HomeMy WebLinkAboutPacket, DIM PLANNER 12/22/2020DEVELOPMENT ISSUES MEETING FORM
APPLICANT: Cindy Koza
MEETING DATE/TIME: Thursday, January 21, 2021, 1:30 — 2:30
PLACE: Virtual via GoToMeeting
CONTACT PERSON: Andy Limbird
Current Planning Staff: J Donovan, L Miller, A Limbird, M Rust, D Larson, M Cari6o
Jeff Paschall, City Engineer, DPW
✓ Kyle Greene, Managing Civil Engineer—DPW
Ken Vogeney, Emergency Manager (DPW)
Clayton McEachem, Civil Engineer, Development & Public Works
Matt Stouder, Environmental Services Div. Manager/MWMC General Manager
Kristi Krueger, Principal Engineer, Development & Public Works
✓ Michael Liebler, Transportation Planning, Civil Engineer, Development @. Public Works
✓ Eric Phillips -Meadow, Deputy Fire Marshal 2, Fire & Life Safety Department
Ben Gibson, Maintenance Supervisor, Development & Public Works
Eric Adams, Planning, Willamalane Park and Recreation District
✓ Ladd Boyce, Keoki Lapina, Springfield Utility Board (Water)
Greg Miller, Springfield Utility Board (Water)
✓ Sanjeev King, Nick Amann, Springfield Utility Board (Electric)
Amy Chinitz, Springfield Utility Board (DWP)
Thomas Jeffreys, (EPUD) Emerald Peoples Utility District
Michael Wargo, Wllarrelane Park and Recreation District
Matt Caswell, Planning & Development Manager, ODOT, State Highway Division
(odotr2planngr@odot.smte.or. us)
Brad Rudler, (Electric) Eugene Water and Electric Board
Wallace McCullough, (Water), Eugene Water and Electric Board
Brett Yancey, Chief Operations Officer; Springfield Public Schools
Chris Reiersgaard, Asst. Director of Facilities & Operations; Springfield Public Schools
Safe Routes to School, Springfield Public Schools
✓ Chris Carpenter, DPW Building Official
Rick Lewis, Police Chief, Police Department
Tom Schwetz, LTD, Planning and Development Director
Luke Pilon, Centuryl-ink
Tom Boyatt, Community Development Manager, DPW
✓ Chris Moorhead, DPW City Surveyor
Sunny Washburn, Program Coordinator, Environmental Services
Sasha Vartanian, Lane County Transportation (Steve Gallup, oc only)
Tom Boyatt, Interim Development and Public Works Director
Marie Longworth, Central Lane Communications 911
Monte Brown, Northwest Natural Gas
Jason McDonald, Comcast Cable
Water Resource Coordinator, ESD
Jamie Porter, Rainbow Water District
Kristina Kraaz, City Attorney (Mary Bridget Smith upon specific request)
Courtney Griesel, Senior Management Analyst (EDM)
Brenda Jones, Administrative Specialist (DIM Annexations)
Please mark who you would like to attend this meeting and return form and
file to Shannon. Thanks!
Revised: 06/08/2020
DEVELOPMENT ISSUES
MEETING
DEVELOPMENT AND PUBLIC WORKS DEPARTMENT
SPRINGFIELD CITYHALL
225 FIFTH STREET
DPW Conference Room 6151616
Meeting Date: Thursday, January 21,2021 1;30-2;30
1. DEVELOPMENT ISSUES MTG #811 -20 -000241 -PRE 811-20-000250-PROJ Cindy Koza
Assessors Map: 18-02-03-11 TL 8000
Address: 67' Street
Existing Use: vacant
Applicant has submitted proposal for partition of .93 acre parcel on hillside.
Planner: Andy Limbird
The Development Issues Meeting informational packet for this meeting is available on-line for
you to review or print out @ Laserriche website: www.sorinafeld-or.aovtweblink8tbrowse.asox
VICINITY MAP
811 -20 -000241 -PRE Development Issues Meeting
18-02-03-11 TL 8000
67th Street
Cindy Koza
City of Springfield SPRINGFIELL
Development & Public Works
.N
225 Fifth Street
Springfield, OR 97477
Development Issues Meeting (DIM)
Revised 5/21/13 KL
f3
Development Issues Meeting Submittal Requirements Checklist
❑ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee
calculation formula. A copy of the fee schedule is available at the Development & Public
Works Department. The applicable application, technology, and postage fees are collected
at the time of complete application submittal.
❑ Development Issues Meeting Application Form
❑ Five (5) Questions - list specific questions the applicant would like staff to answer
during the meeting. So that each question
questions. may be fully evaluated, the list is limited to five
❑ Four (q) Copies of the Proposed Plan - suggested information valuable for staff to
review the proposal is listed below. It is not necessary to include all of these items on
the site or plot plan. However, applicants are encouraged to address as many as possible
given that the level of information that will be derived from the meeting is commensurate
with the level of detail provided in the application.
Applicants are also encouraged o include additional information on the plan as listed in
the Springfield Development Code (SDC) 5.12-120, Land Divisions - Partitions a
Submittal R - Tentative Plan Submittal Requirements or 5.17.120, Site Plan Review
Submittal Requirements.
❑ Drawn in Ink on quality paper no smaller than 11" x 17"
❑ Scale appropriate to the area involved and sufficient to show detail of the plan and
related data, such as 1" = 30, 1" = 50' or 1" = 100'
❑ North arrow
❑ Date of preparation
❑ Street address and assessor's map and tax lot number
❑ Dimensions (in feet) and size (either square feet or acres) of the development area
❑ Location and size of existing and proposed utilities, including connection points
❑ On-site drainage collection system and now patterns, the size and location of drain
lines and catch basins, dry wells, and natural drainageways to be retained
❑ Area and dimensions of all property to be conveyed, dedicated, or reserved for
common open spaces
DIMS Related to Land Divisions
❑ Approximate location, number and dimensions of proposed lots
❑ How streets in the proposal area connect with existing streets
DIMS Related to Site Plan Review
❑ Proposed and existing builcings: location, dimensions, size (gross floor area),
setbacks from property lines, distance between buildings, and height
❑ Area and percentage of the site proposed for buildings, structures, driveways,
sidewalks, patios and other impervious surfaces
❑ Parking and circulation plan
R-isod 5/21/13 KL
3 0/ 3
,I'.. i w
BASE MAP
FOR
IIARDINMOlA
s[cnoN J, PDWF lP la SOUTH, RAxOC l W[9,W*FE
SPRINGFIELD, OREGGN
DATE PREPARED.NOVEN9ER X10
ELOPFLECLAD
s I
R. D
a5%� R♦♦
EfRO PLAN'JING INC
R46 A STREET
SPPINGFIFLO,O -mo
<I.dO! 96;0/
Narrative and questions.
I recently purchased a lot located on 67`" Street, Map 18-02-03-11; TL 08000, which has substantial
slopes and I am trying to determine how many lots/parcels can be created. A surveyor has been on site
and has prepared a slope category map for your review. Please answer the following questions and
please point out anything else that I and Jed Truett have not thought of.
1. 1. Can I build 3lots here?
2. 2. What should I do for storm drainage? Onsite retaining wall or other?
3. 3. Are there any requirements for how the homes are positioned -towards the street or other?
4. Would a 20% variance to lot/parcel width and frontage requirements be allowed to allow for
additional parcels to be created? I'm assuming we are within the Hillside Overlay zone so the
question is whether those standards can also be reduced by up to 20% through the variance
process?
S. Anything else?
Thank you for your thoughtful time and consideration.
Cindy Koza