�I��� �, �_ �I�Iltll��ttttttttttttt��—� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 I Hydrograph Report HydraMwHydroraphs F ension for Autcdcsb® Civil 3M by Autotlesk, Inc. 0 I= Wdresday, 09/9/21M Hyd. No. 9 Basin E7 Hydrograph type = SBUH Runoff Peak discharge = 0.049 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 683 cult Drainage area = 0.300 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Ti = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Composite (Area/Cl =1(0.280 x W) ♦ (0.010 x 85)] / 0.300 Basin E7 of ���� ala.�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll� II111111111111�11111111111111�11111111111111�11111111��111��11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111� II111111111111�11111111111111�11111111111111�1111111��11111��11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111�11111111111111� fill��I��f♦f♦f♦f♦f♦f♦�� f♦ 11 111 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 10 Hydrograph Report HydraMwHydrographs Eatenswn fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 10 Basin E8 Hydrograph type = SBUH Runoff Peak discharge = 0.063 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 888 cult Drainage area = 0.390 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.390 x 98)] 10.390 Basin E8 MI OR 11 No ME �—I���f♦f♦f♦f♦f♦f♦f♦VERNON 6 66 6 66 I I I .I :I .11 I :I •.I I:I 11 I I .I Hydrograph Report HydraMwHydrographs Eatenswn fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 11 Basin E9 Hydrograph type = SBUH Runoff Peak discharge = 0.060 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 842 cult Drainage area = 0.370 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposte (Area/CN) =1(0.370 x 98)] / 0.370 Basin E9 OR r r ����ME��������� r r Moo ��������� MR ���r��I`—�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0.01 aa0.01 Itttttttttrltttttttttrl��lltltl�l�l�l�l�l�llittrrraa�� �I� Itttttttttr l� �� l� ltttttttttrf♦ I� I� I� I� I� I� Ittttttrrra a. � I�Ittttttr/irtttttttttttt�l�l�l�l�l�l�l��ltttttttttr ttttttttttr. r r� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 12 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 12 Basin E10 Hydrograph type = SBUH Runoff Peak discharge = 0.015 cfs Storm frequency = 1 yrs Time to peak = 478 min Time interval = 2 min Hyd. volume = 226 cult Drainage area = 0.130 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.110 x 08)+ (0.020 x 85)] 10.1 M Basin E10 r r Iltltltltltltl�lltltltltltltl�lltltltltltltl�l��l�l�l�l�l�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� r r r rr 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 13 Hydrograph Report HydraBow Hydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 13 Basin E11 Hydrograph type = SBUH Runoff Peak discharge = 0.003 cfs Storm frequency = 1 yrs Time to peak = 524 min Time interval = 2 min Hyd. volume = 187 cult Drainage area = 0.370 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.070 x 98) ♦ (0.300 x 85)] / 0.370 Basin E11 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 14 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 14 Ex. Affected Basins Hydrograph type = Combine Peak discharge = 0.189 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 2,826 cult Inflow hyds. = 9, 10, 11, 12, 13 Contrib. drain. area = 1.560 ac Ex. Affected Basins r r A0 00 ML f �_0.00 0 240 360 •:r 600 720 :•r 960 1080 1200 1320 1440 1560 10 15 Hydrograph Report HydraMwHydrographs e4lension fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 15 Ex. Site Hydrograph type = Combine Peak discharge = 0.425 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 6,178 cult Inflow hyds. = 7, 14 Contrib. drain. area = 0.000 ac Fac. Site MENOMINEE IltltltltINEElltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� IltltltltINEElltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� I l t l t l t l t NOMINEE NEEJI NOMINEE I ���� 111111111111�1�I�I�I�I�It111111111�11111111111�11111111111� MINEEIN liiiiiiiiii�liiiiiiiiii�liiiiiii� ����■Itltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� MItitititit�ttttttttttttt�l�l�l�l�liiiiiiiiii�liiiiiiiiii�liiiiiiiiii� 6 �I Itttttttt�tltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltt�ltttttttttt�ltttttttttt�ltttttttttt� I1It 6 6 IM M=��lltltltltltltl�lltltltltINEElltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� ���V=Mon M\111111 MEMNON I I �I .I �:I .11 I :�I •.I I:I 11 I ��I .I I Hydrograph Report HydraMwHydrographs Falension fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 21M Hyd. No. 17 Basin P7 Hydrograph type = SBUH Runoff Peak discharge = 0.045 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 637 cult Drainage area = 0.280 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.2]0 x 08) ♦ (0.010 x 85)] 10.2W Basin P7 MI 0.01 ��� rt���tta��tr�t�l������� 0.01 Ittttttttttt�ltttt(_f/�I�I�I�I�I�IIltttttrrrraa77=---�� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 17 Hydrograph Report HydraMwHydrographs Fatension fa Auto csk® Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 18 Basin P8 Hydrograph type = SBUH Runoff Peak discharge = 0.040 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 577 cult Drainage area = 0.290 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.280 x W) ♦ (0.030 x 85)] / 0.280 Basin P8 MR ������I\��Illl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 18 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 19 Basin P9/10 Hydrograph type = SBUH Runoff Peak discharge = 0.075 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 1,073 cult Drainage area = 0.540 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.500 x 98) ♦ (OD40 x 85)] / 0.540 Basin P9/10 in mol ���w��� �wlltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�r�lltltltltltltl�lltltltltltltl�lltltltt�� ����� 000 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 19 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 20 Basin P11 Hydrograph type = SBUH Runoff Peak discharge = 0.004 cfs Storm frequency = 1 yrs Time to peak = 524 min Time interval = 2 min Hyd. volume = 228 cult Drainage area = 0.450 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.83 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a ` Canposite(Area/CN)=i(0.W x 98)+(0.390 x 85)]/ OA50 Basin P11 . 20 Itttttttttt� ltttttttttt� ltttttttttt� ltttttttttt� �.ltrr� � ttrr� l� ltttttttttt� trrrrr� � � 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 20 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 21 Pr. Affected Basins Hydrograph type = Combine Peak discharge = 0.163 cfs Storm frequency = 1 yrs Time to peak = 478 min Time interval = 2 min Hyd. volume = 2,515 cult Inflow hyds. = 17, 18, 19, 20 Contrib. drain. area = 1.560 ac Pr. Affected Basins Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt�r��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� ����r� r�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� I 120 240 360 4:I 600 720 :4I •.I 1080 1200 1320 1440 1560 20 21 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 21M Hyd. No. 22 Pr. Site Hydrograph type = Combine Peak discharge = 0.399 cfs Storm frequency = 1 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 5,867 cult Inflow hyds. = 7, 21 Contrib. drain. area = 0.000 ac Pr. Site OR Iltltltltltltl�lltltltltltltl�lltltltltltltl�rr,�\��Iltltltltltltl��� ������ Itttttttttt�lttttttllll��/.����_�����t��_ � Itititititt�ltttttr1111111���-1-1-1-1-Ittllllllll���- fttltltltttt� 111 tlllllllllll.li ���������1111111111 ��,� 111 1 II .I:I .11 1 I •.I I:I 11 11 .I 22 Hydrograph Summary Report Hytlraitow Hytlrographs Extension for Autodesk® Civil 304s by Aulotlesic, Inc. J2020 Hyd M. Hytrograph M. (ein9n) Paas flow (mss) T.ne inleraal (mi-) Ti me to Peak (min) Hyd. volume (—ft) Inflow hyoys) Maximum d..Uan (ft) Tole) sirs. useE (cult) Hytlmgraph Besesiplixn 1 SBUH Runoff 0271 2 474 3,825 ---- --- --- Basin ElRl 2 SBUH Runoff 0.092 2 474 1,336 ---- --- --- Basin E21P2 3 SBUH Runoff 0.432 2 474 6,235 ---- --- --- Basin E31P3 4 SBUH Runoff 0.162 2 474 2,338 ---- --- --- Basin E4R4 5 SBUH Runoff 0.171 2 474 2,561 ---- --- --- Basin EatP5 6 SBUH Runoff 0.054 2 474 T19 ---- --- --- Basin E&P6 7 Combine 1.188 2 474 17,074 1, 2, 3, --- --- Unaffected Basins 4, 5, 6 9 SBUH Runoff 0231 2 474 3,340 ---- --- --- Basin E7 10 SBUH Runoff 0.301 2 474 4,342 ---- --- --- Basin E8 11 SBUH Runoff 0285 2 474 4,119 ---- --- --- Basin E9 12 SBUH Runoff 0.095 2 474 1,344 ---- --- --- Basin E10 13 SBUH Runoff 0.184 2 478 2,691 ---- --- --- Basin Ell 14 Combine 1.095 2 474 15,837 9, 10, 11, --- --- Ex. Affected Basins 12,13 15 Combine 2283 2 474 32,910 7,14 --- --- Ex. Site 17 SBUH Runoff 0216 2 474 3,117 ---- --- --- Basin P7 18 SBUH Runoff 0219 2 474 3,112 ---- --- --- Basin P8 19 SBUH Runoff 0.407 2 474 5,794 ---- --- --- Basin PW10 20 SBUH Runoff 0224 2 478 3,273 ---- --- --- Basin Pll 21 Combine 1.063 2 474 15,296 17,18,19, --- --- Pr. Affected! Basins 20 22 Combine 2252 2 474 32,370 7,21 --- --- Pr. ate PAR36- Site Basins.gpw Return Period: 2 Year Wednesday, 0919 12020 23 Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 3M by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 1 Basin E1/P1 Hydrograph type = SBUH Runoff Peak discharge = 0.271 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,825 cult Drainage area = 0.370 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposte (Area/CN) =1(0.300 x 03)+ (0.0]0 x 33)] / 0.370 Basin E1/P1 MEMORIES!! I Mai tl 11111 00t MR 005 0.05 00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 24 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 2 Basin E2/P2 Hydrograph type = SBUH Runoff Peak discharge = 0.092 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 1,336 cult Drainage area = 0.120 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0420 x 88)] / 0420 Basin E2/132 I r r r MEMORIES MEMORIES REMEMER 6 S. SIEMENS SIEMENS I SIEMENS III r r: ISIEMENS IN SIEMENS ��������� r r. IRS MR SIEMENS � � � � la � lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw Iltltltltlw lltltltltlw lltltltltlw lltlw � ll� � lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw lltltltltlw SIEMENS SIE r r ��IIIIIIIIif♦f♦�f♦�f♦������� r r ��IIIItiI♦f♦ �� ��������� Iltlt MENSlltltltltlw��lltltltltlwlltltltltlwlltltltltltltt����lltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlw Iltltltltlw��lltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltltltl�lt��lltltltltlw IIS � Iltltttttw � litltltltlw lid l� l� l� ll� � � � r rr ��Iltltltltlwlltltltltltt�l�lltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltlt���1� r rr r r .r .r -:r .rr r :-r •.r r:r rr 25 Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 3 Basin E3/P3 Hydrograph type = SBUH Runoff Peak discharge = 0.432 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 6,235 cult Drainage area = 0.560 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.580 x 98)] / 0580 Basin E3/P3 Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � , Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � . Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltlllltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt�Illtltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� �.� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt�t��_Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� �,� �����t�l�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl���� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��Iltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��Iltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl�tltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl� M■1Iltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt�Ml ltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt��illtltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �i tltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �I Iltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� E I�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl���� ���� �t tttttttttt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltt���� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� mol Itltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� El Itltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �� Itltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt���ltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �� tltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �� Itltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �� �Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltl��a�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�r��lltltltlt��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�—Iltltltltltlr,�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltl� �Iltltltltltltl�l�l��_�_�_�_Iltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltttttttttt� ���t�i�t���iil��l�>_ f_i��l�l(_I�I�I�I�I��� tttttttttttr. f_���Irttttttttt�l�l�l�l�l�l��lrttttttttt� � �� ����Ittttttttttt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltlttttttt��lttttttttti��� � 66 r r -r .r -:r .rr r :-r •.r r:r rr r --r .r F Hydrograph Report Hydratlow Hydroraphs F ension for Autotl W Civil 308 by Autodesk, Inc. 0 I= W ne ay, 09/9/2020 Hyd. No. 4 Basin E4/P4 Hydrograph type = SBUH Runoff Peak discharge = 0.162 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 2,338 cult Drainage area = 0.210 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.210 x 88)] / 0.210 Basin E4/P4 0.50 0.50 ���Iltltltltltltlllltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Is Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��i ltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt��ltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �ttltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� ���Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� ���Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt����lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltlt��llt��l�l�l�l�l�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � r_� ���� ��II�Iltttttttttt��� r_ �I�I�Irtttttttit�l�l�l�l���—� ooh 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 27 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 5 Basin E5/P5 Hydrograph type = SBUH Runoff Peak discharge = 0.177 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 2,561 cult Drainage area = 0.230 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.230 x 98)] 10.2M Basin E51P5 21 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 28 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 6 Basin E6/P6 Hydrograph type = SBUH Runoff Peak discharge = 0.054 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 779 cult Drainage area = 0.070 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.0]0 x 98)] / 0.0]0 Basin E6/136 r_ 6 66 6 66 f f .f .r -:r .rr f :-r •.r r:r ff f ..f .r Hydrograph Report 29 HydraMwHydroraphs F ension for AutocsW civil 308 by Autodesk, Inc. 0I= W ne ay, 09/9/2020 Hyd. No. 7 Unaffected Basins Hydrograph type = Combine Peak discharge = 1.188 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 17,074 cuft Inflow hyds. = 1, 2, 3, 4, 5, 6 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Unaffected Basins Hyd. No. 7 -- 2 Year Q (cfs) 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 — Hyd No. 1 — Hyd No. 2 — Hyd No. 3 Time (min) — Hyd No. 4 Hyd No. 5 — Hyd No. 6 30 Hydrograph Report HydraMwHydro raphsF ension for Auto csW Civil 3M by Autodesk, Inc. 0 I= We rn ay, 09/9/2020 Hyd. No. 9 Basin E7 Hydrograph type = SBUH Runoff Peak discharge = 0.231 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,340 cult Drainage area = 0.300 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.280 x W) ♦ (0.010 x 85)] / 0.300 Basin E7 ���Iltltltltwlltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltwrlltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt���lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltlw �tltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��Iltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl���Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��ttltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��i ltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� SO MR �����Il�.�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�llw�lltl��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0.05 0!4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 31 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 10 Basin E8 Hydrograph type = SBUH Runoff Peak discharge = 0.301 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 4,342 cult Drainage area = 0.390 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.390 x 98)] 10.390 Basin E8 0.05 0.05 —��������� 7!♦ f—I�f♦f♦�f♦f♦f♦f♦f♦f•�� 32 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 11 Basin E9 Hydrograph type = SBUH Runoff Peak discharge = 0.285 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 4,119 cult Drainage area = 0.370 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.370 x 98)] / 0.370 Basin E9 6 IN IN IN ���II!��Iltltlr�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 005 � 0.05 i�������_��� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 33 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 12 Basin E10 Hydrograph type = SBUH Runoff Peak discharge = 0.095 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 1,344 cult Drainage area = 0.130 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.110 x 08)+ (0.020 x 85)] 10.1 W Basin E10 Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltl�ltltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0111 r r Mkliiiiiiii�tttttttttttttl♦II♦II♦II♦II♦Iiiiiiiiiii�liiiiiiiiii�liiiiiiiiii� r r ��—�����Illl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl���lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltttttla��l�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0.01 �__� �Iltltltltltltl�lltltltltltltl�l�l�l�l�ta��l�l� 0.01 �� �Itttttttttt�ltttttttttt�l�l�l�l�l�lltltltltltltl�l�l�� Itttttttttt�i�ltttttttttt�l�l(_I�I�I�I�I�I�I� r_ 000 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 34 Hydrograph Report HydraBow Hydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 13 Basin E11 Hydrograph type = SBUH Runoff Peak discharge = 0.184 cfs Storm frequency = 2 yrs Time to peak = 478 min Time interval = 2 min Hyd. volume = 2,691 cult Drainage area = 0.370 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.070 x 98) ♦ (0.300 x 85)] / 0.370 Basin E11 MI ���Ir�lltltltltltltl�lltltltltltlt���— ����� 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hydrograph Report 35 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 14 Ex. Affected Basins Hydrograph type = Combine Peak discharge = 1.095 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 15,837 cuft Inflow hyds. = 9, 10, 11, 12, 13 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Ex. Affected Basins Hyd. No. 14 -- 2 Year Q (cfs) 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 14 — Hyd No. 9 — Hyd No. 10 — Hyd No. 11 Time (min) — Hyd No. 12 — Hyd No. 13 Hydrograph Report 36 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 15 Ex. Site Hydrograph type = Combine Peak discharge = 2.283 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 32,910 cuft Inflow hyds. = 7, 14 Contrib. drain. area = 0.000 ac Q (cfs) 3.00 2.00 1.00 0.00 V' 0 120 240 36 Hyd No. 15 Fac. Site Hyd. No. 15 -- 2 Year 0 480 600 720 840 960 Hyd No. 7 — Hyd No. 14 Q (cfs) 3.00 2.00 1.00 nL 10.00 1080 1200 1320 1440 1560 Time (min) Q (cfs) 3.00 2.00 1.00 nL 10.00 1080 1200 1320 1440 1560 Time (min) 37 Hydrograph Report HydraMwHydrographs Falension fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 21M Hyd. No. 17 Basin P7 Hydrograph type = SBUH Runoff Peak discharge = 0.216 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,117 cult Drainage area = 0.280 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.2]0 x 08) ♦ (0.010 x 85)] 10.2W Basin P7 AM 01 OWT 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 38 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 18 Basin P8 Hydrograph type = SBUH Runoff Peak discharge = 0.219 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,112 cult Drainage area = 0.290 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.280 x W) ♦ (0.030 x 85)] / 0.280 Basin P8 MI 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 39 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 19 Basin P9/10 Hydrograph type = SBUH Runoff Peak discharge = 0.407 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 5,794 cult Drainage area = 0.540 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.500 x 98) ♦ (OD40 x 85)] / 0.540 Basin P9/10 r r M0,01 r r Nmop r r l��������� f r MM am66 r f -f .r -:r .rr f :-r •.r r:r ff f --f .r 40 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 20 Basin P11 Hydrograph type = SBUH Runoff Peak discharge = 0.224 cfs Storm frequency = 2 yrs Time to peak = 478 min Time interval = 2 min Hyd. volume = 3,273 cult Drainage area = 0.450 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.30 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a ` Canposite(Area/CN)=](0.O x 98)+(0.390 x 85)]/ OA50 Basin P11 1 1�������fit r`������� 000 1 Hydrograph Report 960 41 HydraMwHydrographs Fatension fa Auto csW civil 3M by Autodesk, Inc. J I= W ne ay, 09 19 / 21M Hyd. No. 21 Pr. Affected Basins Hydrograph type = Combine Peak discharge = 1.063 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 15,296 cuft Inflow hyds. = 17, 18, 19, 20 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Pr. Affected Basins Hyd. No. 21 -- 2 Year 0.00 0 120 240 360 480 600 — Hyd No. 21 — Hyd No. 17 — Hyd No. 20 720 840 960 Hyd No. 18 Q (cfs) 2.00 1.00 ' 0.00 1080 1200 1320 1440 1560 Time (min) Hyd No. 19 Hydrograph Report 42 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 22 Pr. Site Hydrograph type = Combine Peak discharge = 2.252 cfs Storm frequency = 2 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 32,370 cuft Inflow hyds. = 7, 21 Contrib. drain. area = 0.000 ac Q (cfs) 3.00 2.00 1.00 0.00 fir 0 120 240 36 Hyd No. 22 Pr. Site Hyd. No. 22 -- 2 Year 0 480 600 720 840 960 Hyd No. 7 — Hyd No. 21 Q (cfs) 3.00 2.00 1.00 IL1 0.00 1080 1200 1320 1440 1560 Time (min) Q (cfs) 3.00 2.00 1.00 IL1 0.00 1080 1200 1320 1440 1560 Time (min) 43 Hydrograph Summary Report Hytlraitow Hytlrographs Extension for Autodesk® Civil 304s by Aulotlesic, Inc. J2020 Hyd M. Hytrograph M. (ein9n) Paas flow (mss) T.ne inleraal (mi-) Ti me to Peak (min) Hyd. volume (—ft) Inflow hyrl(s) Maximum d..Uan (fl) Tole) sirs. useE (cult) Hytlmgraph Besemplixn 1 SBUH Runoff 0.408 2 474 5,821 ---- --- --- Basin ElRl 2 SBUH Runoff 0.138 2 474 1,988 ---- --- --- Basin E21P2 3 SBUH Runoff 0.834 2 474 9,277 ---- --- --- Basin E31P3 4 SBUH Runoff 0238 2 474 3,479 ---- --- --- Basin E4R4 5 SBUH Runoff 0261 2 474 3,810 ---- --- --- Basin EatP5 6 SBUH Runoff 0.079 2 474 1,160 ---- --- --- Basin E6R6 7 Combine 1]56 2 474 25,534 1,2,3, --- --- Unaffected Basins 4, 5, 6 9 SBUH Runoff 0.340 2 474 4,970 ---- --- --- Basin E7 10 SBUH Runoff 0.442 2 474 6,461 ---- --- --- Basin E8 11 SBUH Runoff 0.419 2 474 6,129 ---- --- --- Basin E9 12 SBUH Runoff 0.143 2 474 2,045 ---- --- --- Basin E10 13 SBUH Runoff 0.320 2 476 4,539 ---- --- --- Basin Ell 14 Combine 1.664 2 474 24,143 9, 10, 11, --- --- Ex. Affected Basins 12,13 15 Combine 3.420 2 474 49,68 7,14 --- --- Ex. Site 17 SBUH Runoff 0.317 2 474 4,838 ---- --- --- Basin P7 18 SBUH Runoff 0.325 2 474 4,682 ---- --- --- Basin P8 19 SBUH Runoff BAN 2 474 8,719 ---- --- --- Basin PW10 20 SBUH Runoff 0.389 2 476 5,520 ---- --- --- Basin Pll 21 Combine 1.635 2 474 23,559 17,18,19, --- --- Pr. Affected! Basins 20 22 Combine 3.391 2 474 49,093 7,21 --- --- Pr. ate PAR36- Site Basins.gpw Return Period: 25 Year Wednesday, 0919 12020 44 Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 3M by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 1 Basin E1/P1 Hydrograph type = SBUH Runoff Peak discharge = 0.408 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 5,821 cult Drainage area = 0.370 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.300 x 03)+ (0.0]0 x 33)] / 0.370 Basin E1/P1 tl ��������� 0t 01 mol MM am � � ���IlA�lltltltl��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � 66 r r -r .r -:r .rr r :-r •.r r:r rr r --r .r 45 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 2 Basin E2/P2 Hydrograph type = SBUH Runoff Peak discharge = 0.136 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 1,988 cult Drainage area = 0.120 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0420 x 88)] / 0420 Basin E2/P2 ������� ��r.lttttttttttttr•Ir_Ir_Ir_Ir_Ir_ 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 F Hydrograph Report HydraMwHydrographs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= W ne ay, 09/9/2020 Hyd. No. 3 Basin E3/P3 Hydrograph type = SBUH Runoff Peak discharge = 0.634 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 9,277 cult Drainage area = 0.560 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.580 x 98)] / 0580 Basin E3/P3 Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� r .r Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� r .r Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� r ;r Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� r ;r Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt�llt� IN ���� � Il�llt�llt�llt�llt�llt���� Ilt�llt�llt�ll��Ilt�llt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt� �I�Ilt�llt�llt�llt�llt�llt�llt�llt� Ilt�llt�llt�llt� mot�Ilt�llt�llt�llt�llt�llt�llt�llt� Op �Ilt�llt�llt�llt�llt�llt�llt�llt� ON It�llt�llt�llt�llt�llt�llt�llt�llt� MOM Ilt�llt�llt�llt��r�llt�llt�llt�llt�llt�llt�llt�llt� r r Ilt�llt�llt�llt��llr�llt�llt�llt�llt�llt�llt�llt�llt� r r Ilt� llt� llt� llt� � lltr � llt� llt� llt� llt� llt� llt� llt� llt� Ilt� llt� llt� llA� llt�� llt� llt� llt� llt� llt� llt� llt� llt� Ilt�llt�llt��i�llt�'_��Ilt�llt�llt�llt�llt�llt�llt� 0.10 0.10 Iltt� �� llt� � l� litittttttttt� l� l� l� � � t� llt� I�it�l��lttttttttttt�l�l�l�l�l�l�ttt� � 000 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 47 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 4 Basin E4/P4 Hydrograph type = SBUH Runoff Peak discharge = 0.238 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,479 cult Drainage area = 0.210 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) =1(0.210 x 88)] / 0.210 Basin E4/P4 01 mop �����Ilr�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltl��lltl��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltt�lltltlt���l�lltltltltltltlIIIN����1���� 0. 00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 48 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09/9/2020 Hyd. No. 5 Basin E5/P5 Hydrograph type = SBUH Runoff Peak discharge = 0.261 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 3,810 cult Drainage area = 0.230 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposite (Area/CN) = ](0.230 x 98)] 10.2M Basin E5/P5 �����Itltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl���� ���� � rttttttttt�tltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltt���� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltlt��Itltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl�MIltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��Itltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��lltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltl��tltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt��i ltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �iltltltltltlt�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� �I ltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� moll Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt� ���Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltlt����lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� � � Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltlt��llr�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltlt��llt��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltlt��lltlt��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� �� Iltltltltltltl�lltltltltltltl�lltltlt�tlltltltltltl�lltltltltltlr �I�I�I�I�Iltltltltltltl�lltltltltltltl�lltltltltltltl� �� Il�lltl� ��r�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltltl� OF on ��Iltltltltltltl�Il�ltltltltltltl�Il�ltltltltltltl�Iltlttltttlttttttttttltti�� ll�ltltltltltltl�ll�ltltltltltltl�ll�ltltltltltltl�ll�ltltltltltltl�llllttilttltttlrtlrtrl�tl��lltltltltltltl��lltltlt� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 49 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 6 Basin E6/P6 Hydrograph type = SBUH Runoff Peak discharge = 0.079 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 1,160 cult Drainage area = 0.070 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.0]0 x 98)] / 0.0]0 Basin E6/136 01 moll I• ���� ���������� I I, I I I .I :I .11 I :I •.I I:I 11 I I .I Hydrograph Report 50 HydraMwHydroraphs F ension for AutocsW civil 3M by Autodesk, Inc. 0I= W ne ay, 09/9/2020 Hyd. No. 7 Unaffected Basins Hydrograph type = Combine Peak discharge = 1.756 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 25,534 cuft Inflow hyds. = 1, 2, 3, 4, 5, 6 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Unaffected Basins Hyd. No. 7 -- 25 Year Q (cfs) 2.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 — Hyd No. 1 — Hyd No. 2 — Hyd No. 3 Time (min) Hyd No. 4 — Hyd No. 5 — Hyd No. 6 51 Hydrograph Report HydraMwHydroraphs F ension for AutocsW Civil 308 by Autodesk, Inc. 0I= We rn ay, 09 /9 /20211 Hyd. No. 9 Basin E7 Hydrograph type = SBUH Runoff Peak discharge = 0.340 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 4,970 cult Drainage area = 0.300 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Cc nposte (Area/CN) =1(0.280 x W) ♦ (0.010 x 85)] / 0.300 Basin E7 01 MI mol MR 0.05 ��—�IIIIIIIIIIIIIir.�IIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIII�IIIIIIIIIIIIII� IIIIIIIIIIIIII�IIIIIIIt� tltllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�lllllllllll����llllllllllllll�llllllllllllll�llllllllllllll� II11111111111� �Illllllllttttt��l�lt�l�l�l�ltttllrr���� Iii o �� ��Illlllllllllll�lllllllllllltt��lttttttttil�llllllllllllll�llllllllllllll�llllllllllllll�llllllllllllll�lllllllllllllr��t� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 52 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 10 Basin E8 Hydrograph type = SBUH Runoff Peak discharge = 0.442 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 6,461 cult Drainage area = 0.390 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.390 x 98)] 10.390 Basin E8 MR No I I I .I :I .11 I :I •.I I:I 11 I I .I 53 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 11 Basin E9 Hydrograph type = SBUH Runoff Peak discharge = 0.419 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 6,129 cult Drainage area = 0.370 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.370 x 98)] / 0.370 Basin E9 001 mof No ���—Iltltltiv��lltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlwlltltltltlw 66 rr Iltltltltlwlltltlt�itltltltltlwlltltltltlwl�l�l����lltltltltlwlltltltltlwlltltltltlw rr f f -r .r -:r .rr f :-r •.r r:r ff f --f .r 54 Hydrograph Report HydraMwHydrographs Extension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 12 Basin E10 Hydrograph type = SBUH Runoff Peak discharge = 0.143 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 2,045 cult Drainage area = 0.130 ac Curve number = 96* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.110 x 08)+ (0.020 x 85)] 10.1 M Basin E10 r r Iltltltltltltl�lltltltltltltl�lltltltltltltl�l��<��������� r r -� ��f♦f♦f♦��� --LEI 00 trrrrrr ���t���������� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 55 Hydrograph Report HydraBow Hydrographs Eatenswn fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 13 Basin E11 Hydrograph type = SBUH Runoff Peak discharge = 0.320 cfs Storm frequency = 25 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 4,539 cult Drainage area = 0.370 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.070 x 98) ♦ (0.300 x 85)] / 0.370 Basin E11 6 6fill moll ON r.ENI IN 1 �7 r_ 111 r f -f .r -:r .rr f :-r •.r r:r ff f --f .r Hydrograph Report 56 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 14 Ex. Affected Basins Hydrograph type = Combine Peak discharge = 1.664 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 24,143 cult Inflow hyds. = 9, 10, 11, 12, 13 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Ex. Affected Basins Hyd. No. 14 -- 25 Year 0.00—'- 0 120 240 360 480 600 Hyd No. 14 — Hyd No. 9 Hyd No. 12 720 840 960 Hyd No. 10 — Hyd No. 13 Q (cfs) 2.00 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 Hydrograph Report 57 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 15 Ex. Site Hydrograph type = Combine Peak discharge = 3.420 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 49,677 cuft Inflow hyds. = 7, 14 Contrib. drain. area = 0.000 ac Q (ofs) 4.00 3.00 2.00 1.00 0.00 I . 0 120 240 36 Hyd No. 15 Fes(. Site Hyd. No. 15 -- 25 Year 0 480 600 720 840 960 Hyd No. 7 — Hyd No. 14 Q (cfs) 4.00 3.00 2.00 1.00 W I0.00 1080 1200 1320 1440 1560 Time (min) Q (cfs) 4.00 3.00 2.00 1.00 W I0.00 1080 1200 1320 1440 1560 Time (min) 58 Hydrograph Report HydraMwHydrographs Falenswn fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 20211 Hyd. No. 17 Basin P7 Hydrograph type = SBUH Runoff Peak discharge = 0.317 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 4,638 cult Drainage area = 0.280 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.2]0 x 08) ♦ (0.010 x 85)] 10.2W Basin P7 IN motON MIK ME Ilt�llt�llt��itlt�llt���llt�llt�llt�llt�llt�llt�llt� 0.05 0.05 Iltt� �� llt� ltttttttttr l� l� l� l� l� � � t� llt� I�11 i itttttttttrlttttttttttt�l�l�l�l�l�l�atar� 000 1 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 59 Hydrograph Report HydraMwHydrographs e4lension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 18 Basin P8 Hydrograph type = SBUH Runoff Peak discharge = 0.325 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 4,682 cult Drainage area = 0.290 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](0.280 x 98) ♦ (0.030 x 85)] / 0.290 Basin P8 mot ME ���In�lltltlt��lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� Iltltltltltltl� lltltltltltltl� lltltltltltltl� �r � � � � � � � � � � 0.0 0.05 I��Jl�ltttttttttt�l�l�l�l�l�a��atrt�ltttttttttt� I� Ittttttttttt� ltti� l� l� l� l� l� lttttttttttt� lrr� t_ 00 ().Or 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 I Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 19 Basin P9/10 Hydrograph type = SBUH Runoff Peak discharge = 0.604 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 8,719 cult Drainage area = 0.540 ac Curve number = 97* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) =1(0.500 x 98) ♦ (OD40 x 85)] / 0.540 Basin P9/10 ���� � I�Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�ltttttttttt�ltttttttttt�ltttttttttt� Iltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltl��a�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl�lltltltltltltl� 0.10 0.10 f—I�f♦f♦�f♦f♦f♦f♦f♦f•�� 11 0.00 61 Hydrograph Report HydraMwHydrographs Fatension fa Auto csW Civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 20 Basin P11 Hydrograph type = SBUH Runoff Peak discharge = 0.389 cfs Storm frequency = 25 yrs Time to peak = 476 min Time interval = 2 min Hyd. volume = 5,520 cult Drainage area = 0.450 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.80 in Distribution = Type IA Storm duration = 24 hrs Shape factor = n/a `Canposite (Area/CN) = ](O.OW x 98) ♦ (0.390 x 85)] / OA50 Basin P11 . 20 25 Year Q (cfs) Mop Iltltltltltltl�lltltltltltltl�lltltltltltltl�—Iltltltltltltl�lltltltltltltl�lltltltt�� �_���� r rr r f .r .r -:r .rr f :-r •.r r:r ff f ..f .r Hydrograph Report 960 62 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 21 Pr. Affected Basins Hydrograph type = Combine Peak discharge = 1.635 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 23,559 cuft Inflow hyds. = 17, 18, 19, 20 Contrib. drain. area = 1.560 ac Q (cfs) 2.00 1.00 Pr. Affected Basins Hyd. No. 21 -- 25 Year 0.00 0 120 240 360 480 600 Hyd No. 21 — Hyd No. 17 — Hyd No. 20 720 840 960 Hyd No. 18 Q (cfs) 2.00 1.00 ' 0.00 1080 1200 1320 1440 1560 Time (min) Hyd No. 19 Hydrograph Report 63 HydraMwHydrographs Fatension fa Auto csW civil 308 by Autodesk, Inc. J I= W ne ay, 09 19 / 2020 Hyd. No. 22 Pr. Site Hydrograph type = Combine Peak discharge = 3.391 cfs Storm frequency = 25 yrs Time to peak = 474 min Time interval = 2 min Hyd. volume = 49,093 cuft Inflow hyds. = 7, 21 Contrib. drain. area = 0.000 ac Q (ofs) 4.00 3.00 2.00 1.00 0.00 I . 0 120 240 36 Hyd No. 22 Pr. Site Hyd. No. 22 -- 25 Year 0 480 600 720 840 960 Hyd No. 7 — Hyd No. 21 Q (cfs) 4.00 3.00 2.00 1.00 W I0.00 1080 1200 1320 1440 1560 Time (min) Q (cfs) 4.00 3.00 2.00 1.00 W I0.00 1080 1200 1320 1440 1560 Time (min) Parr Lumber — Phase 2 Stormwater Management Report APPENDIX D - CONVEYANCE r Drainage Conveyance Parr Lumber - Phase 2 Prepared by Harper Houf Peterson Righellis Inc. Job No. PAR -SO September 9, 2020 Pipe Segment Pipe Size (In) Mannings n H Slope (%) Contributing Basin I Qx I (cfs) QppppCRY (cfs) Min, Slope (%) Velocity Full (fps) Capacity Met? Rain Garden A Outfall 6 0.014 1,00% PS 0.24 0.52 0.21% 2.85 VES Rain Garden B Outlell 6 0.014 1.00% P9110 0.45 0.52 0]5% 2.65 VES AA Transmittal Ankrom Moisan 38 NW Davis / Suite 300, Portland, OR 97209 PROJECT: Parr Lumber- Springfield TI DATE: 12/22/2020 194250 SUBJECT: Parr Lumber - Springfield, TRANSMITTAL ID: 00001 PURPOSE: For your review and comment VIA: Info Exchange FROM NAME COMPANY EMAIL PHONE Melinda McMillan 12/22/2020 2020 10 22 City of Springfield Parr Lumber Conditional Approval Letter Annotated. df 38 NW Davis/Suite 300 12/18/2020 melindam@ankrommoisan.co or.gov 12/22/2020 Parr Springfield Phase 2 - O&M Plan.pdf +1(503)892-5352 Portland OR 97209 12/22/2020 m United States 12/17/2020 Revised Architectural Plan LU Permit Set -1 2-18-20.pdf TO NAME COMPANY EMAIL PHONE smorris@springfeld- 12/22/2020 2020 10 22 City of Springfield Parr Lumber Conditional Approval Letter Annotated. df 1 12/18/2020 smorris@springfeld-or.gov or.gov 12/22/2020 Parr Springfield Phase 2 - O&M Plan.pdf REMARKS: Shannon - I appreciate your help in getting our revised LU documents submitted. All conditions of our LU Approval have been incorporated; I've added notes on the City letter in the Summary as responses. Please let me know if there is additional information I can provide. Enjoy your holidays, Melinda McMillan DESCRIPTION OF CONTENTS CITY DATED TITLE NOTES 1 12/22/2020 2020 10 22 City of Springfield Parr Lumber Conditional Approval Letter Annotated. df 1 12/18/2020 HHPR Parr Springfield Phase 2- LU Set.pdf 1 12/22/2020 Parr Springfield Phase 2 - O&M Plan.pdf 1 12/22/2020 Parr Springfield Phase 2 - Stormwater Report.pdf 1 12/17/2020 Revised Architectural Plan LU Permit Set -1 2-18-20.pdf COPIES: Mariah Kiersey David Frank (Ankrom Moisan Architects, Inc.) (Parr Lumber) Page 1 of 1